ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / KUKREJA CLASSIC

Registered No litigation declared Residential / Group Housing project

KUKREJA CLASSIC

By STK CORPORATION

RG-MH-68266 · RERA P51700017947 · Last updated on MahaRERA portal: 11 Dec 2020

Source: official MahaRERA filing

Red flags

  • 16 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
12 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 95%
16Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

KUKREJA CLASSIC is a Residential / Group Housing project by STK CORPORATION in Thane, Maharashtra, registered with MahaRERA as P51700017947 on 28 Sep 2018. Possession is promised by 30 Apr 2028. 16 complaints are on record with the regulator.

At a glance

Project

  • NameKUKREJA CLASSIC
  • TypeResidential / Group Housing
  • Location
    • PLOT NO. 2 SECTOR 16
    • SANPADA NAVI MUMBAI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400705
  • Pincode400705
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700017947
  • ReraGenie IDRG-MH-68266

Builder

  • NameSTK CORPORATION
  • Entity typePartnership
  • PartnerMOHAN TOLARAM KUKREJA
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2018PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Sep 2018
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KUKREJA CLASSIC WING ANA270000
KUKREJA CLASSIC WING BNA270000
KUKREJA CLASSIC WING CNA270000
KUKREJA CLASSIC WING DNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Dec 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 95%.

KUKREJA CLASSIC WING A49%
ActivityProgress
Excavation90%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KUKREJA CLASSIC WING B49%
ActivityProgress
Excavation90%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KUKREJA CLASSIC WING C49%
ActivityProgress
Excavation90%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KUKREJA CLASSIC WING D49%
ActivityProgress
Excavation90%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 11 Dec 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
OTHERS FITNESS CENTER SWIMMING POOL MEDITATION ZONE AND CHILDREN PLAY AREAYes0%

Parking filed265

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots265
Closed/Covered230
Open Space35
BuildingClosed/CoveredOpen SpaceTotal
KUKREJA CLASSIC WING A34034
KUKREJA CLASSIC WING B63063
KUKREJA CLASSIC WING C1320132
KUKREJA CLASSIC WING D13536

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,288 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16928.0
Proposed, not sanctioned16,928 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO1 ED EL PLOT NO 208 CENTRAL AVENUE ROAD CHEMBUR MUMBAI 400 071

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHITEN SETHI
PartnerRole in project
STK CORPORATION-

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC12500530Dipak LodhaSTK CORPORATION15/02/2025
CC12500610NIteshkumar JainSTK CORPORATION21/02/2025
CC12501557PRASAD DATTARAM PATILSTK CORPORATION12/05/2025
CC12501909Narendra Dharampal RajwanshiSTK CORPORATION11/06/2025
CC12501913Sunil Chandrakant GadeSTK CORPORATION11/06/2025
CC12502775MILIND SUDAM HANDESTK CORPORATION07/08/2025
CC12502800Amanpreet SUKHBIR RAJPUTSTK CORPORATION09/08/2025
CC12504339swagata maiti maitiSTK CORPORATION07/12/2025
CC12504340subrata rabindranath maitiSTK CORPORATION08/12/2025
CC12601793ALOK VISHWANATH JANASTK CORPORATION27/03/2026
CC12601925Asit JanaSTK CORPORATION01/04/2026
CC12602733Ujwala SATISH UDARESTK CORPORATION10/05/2026
CC12602735Chaitanya SATISH UDARESTK CORPORATION10/05/2026
CC12602736DEEPIKA Anandasayanam PILLAISTK CORPORATION11/05/2026
CC12604424JOHN JACOBSTK CORPORATION16/07/2026
CC12604457JOHN LONAPPAN JACOBSTK CORPORATION17/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Sep 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: K CLASSIC FORM 5.pdf11 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate classic_compressed.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 30 JUNE 19.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 30 SEPT 19.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 31 DEC 19_compressed.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 31 MARCH 19.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 30 JUNE 2020.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 30 SEPT 2020.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GIRISH GUPTA QUALITY ASSURANCE CERTIFICATE DT 31 MARCH 2020.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CLASSIC DEC 19.pdf29 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MARCH 19 KCLASSIC.pdf15 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUNE19 KCLASSIC.pdf15 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEPT 19 K CLASSIC.pdf15 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: KUKREJA CLASSIC CC.pdf30 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: D wing Plinth NOC.pdf30 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate-compressed.pdf30 Mar 2019
Certificates of CA (Form 3)File: KUKREJA CLASSIC (2).pdf30 Mar 2019
Layout approvalFile: layout plan.pdf18 Sep 2018
Copy of Layout Approval (in case of layout)File: layout plan.pdf18 Sep 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE (1)-converted.pdf18 Sep 2018
Building plan approvalFile: STK CORPORATION CC.pdf14 Sep 2018
PAN CardFile: STK COP PAN.pdf14 Sep 2018
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf14 Sep 2018
Details of encumbrancesFile: STK COP encumbrance.pdf14 Sep 2018
Building Plan Approval (IOD)File: STK CORPORATION CC.pdf14 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: STK CORPORATION CC.pdf14 Sep 2018
Declaration in FORM BFile: declaration.pdf14 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HSA.pdf14 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer.pdf14 Sep 2018
Certificates of CA (Form 3)File: rere certificate for kukreja classic sanpada.pdf14 Sep 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GEETANJALICTS NO 1098 PLOT NO 184 15TH ROAD CHEMBUR MUMBAI 400 07124CompletedDec 2017Dec 2017
GOLFSCAPPEBEHIND CELEBRATION HOTEL SION TROMBAY ROAD CHEMBUR MUMBAI 400071193CompletedAug 2010Aug 2010

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUKREJA CLASSIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANPADA NAVI MUMBAI7,600+ in Thane

2 kmKUKREJA CLASSICCompleted 15Lapsed / revoked 8Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: STK CORPORATION

STK CORPORATION has 1 registration on MahaRERA, including KUKREJA CLASSIC. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KUKREJA CLASSIC is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUKREJA CLASSIC?

The registered promoter entity is STK CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUKREJA CLASSIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KUKREJA CLASSIC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KUKREJA CLASSIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUKREJA CLASSIC?

The professionals named in the filing: Architect: HITEN SETHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUKREJA CLASSIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUKREJA CLASSIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUKREJA CLASSIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.