Home / Browse projects / Mumbai Suburban, Maharashtra / LABH SAPPHIRE
LABH SAPPHIRE
RG-MH-17690 · RERA P51800055284 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LABH SAPPHIRE is a Residential / Group Housing project by Labhartirealities in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055284 on 14 Mar 2024. Possession is promised by 31 Dec 2027. 15 of the 67 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.
At a glance
Project
- NameLABH SAPPHIRE
- TypeResidential / Group Housing
- Location
- S. V. ROAD
- ANDHERI (WEST)
- Andheri
- Mumbai Suburban
- 400058
- Pincode400058
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800055284
- ReraGenie IDRG-MH-17690
Builder
- NameLabhartirealities
- Entity typePartnership
- PartnersNIRAV DINESHBHAI BATAVIA, DINESHBHAI HEMATLAL BATAVIA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Mar 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed99 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LABH SAPPHIRE - WING A | NA | 9 | 6 | 21 | 2 | 23 |
| LABH SAPPHIRE - WING B | NA | 10 | 7 | 21 | 0 | 21 |
| LABH SAPPHIRE - WING C | NA | 10 | 7 | 23 | 0 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
LABH SAPPHIRE - WING A60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LABH SAPPHIRE - WING B60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LABH SAPPHIRE - WING C60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed193
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| LABH SAPPHIRE - WING A | 64 | 64 |
| LABH SAPPHIRE - WING B | 64 | 64 |
| LABH SAPPHIRE - WING C | 65 | 65 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ANDHERI RAHUL CO-OPERATIVE HOUSING SOCIETY LIMITED | Juhu | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LABH SAPPHIRE - WING A | NA | Rs 25.51 cr | Rs 13.88 cr |
| LABH SAPPHIRE - WING C | NA | Rs 18.18 cr | Rs 9.91 cr |
| LABH SAPPHIRE - WING B | NA | Rs 16.97 cr | Rs 9.25 cr |
| - | NA | Rs 4.65 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PUSHKAR CONSULTANTS |
| Engineer | BHAVIN MADHUSUDAN SHAH |
| Engineer | KISHORE S RAORANE |
| Chartered Accountant | MNJ AND ASSOCIATES |
| Chartered Accountant | CA Dinesh Rajgor |
| Partner | Role in project |
|---|---|
| Labhartirealities | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 21108/2023 | BOMBAY HIGH COURT | ONGOING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Labharti-Architect certificate-310326.pdf | 5 Jun 2026 |
| Withdrawal Update Form 2File: Labharti-Engineers Certificate-310326.pdf | 5 Jun 2026 |
| Withdrawal Update Form 3File: Labharti Form 3 March 2026 Signed Both.pdf | 5 Jun 2026 |
| Form 2A (FY 2023-2024)File: Labharti_Form 2A_FY 23-24_Signed.pdf | 24 Mar 2026 |
| Form 2A (FY 2024-2025)File: Labharti_Form 2A_FY 24-25_Signed.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: Architect Rera Certificate-Dec25-Signed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate-311225 Signed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 3File: Labharti Realities-Form 3-311225-Signed_Compressed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: RERA Architects Certificate-September 2025.pdf | 19 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate September 2025.pdf | 19 Feb 2026 |
| Withdrawal Update Form 3File: Labharti Realities-Form 3_300925-Signed.pdf | 19 Feb 2026 |
| Form 1File: Architect Certificate.pdf | 11 Feb 2026 |
| Form 2File: Engineer Certificate FORM - 2.pdf | 11 Feb 2026 |
| Form 3File: Labharti Realties_Form 3_310325_Final Signed.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31032025-Signed.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: Architect Rera Certificate 08-07-2025-Jun25.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate- June 2025.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: Labharti Form 3 - Jun 25-Final Signed.pdf | 11 Feb 2026 |
| Form 5 (FY 2024-2025)File: Labharti Form 5 Mar-25-Signed.pdf | 29 Jan 2026 |
| Form 1File: Form 1-310324-labharti-signed.pdf | 30 Jun 2025 |
| Form 2File: Form 2 -310324-labharti-signed.pdf | 30 Jun 2025 |
| Form 3File: labharti-Form 3-310324_SIGNED both_Compressed.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: labharti-sold disclosure-310324.pdf | 30 Jun 2025 |
| Form 1File: Form 1-300624-labharti-signed.pdf | 30 Jun 2025 |
| Form 2File: Form 2 -300624-labharti-signed.pdf | 30 Jun 2025 |
| Form 3File: Labharti Form 3 300624_compressed-SIGNED.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Labharti_Sold Inventory Disclosure 30062024-Signed.pdf | 30 Jun 2025 |
| Form 1File: Form 1-300924-labharti-signed.pdf | 30 Jun 2025 |
| Form 2File: Form 2 -300924-labharti-signed.pdf | 30 Jun 2025 |
| Form 3File: Labharti Form 3 300924_compressed-SIGNED.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Labharti_Sold Inventory Disclosure 30092024 updated.pdf | 30 Jun 2025 |
| Form 1File: Labharti-Architech Certificate-311224.pdf | 30 Jun 2025 |
| Form 2File: Labharti-Engineer Certificate -31122024.pdf | 30 Jun 2025 |
| Form 3File: Labharti-FORM 3-signed both.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Labharti Sold Inventory Disclosure 31122024-signed.pdf | 30 Jun 2025 |
| Form 5 (FY 2023-2024)File: LABHARTI REALTY_Form 5_Final_Signed_.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Labharti-Architech Certificate-311224.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Labharti-FORM 3-signed both.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Labharti-Engineer Certificate -31122024.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Labharti Sold Inventory Disclosure 31122024-signed.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Labharti_Sold Inventory Disclosure 30092024 updated.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-300624-labharti-signed.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-300924-labharti-signed.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Labharti Form 3 300624_compressed-SIGNED.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Labharti Form 3 300924_compressed-SIGNED.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -300624-labharti-signed.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -300924-labharti-signed.pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Labharti_Sold Inventory Disclosure 30062024-Signed.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LABHARTI REALTY_Form 5_Final_Signed_.pdf | 31 Dec 2024 |
| Proforma of Agreement for saleFile: Labh Sapphire Agreement for Sale-new.pdf | 25 Oct 2024 |
| Layout approvalFile: Amended approved plan 30-09-2024-1.pdf | 22 Oct 2024 |
| Building plan approvalFile: Amended approval 30-09-2024.pdf | 22 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 30-09-2024-1.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended approval 30-09-2024.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-310324-labharti-signed.pdf | 26 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -310324-labharti-signed.pdf | 26 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-labharti-310324.pdf | 26 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: labharti-Form 3-310324_SIGNED both_Compressed.pdf | 26 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: labharti-sold disclosure-310324.pdf | 19 Jun 2024 |
| Proforma of Agreement for saleFile: AFS Labharti Rahul CHS (Clean) 060224.pdf | 4 Mar 2024 |
| Other - TechnicalFile: Reply to point no 2 of technical query.pdf | 1 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: DECLARATION FOR FINANCE ENCUMBRANCE (3).pdf | 29 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: DECLARATION FOR LEGAL ENCUMBRANCE.pdf | 29 Feb 2024 |
| Details of encumbrances concerned to LegalFile: DECLARATION FOR FINANCE ENCUMBRANCE (3).pdf | 29 Feb 2024 |
| Details of encumbrances concerned to LegalFile: DECLARATION FOR LEGAL ENCUMBRANCE.pdf | 29 Feb 2024 |
| CERSAI detailsFile: CERSAI declaration.pdf | 29 Feb 2024 |
| Other - TechnicalFile: Annexure A - Declaration cum undertaking.pdf | 29 Feb 2024 |
| Proforma of Allotment letterFile: Allotment Letter Labh Sapphire Final.pdf | 27 Feb 2024 |
| Layout approvalFile: IOD approved plans-1.pdf | 12 Feb 2024 |
| Layout approvalFile: IOD approved plans-2.pdf | 12 Feb 2024 |
| Layout approvalFile: IOD approved plans-3.pdf | 12 Feb 2024 |
| Layout approvalFile: IOD approved plans-4.pdf | 12 Feb 2024 |
| Layout approvalFile: IOD approved plans-5.pdf | 12 Feb 2024 |
| Layout approvalFile: IOD approved plans-6.pdf | 12 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 03 No encumbrances concerned to finance.pdf | 12 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 04 No Encumbrances -legal.pdf | 12 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 03 No encumbrances concerned to finance.pdf | 12 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 04 No Encumbrances -legal.pdf | 12 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: IOD approved plans-1.pdf | 12 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: IOD approved plans-2.pdf | 12 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LABH SAPPHIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANDHERI (WEST)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 430 registered projects within 2 km.
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
Alpine Primo
ALPINE INFRAHEIGHTS LLP
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
See every Mumbai Suburban project, with the district possession charts
Builder: Labhartirealities
Labhartirealities has 1 registration on MahaRERA, including LABH SAPPHIRE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if LABH SAPPHIRE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LABH SAPPHIRE?
The registered promoter entity is Labhartirealities, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LABH SAPPHIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LABH SAPPHIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LABH SAPPHIRE?
The professionals named in the filing: Architect: PUSHKAR CONSULTANTS; Engineer: BHAVIN MADHUSUDAN SHAH; Engineer: KISHORE S RAORANE; Chartered Accountant: MNJ AND ASSOCIATES; Chartered Accountant: CA Dinesh Rajgor. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LABH SAPPHIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback