Home / Browse projects / Pune, Maharashtra / Kumar Parv A, B, C, D AND E
Kumar Parv A, B, C, D AND E
By Kumar Properties Lifespaces Private Limited
RG-MH-05699 · RERA P52100056164 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 60.00 crore secured on the land, in favour of STCI Finance Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kumar Parv A, B, C, D AND E is a Others project by Kumar Properties Lifespaces Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100056164 on 16 May 2024. Possession is promised by 28 Dec 2031. 55 of the 240 units on this registration are recorded sold or booked, and 10 of 55 construction stages are filed complete.
At a glance
Project
- NameKumar Parv A, B, C, D AND E
- TypeOthers
- Location
- Moshi Road
- Moshi - Borhadewadi
- Borhadewadi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100056164
- ReraGenie IDRG-MH-05699
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2024
- Promised completion28 Dec 2031
- Revised completionNone
- Buildings5 building records
- Documents filed121 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 19 | 16 | 55 | 6 | 61 |
| B | NA | 19 | 15 | 49 | 6 | 55 |
| C | NA | 19 | 15 | 49 | 6 | 55 |
| D | NA | 19 | 17 | 59 | 6 | 65 |
| E | NA | 4 | 4 | 0 | 4 | 4 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 50%.
A29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 6% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 12% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 18% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D14%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed569
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A | 140 | 140 |
| B | 127 | 127 |
| C | 127 | 127 |
| D | 143 | 143 |
| E | 32 | 32 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A | NA | Rs 30.36 cr | Rs 10.41 cr |
| B | NA | Rs 29.19 cr | Rs 7.32 cr |
| C | NA | Rs 25.60 cr | Rs 7.51 cr |
| - | NA | Rs 17.23 cr | Rs 9.43 cr |
| D | NA | Rs 8.80 cr | Rs 4.30 cr |
| E | NA | Rs 3.68 cr | Rs 27.82 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vikas Achalkar |
| Engineer | Dharitri Roy |
| Engineer | Ayub Banadar |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Kumar Properties Lifespaces Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 28 Dec 2031
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Page 16 - Building D (Layout Plan) (1).pdf | 16 Jun 2026 |
| Building plan approvalFile: Page 17 - Building D FLoor Plans.pdf | 16 Jun 2026 |
| Building plan approvalFile: Page 18 - Building D FLoor Plans.pdf | 16 Jun 2026 |
| Building plan approvalFile: Page 19 - Building D (Elevation).pdf | 16 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A_March 2025_Signed.pdf | 22 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A_March 2026_Signed.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 20 Apr 2026 |
| Layout approvalFile: Page 1 - Highlighted (Tenament) (Parking) (Permissible and Sanctioned BUA) (2).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 2.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 3.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 4.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 5 - Building A (Layout).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 6 - Building A FLoor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 7 - Building A (Elevation).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 8 - Building B (Layout Plan).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 9 - Building B Floor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 10 - Building B Floor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 11 - Building B (Elevation).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 12 - Building C (Layout).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 13 - Building C FLoor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 14 - Building C FLoor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 15 - Building C (Elevation).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 16 - Building D (Layout Plan).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 17 - Building D FLoor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 18 - Building D FLoor Plans.pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 19 - Building D (Elevation).pdf | 9 Apr 2026 |
| Building plan approvalFile: Page 20 - Building E (Layout Plan and Elevation).pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 30 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Parv_ABCDE.pdf | 8 Sep 2025 |
| Proforma of Agreement for saleFile: 250502_AFS_R1.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 19 Apr 2025 |
| Copy of the legal title reportFile: 250401_Legal Title Report.pdf | 3 Apr 2025 |
| Copy of the legal title reportFile: 250401_Legal Title Report_Format A.pdf | 3 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Kumar Parv - A, B, C, D and E.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold inventory.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_Signed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 2 Dec 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240723_Decl about Grievance Redressal Cell.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.PDF | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf | 20 Jul 2024 |
| Proforma of Agreement for saleFile: 240524_Flat AFS.pdf | 30 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Kumar Propertes Life Spaces (1).pdf | 10 May 2024 |
| Other - LegalFile: ilovepdf_merged (15).pdf | 8 May 2024 |
| Other - LegalFile: SALEDE 1compressed.pdf | 6 May 2024 |
| Other - LegalFile: SALEDE 2 compressed.pdf | 6 May 2024 |
| Other - LegalFile: SALEDE 3 compressed.pdf | 6 May 2024 |
| Declaration in FORM BFile: 6_Form B.pdf | 29 Apr 2024 |
| Building plan approvalFile: 12 Building Plan Approval _ NA Order for plotted development (5).pdf | 25 Apr 2024 |
| Building plan approvalFile: 13 Building Plan Approval _ NA Order for plotted development (5).pdf | 25 Apr 2024 |
| Building plan approvalFile: 14 Building Plan Approval _ NA Order for plotted development (5).pdf | 25 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12 Building Plan Approval _ NA Order for plotted development (5).pdf | 25 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 13 Building Plan Approval _ NA Order for plotted development (5).pdf | 25 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 14 Building Plan Approval _ NA Order for plotted development (5).pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DOI_AIJ.pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DOI_KKJ.pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DOI_KPLPL.pdf | 25 Apr 2024 |
| Proforma of Allotment letterFile: 240429_Allotment Letter.pdf | 25 Apr 2024 |
| Proforma of Agreement for saleFile: SHOP AFS Final Kumar ABCDE.pdf | 25 Apr 2024 |
| Proforma of Agreement for saleFile: Final Flat AFS- Kumar A B C D E.pdf | 25 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: 240502_Deviation Report Allotment Letter.pdf | 25 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (46).pdf | 25 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: 240509_Flat AFS Deviation Report_11zon.pdf | 25 Apr 2024 |
| Layout approvalFile: Edited Plan_removed.pdf | 23 Apr 2024 |
| Building plan approvalFile: Edited Plan_removed.pdf | 23 Apr 2024 |
| Building plan approvalFile: ilovepdf_merged (16)_11zon.pdf | 23 Apr 2024 |
| Building plan approvalFile: ilovepdf_merged (17)_11zon.pdf | 23 Apr 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kumar Prospera - A3, A4 and A5P52100022619 | Magarpatta, Pune | Oct 2019 | Completed | Apr 2024 | Apr 2024 |
| Kumar Prospera - A1 and A2P52100014951 | Magarpatta, Pune | Jan 2018 | Certificate Signed | Feb 2023 | Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kumar Parv A, B, C, D AND E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Moshi - Borhadewadi13,700+ in Pune
Filed coordinates, straight-line distance. 214 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Kumar Properties Lifespaces Private Limited
Kumar Properties Lifespaces Private Limited has 3 registrations on MahaRERA, including PLAYTOR CHAKAN MIDC-PHASE 1 and Kumar Parv F, G AND H. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kumar Parv A, B, C, D AND E is delayed beyond 28 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kumar Parv A, B, C, D AND E?
The registered promoter entity is Kumar Properties Lifespaces Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kumar Parv A, B, C, D AND E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kumar Parv A, B, C, D AND E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kumar Parv A, B, C, D AND E?
The professionals named in the filing: Architect: Vikas Achalkar; Engineer: Dharitri Roy; Engineer: Ayub Banadar; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kumar Parv A, B, C, D AND E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.