Home / Browse projects / Mumbai Suburban, Maharashtra / KSHITIJ VILLA

Registered No litigation declared Others project

KSHITIJ VILLA

By KESARI HARIDAS MALI

RG-MH-45827 · RERA P51800011141 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 84 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 84 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 69%
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

KSHITIJ VILLA is a Others project by KESARI HARIDAS MALI in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011141 on 31 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 84 months from the original filing.

At a glance

Project

  • NameKSHITIJ VILLA
  • TypeOthers
  • Location
    • Haridas Compund
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011141
  • ReraGenie IDRG-MH-45827

Builder

  • NameKESARI HARIDAS MALI
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KSHITIJ VILLANA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 69%.

KSHITIJ VILLA: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure69%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Sanitary Fittings within the flats / premises33%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.47%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes6%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered14
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area542 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI1421.96
Proposed, not sanctioned589 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJALARAM APARTMENT SHIMPOLI ROAD BORIVALI WEST MUMBAI 400092

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectN B CHOGLE
EngineerRUPESH CHOWDHARY
PartnerRole in project
KESARI HARIDAS MALI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018301Dec 2021 → Dec 2028

Reason as filed by the promoterAs per the attachment

Litigation declared11

CaseCourtStatus
1977/2010BOMBAY HIGH COURTNO INTERIM INJUNCTION ALLOWED
2080/2014CITY CIVIL COURT DINDOSHIPENDING
943/2016CITY CIVIL COURT DINDOSHIPENDING
762/2013BOMBAY HIGH COURTPENDING
S 1045/2015BOMBAY HIGH COURTPENDING
1056/2013CITY CIVIL COURT DINDOSHIWITHDRAWN
L 495/2016BOMBAY HIGH COURTWITHDRAWN
4603/1995CITY CIVIL COURT DINDOSHIDISPOSED
670/2016BOMBAY HIGH COURTWITHDRAWN
448/2016THE DEPUTY DIRECTOR OF LAND RECORDDISPOSED
380/2012BORIVALI METROPOLITAN MAGISTRATE COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Mar 26.pdf8 Jun 2026
Form 2File: Form 2 Mar 26.pdf8 Jun 2026
Form 3File: Form 3 Mar 26.pdf8 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 3 Mar 26.pdf8 Jun 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I as on 30062024.pdf21 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I as on 30092024.pdf21 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I as on 31122204.pdf21 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on Dec 24.pdf21 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on Sep 24.pdf21 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on June 24.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on June 24.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on Dec 24.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on Sep 24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory - June 24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory - Sep 24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory - Dec 24.pdf21 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A year ending 2024.pdf21 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 23.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31_12_2023.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 24.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 23.pdf18 Feb 2025
Certificates of CA (Form 3)File: Form 3 Dec 23_compressed.pdf18 Feb 2025
Certificates of CA (Form 3)File: Form 3 Sep 23.pdf18 Feb 2025
Certificates of CA (Form 3)File: Form 3 June 23.pdf18 Feb 2025
Certificates of CA (Form 3)File: Form 3 March 24.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 24.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31_12_2023.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 23.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 23.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold inventory as on 310324.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 new .pdf18 Feb 2025
Declaration in FORM BFile: FORM B.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 2020.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 2021.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 2022.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2023.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf3 Feb 2024
CERSAI detailsFile: CERSAI.pdf3 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form2022.pdf24 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form2023.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form22018.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form22019.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form22020.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form22021.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form22022.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form22023.pdf24 Jan 2024
Certificates of CA (Form 3)File: june23.pdf12 Dec 2023
Certificates of CA (Form 3)File: Sept23.pdf12 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Kshitij Villa Form 5 2017-2018.pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Kesari Mali Form 5 (17-18).pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kshitij Villa Form 5 2018-2019.pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kesari Mali Form 5 (18-19).pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kesari Mali Form 5 (19-20).pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Kesari Mali Form 5 (20-21).pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kesari Mali Form 5 (21-22).pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Kesari Mali Form 5 (22-23).pdf16 Nov 2023
Certificates of CA (Form 3)File: KshitijVillaForm3310318.pdf7 Nov 2023
Certificates of CA (Form 3)File: KshitijVillaRERAForm331319.pdf7 Nov 2023
Certificates of CA (Form 3)File: KshitijVillaRERAForm331320.pdf7 Nov 2023
Certificates of CA (Form 3)File: KshitijVillaRERAForm331321.pdf7 Nov 2023
Certificates of CA (Form 3)File: KshitijVillaRERAForm331322.pdf7 Nov 2023
Certificates of CA (Form 3)File: KshitijVillaRERAForm331323.pdf7 Nov 2023
Declaration about Commencement CertificateFile: FINAL DECLARATION CC .pdf25 Jul 2022
Declaration in FORM BFile: FINAL form B rera-compressed.pdf25 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FINAL bank cheque.pdf25 Jul 2022
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf30 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC MAY2022.pdf30 Jun 2022
Status of ConveyanceFile: INDEX-II.pdf30 Jun 2022
OtherFile: NM WITHDRAW 762-2013.pdf30 Jun 2022
OtherFile: SCAN DDLR ORDER.pdf15 Mar 2019
OtherFile: scan PRC 659.pdf15 Mar 2019
Building plan approvalFile: plan (1).pdf31 Jul 2017
Layout approvalFile: NA.pdf31 Jul 2017
Building plan approvalFile: IOD.pdf31 Jul 2017
PAN CardFile: pan card.pdf31 Jul 2017
Copy of the legal title reportFile: BMC OPINION.pdf31 Jul 2017
Details of encumbrancesFile: download.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: NA.pdf31 Jul 2017
Building Plan Approval (IOD)File: plan (1).pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 84 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KSHITIJ VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmKSHITIJ VILLACompleted 33Lapsed / revoked 19Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: KESARI HARIDAS MALI

KESARI HARIDAS MALI has 1 registration on MahaRERA, including KSHITIJ VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KSHITIJ VILLA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KSHITIJ VILLA?

The registered promoter entity is KESARI HARIDAS MALI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KSHITIJ VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KSHITIJ VILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KSHITIJ VILLA?

The professionals named in the filing: Architect: N B CHOGLE; Engineer: RUPESH CHOWDHARY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KSHITIJ VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KSHITIJ VILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KSHITIJ VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.