Home / Browse projects / Pune, Maharashtra / Kumar Parv A, B, C, D AND E

Registered No litigation declared Others project

Kumar Parv A, B, C, D AND E

By Kumar Properties Lifespaces Private Limited

RG-MH-05699 · RERA P52100056164 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 60.00 crore secured on the land, in favour of STCI Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
10 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 50%
185 of 240Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Kumar Parv A, B, C, D AND E is a Others project by Kumar Properties Lifespaces Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100056164 on 16 May 2024. Possession is promised by 28 Dec 2031. 55 of the 240 units on this registration are recorded sold or booked, and 10 of 55 construction stages are filed complete.

At a glance

Project

  • NameKumar Parv A, B, C, D AND E
  • TypeOthers
  • Location
    • Moshi Road
    • Moshi - Borhadewadi
    • Borhadewadi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056164
  • ReraGenie IDRG-MH-05699

Builder

  • NameKumar Properties Lifespaces Private Limited
  • Entity typeCompany
  • DirectorsKewalkumar Kesarimal Jain, Ameya Inderkumar Jain
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2024PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion28 Dec 2031
  • Revised completionNone
  • Buildings5 building records
  • Documents filed121 files

Current status

23%55 of 240 units booked
34.2%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA191655661
BNA191549655
CNA191549655
DNA191759665
ENA44044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 50%.

A29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D14%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed569

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots569
Closed/Covered569
BuildingClosed/CoveredTotal
A140140
B127127
C127127
D143143
E3232

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area24,924 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSTCI Finance Limited
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI31844.7
Proposed, not sanctioned31,845 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch233, M G Road, Camp, Pune, Maharashtra-411001
Estimated costRs 114.84 cr
Cost incurredRs 39.24 cr
Work done34.17%
BuildingWingEstimatedIncurred
ANARs 30.36 crRs 10.41 cr
BNARs 29.19 crRs 7.32 cr
CNARs 25.60 crRs 7.51 cr
-NARs 17.23 crRs 9.43 cr
DNARs 8.80 crRs 4.30 cr
ENARs 3.68 crRs 27.82 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
EngineerDharitri Roy
EngineerAyub Banadar
Chartered AccountantSupriya Abhijit Mundada
Chartered AccountantGMKS & Co.
PartnerRole in project
Kumar Properties Lifespaces Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Dec 2031

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Page 16 - Building D (Layout Plan) (1).pdf16 Jun 2026
Building plan approvalFile: Page 17 - Building D FLoor Plans.pdf16 Jun 2026
Building plan approvalFile: Page 18 - Building D FLoor Plans.pdf16 Jun 2026
Building plan approvalFile: Page 19 - Building D (Elevation).pdf16 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A_March 2025_Signed.pdf22 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A_March 2026_Signed.pdf22 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate.pdf20 Apr 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf20 Apr 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf20 Apr 2026
Layout approvalFile: Page 1 - Highlighted (Tenament) (Parking) (Permissible and Sanctioned BUA) (2).pdf9 Apr 2026
Building plan approvalFile: Page 2.pdf9 Apr 2026
Building plan approvalFile: Page 3.pdf9 Apr 2026
Building plan approvalFile: Page 4.pdf9 Apr 2026
Building plan approvalFile: Page 5 - Building A (Layout).pdf9 Apr 2026
Building plan approvalFile: Page 6 - Building A FLoor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 7 - Building A (Elevation).pdf9 Apr 2026
Building plan approvalFile: Page 8 - Building B (Layout Plan).pdf9 Apr 2026
Building plan approvalFile: Page 9 - Building B Floor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 10 - Building B Floor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 11 - Building B (Elevation).pdf9 Apr 2026
Building plan approvalFile: Page 12 - Building C (Layout).pdf9 Apr 2026
Building plan approvalFile: Page 13 - Building C FLoor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 14 - Building C FLoor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 15 - Building C (Elevation).pdf9 Apr 2026
Building plan approvalFile: Page 16 - Building D (Layout Plan).pdf9 Apr 2026
Building plan approvalFile: Page 17 - Building D FLoor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 18 - Building D FLoor Plans.pdf9 Apr 2026
Building plan approvalFile: Page 19 - Building D (Elevation).pdf9 Apr 2026
Building plan approvalFile: Page 20 - Building E (Layout Plan and Elevation).pdf9 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf13 Jan 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf13 Jan 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf13 Jan 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf30 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf30 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Parv_ABCDE.pdf8 Sep 2025
Proforma of Agreement for saleFile: 250502_AFS_R1.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf19 Apr 2025
Copy of the legal title reportFile: 250401_Legal Title Report.pdf3 Apr 2025
Copy of the legal title reportFile: 250401_Legal Title Report_Format A.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: Kumar Parv - A, B, C, D and E.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_Signed.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf2 Dec 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240723_Decl about Grievance Redressal Cell.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.PDF22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf20 Jul 2024
Proforma of Agreement for saleFile: 240524_Flat AFS.pdf30 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Kumar Propertes Life Spaces (1).pdf10 May 2024
Other - LegalFile: ilovepdf_merged (15).pdf8 May 2024
Other - LegalFile: SALEDE 1compressed.pdf6 May 2024
Other - LegalFile: SALEDE 2 compressed.pdf6 May 2024
Other - LegalFile: SALEDE 3 compressed.pdf6 May 2024
Declaration in FORM BFile: 6_Form B.pdf29 Apr 2024
Building plan approvalFile: 12 Building Plan Approval _ NA Order for plotted development (5).pdf25 Apr 2024
Building plan approvalFile: 13 Building Plan Approval _ NA Order for plotted development (5).pdf25 Apr 2024
Building plan approvalFile: 14 Building Plan Approval _ NA Order for plotted development (5).pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 12 Building Plan Approval _ NA Order for plotted development (5).pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 13 Building Plan Approval _ NA Order for plotted development (5).pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 14 Building Plan Approval _ NA Order for plotted development (5).pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DOI_AIJ.pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DOI_KKJ.pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DOI_KPLPL.pdf25 Apr 2024
Proforma of Allotment letterFile: 240429_Allotment Letter.pdf25 Apr 2024
Proforma of Agreement for saleFile: SHOP AFS Final Kumar ABCDE.pdf25 Apr 2024
Proforma of Agreement for saleFile: Final Flat AFS- Kumar A B C D E.pdf25 Apr 2024
Deviation Report with respect to Allotment letterFile: 240502_Deviation Report Allotment Letter.pdf25 Apr 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (46).pdf25 Apr 2024
Deviation Report with respect to model copy of AgreementFile: 240509_Flat AFS Deviation Report_11zon.pdf25 Apr 2024
Layout approvalFile: Edited Plan_removed.pdf23 Apr 2024
Building plan approvalFile: Edited Plan_removed.pdf23 Apr 2024
Building plan approvalFile: ilovepdf_merged (16)_11zon.pdf23 Apr 2024
Building plan approvalFile: ilovepdf_merged (17)_11zon.pdf23 Apr 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Kumar Prospera - A3, A4 and A5P52100022619Magarpatta, PuneOct 2019CompletedApr 2024Apr 2024
Kumar Prospera - A1 and A2P52100014951Magarpatta, PuneJan 2018Certificate SignedFeb 2023Dec 2021

How this compares with Pune

23%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kumar Parv A, B, C, D AND E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi - Borhadewadi13,700+ in Pune

2 kmKumar Parv A, B, C, D ANCompleted 81Lapsed / revoked 44Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: Kumar Properties Lifespaces Private Limited

Kumar Properties Lifespaces Private Limited has 3 registrations on MahaRERA, including PLAYTOR CHAKAN MIDC-PHASE 1 and Kumar Parv F, G AND H. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kumar Parv A, B, C, D AND E is delayed beyond 28 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kumar Parv A, B, C, D AND E?

The registered promoter entity is Kumar Properties Lifespaces Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kumar Parv A, B, C, D AND E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kumar Parv A, B, C, D AND E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kumar Parv A, B, C, D AND E?

The professionals named in the filing: Architect: Vikas Achalkar; Engineer: Dharitri Roy; Engineer: Ayub Banadar; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kumar Parv A, B, C, D AND E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kumar Parv A, B, C, D AND E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kumar Parv A, B, C, D AND E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.