Home / Browse projects / Mumbai Suburban, Maharashtra / Kurla Kadam Scoiety Phase 1
Kurla Kadam Scoiety Phase 1
RG-MH-26272 · RERA P51800006382 · Last updated on MahaRERA portal: 18 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- Litigation declared, 3 cases
- 60 complaints at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kurla Kadam Scoiety Phase 1 is a Others project by Pramod Pandurang Pisal in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006382 on 14 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 30 months from the original filing. 60 complaints are on record with the regulator.
At a glance
Project
- NameKurla Kadam Scoiety Phase 1
- TypeOthers
- Location
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800006382
- ReraGenie IDRG-MH-26272
Builder
- NamePramod Pandurang Pisal
- Entity typeIndividual
- Other registrations4 more →
- Completed2 of 5
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2022)
- Buildings4 building records
- Documents filed61 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rehab Building No 1 | NA | 8 | 0 | 0 | 0 | 0 |
| M M Residency | NA | 17 | 0 | 0 | 0 | 0 |
| Rehab Building 2 | NA | 13 | 0 | 0 | 0 | 0 |
| Rehab Building 3 | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 18 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 88%.
Rehab Building No 1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
M M Residency93%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 88% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Rehab Building 2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Rehab Building 3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M M Developers | Kurla | Mumbai Suburban |
| Spenta Infrastructure and Development Pvt Ltd | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vert Arch |
| Engineer | aaryaa reality |
| Chartered Accountant | ssk bansal& co |
| Partner | Role in project |
|---|---|
| Unity Land Consultancy | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCC was pending. Now Received Full CC. And RCC construction is complete. Finishing in progress
Reason as filed by the promoterThe following project is developed under the Slum Rehabilitation Scheme. Promoter no.1 is the LOI holder of the project. Promoter 1 further appointed Promoter 2 and Promoter 3 for development of said scheme. Litigations arised between the Promoter 2 and Promoter 3. Thereafter, promoter 3 had filed various legal complaints in various courts. Promoter 1 settled with promoter 3 all the complaints and issues regarding the said project and promoter 3 has withdrawn all the rights from the said project before Hon’ble Bombay High Court, Mumbai. And Promoter 1 started the pending work in 2021. The prom
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 123/2016 | City Civil Court | Pending |
| NA/2016 | Arbitration | Procreeding in progress |
| NA/2016 | Arbitration | Closed |
Complaints filed with MahaRERA60
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000203 | Abdul Rahim | Pramod Pandurang Pisal | 19/08/2017 |
| CC006000000000205 | Altaf Ishaq Bangi | Pramod Pandurang Pisal | 19/08/2017 |
| CC006000000000214 | Shahbuddin Siddique | Pramod Pandurang Pisal | 19/08/2017 |
| CC006000000000300 | BADRUDDIN KUTBUDDIN THAKUR | PRAMOD PANDURANG PISAL | 30/08/2017 |
| CC006000000000495 | Jagdish S. Shinde | Pramod P. Pisal (Unity Land Consultancy) & M M Developers | 24/09/2017 |
| CC006000000000813 | Qais Ayyub Daber | Pramod P. Pisal (Promoter of Unity Land Consultancy) & M M Developers | 24/09/2017 |
| CC006000000000984 | Sarla Vasudev Patil Jointly with Vasudev Supadu Patil | Pramod P. Pisal (Uniti Land Consultancy) & M M Developers | 05/10/2017 |
| CC006000000001016 | Rupali Vasudev Patil jointly with Vasudev Supadu Patil | Pramod P. Pisal (Unity Land Consultancy) & M. M. Developers | 05/10/2017 |
| CC006000000001104 | Mohamad Masroor Shaikh | Unity land Consultancy | 05/10/2017 |
| CC006000000001328 | FEROZ RASHID KHAN | PRAMOD PANDURANG PISAL | 12/11/2017 |
| CC006000000001388 | Imran Hasan Kazi | Pramod P. Pisal (Unity Land Consultancy) | 24/10/2017 |
| CC006000000001351 | Mr. Vasant Nivruti Bobade jointly with Mrs. Kamal Vasant Bobade | Promod P. Pisal (Unity Land Consultancy | 25/12/2017 |
| CC006000000012630 | Abdullah Mohd. Firoz Khan | Unity Land Consultancy | 27/12/2017 |
| CC006000000012687 | Pradeep Shinde | Unity Land Consultancy | 01/01/2018 |
| CC006000000012660 | Shirish Dinkar Kulkarni | Unity Land Consultancy | 29/12/2017 |
| CC006000000012675 | Vanita Sanjay Shinde | Unity Land Consultancy | 01/01/2018 |
| CC006000000012796 | Sanjay Prakash Metri | Unity Land Consultancy | 08/01/2018 |
| CC006000000022859 | Arif Haroon Shaikh | Unity Land Consultancy | 20/01/2018 |
| CC006000000022857 | Shivani Shashikant Shelar | Unity Land Consultancy | 17/01/2018 |
| CC006000000022852 | Shabanu Shaukatali Sayed | Unity Land Consultancy | 20/01/2018 |
| CC006000000022890 | Krishna Laxman Teke | Unity Land Consultancy | 18/01/2018 |
| CC006000000022892 | Nilesh Dattatreya Teke | Unity Land Consultancy | 18/01/2018 |
| CC006000000022982 | USMAN NOOR MOHAMMED DARIYA | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000023085 | MOHAMMED ABID MOMIN | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000023009 | Benny Elizabeth Titus | Unity Land Consultancy | 15/04/2018 |
| CC006000000023012 | Selva Ganapathy Selvaraj | Unity Land Consultancy | 03/03/2018 |
| CC006000000023094 | NANDLAL KISHORE BIND | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000022996 | IMROZ A BAIG | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000023083 | NAEEM KHAN | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000023005 | Sadikali Sabirali Shaikh | Unity Land Consultancy | 19/01/2018 |
| CC006000000023084 | PRAMOD GAJANAN SHINGARE | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000022995 | ABDUL REHMAN SULEMAN KALWETAR | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000022994 | Parvez Amir Mohammed Khan | PRAMOD PANDURANG PISAL | 25/01/2018 |
| CC006000000023023 | TUFAIL AHMED ABDUL QUDDUS | . PRAMOD PANDURANG PISAL.2. M M DEVELOPERS 3. SPENTA INFRASTRUCTURE AND DEVELOPMENT PVT. LTD. | 23/01/2018 |
| CC006000000023058 | Shaikh Lutfuddin | Unity Land Consultancy | 03/03/2018 |
| CC006000000023059 | Nijam F. Pathan | Unity Land Consultancy | 03/03/2018 |
| CC006000000054604 | Tabrez Mandviwala | Unity Land Consultancy | 23/05/2018 |
| CC006000000055859 | Pravin Kadam | Unity Land Consultancy | 20/08/2018 |
| CC006000000023590 | Nuruddin Mohd. Hussain Shaikh | Unity Land Consultancy | 09/03/2018 |
| CC006000000023413 | DEVDATT CHANDRAKANT MANJREKAR | PRAMOD PANDURANG PISAL | 27/02/2018 |
| CC006000000023663 | Ajita Oswald Rodrigues | Unity Land Consultancy | 09/03/2018 |
| CC006000000023666 | Bharat Bhupendra Parmar | Unity Land Consultancy | 16/04/2018 |
| CC006000000023755 | JANHAVI SIDDHESH WADKAR | PRAMOD PANDURANG PISAL | 24/03/2018 |
| CC006000000044040 | SIRAJ AHMED SHAIKH | PRAMOD PANDURANG PISAL | 17/05/2018 |
| CC006000000044129 | SANJAY RAMCHANDRA GAJBHIYE | PRAMOD PANDURANG PISAL | 17/05/2018 |
| CC006000000044192 | Mahesh K. Pol | Unity Land Consultancy | 30/04/2018 |
| CC006000000044348 | Leena Vilas Kulkarni | Unity Land Consultancy | 30/04/2018 |
| CC006000000044351 | Mahe Alam Imtiyaz Ahmed | Unity Land Consultancy | 30/04/2018 |
| CC006000000054583 | Parveen Aminullah Shah Syed | Unity Land Consultancy | 21/05/2018 |
| CC006000000055582 | Rizwan S. Ansari | Unity Land Consultancy | 17/08/2018 |
| CC006000000056223 | Tabrez Mandviwala | Unity Land Consultancy | 16/09/2018 |
| CC006000000056869 | Sanjay Chaube | Unity Land Consultancy | 10/11/2018 |
| CC006000000057485 | RAJU MAHADEORAO TAYADE | PRAMOD PANDURANG PISAL | 30/12/2018 |
| CC006000000078181 | VALMIK BHIMRAO NIKAM | MOHAMMED MASROORSHAIKH | 09/03/2019 |
| CC006000000195847 | SIDDHARTH LAXMAN SHINDE | UNITY LAND CONSULTANCY (PRAMOD P PISAL) | 06/02/2021 |
| CC006000000333969 | Aslam Abubakar Pawaskar | Pramod Pandurang Pisal | 23/02/2023 |
| CC006000000354448 | sakina mohammad khan | Pramod Pisal | 14/03/2023 |
| CC006000000354460 | Mohommad Nizam Khan | M/s. Unity Land Consultancy Private Limited | 23/02/2023 |
| CC006000000580930 | zafer syed | Pramod Pandurang Pisal | 26/06/2024 |
| CC12503220 | PRASHANT BHIMRAO BANGALE | Pramod Pandurang Pisal | 12/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 17-18.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: aryaa reality.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer certificate (1).pdf | 31 May 2024 |
| Building plan approvalFile: MM Residency Layout Plan.pdf | 29 May 2024 |
| Building Plan Approval (IOD)File: MM Residency Layout Plan.pdf | 29 May 2024 |
| Building plan approvalFile: MM Residency IOA and Plans_compressed.pdf | 13 May 2024 |
| Building Plan Approval (IOD)File: MM Residency IOA and Plans_compressed.pdf | 13 May 2024 |
| Declaration in FORM BFile: Form Kurla.pdf | 13 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5 FY 22-23.pdf | 13 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GetUserDocumentFileContent (15).pdf | 13 May 2024 |
| Disclosure of sold/ booked inventoryFile: DocScanner 14-May-2024 4-18 am_compressed.pdf | 13 May 2024 |
| Certificates of CA (Form 3)File: DocScanner 14-May-2024 3-42 am_compressed.pdf | 13 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.pdf | 13 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf | 13 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DocScanner May 13, 2024 1-20 PM.pdf | 13 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A March 22.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 23.pdf | 9 May 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200306253929_For_Asset_Based_Search_09_05_2024_23_28_38_257.pdf | 9 May 2024 |
| CERSAI detailsFile: DocScanner 9 May 2024 11-55 pm.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Scanned.pdf | 9 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Real Real Estate.pdf | 9 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DocScanner 9 May 2024 11-55 pm.pdf | 9 May 2024 |
| Layout approvalFile: MM Residency Layout Plan.pdf | 29 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: MM Residency Layout Plan.pdf | 29 Apr 2024 |
| Building plan approvalFile: MM-Residency-IOA Compressed.pdf | 14 Nov 2022 |
| Building Plan Approval (IOD)File: MM-Residency-IOA Compressed.pdf | 14 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: MM-Residency-CC.pdf | 14 Nov 2022 |
| Declaration about Commencement CertificateFile: Scanned Circular 32.pdf | 6 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Scanned Form 2A 2020_compressed.pdf | 6 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Scanned Form 2A 2021_compressed.pdf | 6 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Scanned Circular 29 _compressed (1).pdf | 6 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Scanned Form 5 2017-18_compressed.pdf | 6 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Scanned Form 5 2018-19.pdf | 6 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Scanned Form 5 2019-20.pdf | 6 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Scanned Form 5 2020-21.pdf | 6 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200241488271_For_Asset_Based_Search_05_07_2022_14_36_35_334.pdf | 5 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: kk.pdf | 27 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 123Architect Letter MahaRERA Letter .pdf | 21 Jun 2018 |
| Certificates of CA (Form 3)File: Unity Land Project Kurla Kadam Phase 1 CA Certificate-31072017.pdf | 31 Jul 2017 |
| Layout approvalFile: Unity Land Consultancy- non Apllcability-29-7-17.pdf | 29 Jul 2017 |
| Building plan approvalFile: Download File (5).pdf | 29 Jul 2017 |
| Building plan approvalFile: Download File (6).pdf | 29 Jul 2017 |
| Building plan approvalFile: Download File (7).pdf | 29 Jul 2017 |
| PAN CardFile: Pan Card Pramod Pisal.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Download File (16).pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Unity Land Consultancy- non Apllcability-29-7-17.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: Download File (6).pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: Download File (5).pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: Download File (7).pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VERTAECH-Certificate-29-7-17.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: C Form 2 Unity land Kurla Phase 1.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: ARTICLES OF AGREEMENT FORMAT.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Kurla Kadam Scoiety Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 366 registered projects within 2 km.
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Ruparel Crest
BHARAT MAHAN DEVELOPERS & BUILDERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
See every Mumbai Suburban project, with the district possession charts
Builder: Pramod Pandurang Pisal
Pramod Pandurang Pisal has 5 registrations on MahaRERA, including Kurla Kadam Scoiety Phase 1 and Highway View Phase 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Kurla Kadam Scoiety Phase 1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Kurla Kadam Scoiety Phase 1 is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kurla Kadam Scoiety Phase 1?
The registered promoter entity is Pramod Pandurang Pisal, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kurla Kadam Scoiety Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kurla Kadam Scoiety Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kurla Kadam Scoiety Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kurla Kadam Scoiety Phase 1?
The professionals named in the filing: Architect: Vert Arch; Engineer: aaryaa reality; Chartered Accountant: ssk bansal& co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kurla Kadam Scoiety Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback