Registered No litigation declared Residential / Group Housing project

LA SERENA Tower 5, Tower 6 and Tower 7

By PEBBLE PARK DEVELOPERS LLP

RG-MH-05238 · RERA P51800050593 · Last updated on MahaRERA portal: 9 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 75%
81 of 165Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

LA SERENA Tower 5, Tower 6 and Tower 7 is a Residential / Group Housing project by PEBBLE PARK DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050593 on 21 Apr 2023. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 84 of the 165 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameLA SERENA Tower 5, Tower 6 and Tower 7
  • TypeResidential / Group Housing
  • Location
    • M G CROSS ROAD
    • Kandivali West
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • RERA no.P51800050593
  • ReraGenie IDRG-MH-05238

Builder

  • NamePEBBLE PARK DEVELOPERS LLP
  • Entity typePartnership
  • PartnersGulreen Raheja, VIJAY RAHEJA

Key dates

this monthRegisteredApr 2023First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings3 building records
  • Documents filed80 files

Current status

51%84 of 165 units booked
62.9%Work done, per cost certificate

Figures as on 9 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LA SERENA Tower 5NA242366066
LA SERENA Tower 6NA242366066
LA SERENA Tower 7NA242333033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 9 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

LA SERENA Tower 546%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LA SERENA Tower 646%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LA SERENA Tower 746%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,592 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on4 Jun 2025
LandownerVillageDistrict
Patel Nagar CHS LTDKandivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI29490.69
Proposed, not sanctioned1,324 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS ANA BUILDINGLINKING ROADSANTACRUZ W MUMBAI MAHARASHTRA 400054
Estimated costRs 110.79 cr
Cost incurredRs 69.70 cr
Work done62.91%
BuildingWingEstimatedIncurred
LA SERENA Tower 6NARs 46.43 crRs 29.21 cr
LA SERENA Tower 7NARs 33.20 crRs 20.89 cr
LA SERENA Tower 5NARs 31.16 crRs 19.60 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARUN PAGNIS
EngineerDEEPAK SHAH
Chartered AccountantARCHANARIKESH PARIKH
Chartered AccountantARCHANA PARIKH
Chartered AccountantVINAYAK CHETTIYAR
PartnerRole in project
PEBBLE PARK DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800050593/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2A engineer certificate Ending 31 3 26.pdf9 Sep 2026
Form 5 (FY 2025-2026)File: FORM 5 C A 1 4 25 to 31 3 26.pdf9 Sep 2026
Commencement certificateFile: 9243 FCC Issued letter 24-06-2026.pdf21 Jul 2026
Withdrawal Update Form 1File: Form - 1 - Architects Certificate.pdf21 Jul 2026
Withdrawal Update Form 2File: Form - 2 - Engineer Certificate.pdf21 Jul 2026
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf21 Jul 2026
Withdrawal Update Form 1File: form 1.pdf23 Apr 2026
Withdrawal Update Form 2File: form 2.pdf23 Apr 2026
Withdrawal Update Form 3File: form3.pdf23 Apr 2026
Withdrawal Update Form 1File: Form - 1 - Architects Certificate.pdf22 Jan 2026
Withdrawal Update Form 2File: Form - 2 - Engineer Certificate.pdf22 Jan 2026
Withdrawal Update Form 3File: form3.pdf22 Jan 2026
Withdrawal Update Form 1File: Form - 1 - Architects Certificate.pdf28 Oct 2025
Withdrawal Update Form 2File: Form - 2 - Engineer Certificate.pdf28 Oct 2025
Withdrawal Update Form 3File: CA FORM 3 SEPT 25 LA SARENA.pdf28 Oct 2025
Form 5 (FY 2024-2025)File: CA - FORM 5 25-09-2025.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate pdf.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Chartered Acct Cert.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Architects Certificate.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Engineer Certificate.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA - FORM 5 23-24.pdf20 Jan 2025
Layout approvalFile: 9243 Amended Drawing 29-08-2024_1 to 9_com.pdf18 Oct 2024
Layout approvalFile: 9243 Amended Drawing 29-08-2024_10 to 17_com.pdf18 Oct 2024
Building plan approvalFile: IOD 28-08-2024.pdf18 Oct 2024
Copy of Layout Approval (in case of layout)File: 9243 Amended Drawing 29-08-2024_1 to 9_com.pdf18 Oct 2024
Copy of Layout Approval (in case of layout)File: 9243 Amended Drawing 29-08-2024_10 to 17_com.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD 28-08-2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A (Quality Assurance) New Engg Cert.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Architect Certificate.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Engineer Certificate.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Oct23 to Dec-23Signed1.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Oct23 to Dec23signed1.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant Cert - Oct23 to Dec23 signed1.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Architect Certificate Signed.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Engineer Certificate-Signed.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA 30-9-23 - CA Certficate signed.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 LA SERENA.pdf28 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC upto 5th floor.pdf15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - Architect Certificate.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Engineer Certificate.pdf15 Jul 2023
Proforma of Agreement for saleFile: La Serena Sale Agreement_Draft.pdf15 Jul 2023
Layout approvalFile: LAYOUT.pdf11 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 Apr 2023
Layout approvalFile: Tower T5.pdf29 Mar 2023
Layout approvalFile: Tower T6 and T7.pdf29 Mar 2023
Copy of Layout Approval (in case of layout)File: Tower T5.pdf29 Mar 2023
Copy of Layout Approval (in case of layout)File: Tower T6 and T7.pdf29 Mar 2023
Declaration about Commencement CertificateFile: CC declaration.pdf29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Mar 2023
Copy of the legal title reportFile: Legal Title Report-Pebble Park Dev - Final.pdf27 Mar 2023
Building plan approvalFile: 9243 Amend letter.pdf20 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 9243 Amend letter.pdf20 Mar 2023
Layout approvalFile: 9243 issued Drawing_1-1.pdf15 Mar 2023
Layout approvalFile: 9243 issued Drawing_2-3.pdf15 Mar 2023
Layout approvalFile: 9243 issued Drawing_4-5.pdf15 Mar 2023
PAN CardFile: PAN_Pebble Park Developers LLP.pdf15 Mar 2023
Details of encumbrances concerned to FinanceFile: No encumbrance.pdf15 Mar 2023
Details of encumbrances concerned to LegalFile: No encumbrance.pdf15 Mar 2023
Copy of Layout Approval (in case of layout)File: 9243 issued Drawing_1-1.pdf15 Mar 2023
Copy of Layout Approval (in case of layout)File: 9243 issued Drawing_2-3.pdf15 Mar 2023
Copy of Layout Approval (in case of layout)File: 9243 issued Drawing_4-5.pdf15 Mar 2023
Declaration in FORM BFile: Form B.pdf15 Mar 2023
CERSAI detailsFile: Cersai declaration.pdf15 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signed by CA revised.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf15 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf15 Mar 2023
Proforma of Agreement for saleFile: maharera agreement.pdf15 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details letter.pdf15 Mar 2023
Deviation Report with respect to Allotment letterFile: No Deviation report allotment letter-Signed.pdf15 Mar 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation report Agreement for sale-Signed.pdf15 Mar 2023

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LA SERENA Tower 5, Tower 6 and Tower 7 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali West6,700+ in Mumbai Suburban

Builder: PEBBLE PARK DEVELOPERS LLP

PEBBLE PARK DEVELOPERS LLP has 1 registration on MahaRERA, including LA SERENA Tower 5, Tower 6 and Tower 7. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LA SERENA Tower 5, Tower 6 and Tower 7 is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LA SERENA Tower 5, Tower 6 and Tower 7?

The registered promoter entity is PEBBLE PARK DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LA SERENA Tower 5, Tower 6 and Tower 7?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LA SERENA Tower 5, Tower 6 and Tower 7?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LA SERENA Tower 5, Tower 6 and Tower 7?

The professionals named in the filing: Architect: ARUN PAGNIS; Engineer: DEEPAK SHAH; Chartered Accountant: ARCHANARIKESH PARIKH; Chartered Accountant: ARCHANA PARIKH; Chartered Accountant: VINAYAK CHETTIYAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LA SERENA Tower 5, Tower 6 and Tower 7?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LA SERENA Tower 5, Tower 6 and Tower 7. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LA SERENA Tower 5, Tower 6 and Tower 7 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.