ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / KRUSHNA PARADISE

Completed No litigation declared Others project

KRUSHNA PARADISE

By MEHTA BUILDERS

RG-MH-57403 · RERA P52100051688 · Last updated on MahaRERA portal: 31 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 6 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 75%
8 of 23Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

KRUSHNA PARADISE is a Others project by MEHTA BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100051688 on 27 Jun 2023. The registration is recorded completed; possession was promised by 10 Oct 2025. 15 of the 23 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameKRUSHNA PARADISE
  • TypeOthers
  • Location
    • NEAR BHIGWAN ROAD
    • JALOCHI
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • RERA no.P52100051688
  • ReraGenie IDRG-MH-57403

Builder

  • NameMEHTA BUILDERS
  • Entity typePartnership
  • GSTIN27AAEFK0568P1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerKISHOR SHANKAR MEHTA
  • Other registrations8 more →
  • Completed7 of 9
  • Declared earlier projects8 →

Key dates

this monthRegisteredJun 2023PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jun 2023
  • Promised completion10 Oct 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

65%15 of 23 units booked

Figures as on 31 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRUSHNA PARADISENA6619423

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

KRUSHNA PARADISE: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area739 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VILAS BABAN MALGUNDEJalochiPune

Approvals and building plan

Sanctioning authorityBARAMATI MUNICIPAL COUNCIL
Permissible FSI1646.05
Proposed, not sanctioned1,646 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCINEMA ROAD INDAPUR CHOWK BARAMATI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKSHAY KISHOR MEHTA
EngineerAKSHAY KISHOR MEHTA
Chartered AccountantSAMRAT ANIL GARULE
Chartered AccountantD A Taware & Associates
Chartered AccountantHITESH RAJENDRA CHHAJED
PartnerRole in project
MEHTA BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Krushna Completion.pdf31 Oct 2025
Occupational CertificateFile: krushna Occupancy.pdf27 Sep 2025
Form 5 (FY 2024-2025)File: krushna Form 5 2024-25.pdf26 Sep 2025
Form 1File: Form 1 Krushna.pdf19 Aug 2025
Form 2File: Form 2 Krushna.pdf19 Aug 2025
Form 3File: Form 3 Krushna.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Krushna.pdf19 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krushna Architects Form 1 Q4 2024-25.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krushna Q4 Architect Form 1 2024-25 (1).pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Krushna CA Form 3 Q4 2024-25.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krushna Engineers Form 2 Q4 2024-25.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Krushna sold Unsold Inventory.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024 25 Q 1.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024 25 Q 2.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024 25 Q 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024 25 Q 1.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024 25 Q 2.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024 25 Q 3.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf17 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Quality Assurance F Y 2023 24.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate .pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 page 1 to 3.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA page 4 to 7.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Q2.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Q3.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q2.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q3.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 2 Page 1.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 2 Page 2.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 3 Page 1.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 3 Page 2.pdf17 Feb 2024
CERSAI detailsFile: No CERSAI -.pdf14 Jun 2023
Proforma of Agreement for saleFile: Krushna AGREEMENT May 29,2023.pdf29 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report May 29, 2023 3-19 PM.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AKM Disclosure of Interest (1).pdf15 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: KSM Disclosure of Interest (2).pdf15 May 2023
Layout approvalFile: Layout.pdf14 May 2023
Building plan approvalFile: Saction Plan.pdf14 May 2023
PAN CardFile: PAN Card.pdf14 May 2023
Copy of the legal title reportFile: Legal Title Report Format A.pdf14 May 2023
Copy of the legal title reportFile: Search.pdf14 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concern to Finance .pdf14 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concern to Legal.pdf14 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concern to Finance .pdf14 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concern to Legal.pdf14 May 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf14 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Saction Plan.pdf14 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 May 2023
Declaration about Commencement CertificateFile: Format D .pdf14 May 2023
Declaration in FORM BFile: Form B AKM.pdf14 May 2023
Declaration in FORM BFile: Form B KSM.pdf14 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf14 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate .pdf14 May 2023
Proforma of Allotment letterFile: Allotement Letter.pdf14 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Format A.pdf14 May 2023
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter .pdf14 May 2023

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MEHTA PARADISEP52100078720JALOCHI, Pune28Jan 2025OngoingDec 2027Not due yet
MEHTA TOWERP52100046880JALOCHI, Pune-Sep 2022CompletedDec 2024Aug 2024
AMBAR RESIDENCY B BUILDINGP52100033604JALOCHI, Pune-Mar 2022CompletedDec 2024Mar 2024
AMBAR RESIDENCY A BUILDINGP52100024670JALOCHI, Pune-Feb 2020CompletedJan 2024Oct 2023
ANAYA PARADISEP52100030158SAYALI HILL, Pune-Jul 2021CompletedDec 2023May 2023
KRUPACHHATRA COMPLEXP52100013921Jalochi, Pune-Nov 2017CompletedApr 2021Apr 2021
Gokul ResidencyP52100016313Suryanagari, Pune-May 2018CompletedFeb 2021Feb 2021

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRUSHNA PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JALOCHI13,700+ in Pune

Builder: MEHTA BUILDERS

MEHTA BUILDERS has 9 registrations on MahaRERA, including KRUPACHHATRA COMPLEX and Gokul Residency. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KRUSHNA PARADISE is delayed beyond 10 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRUSHNA PARADISE?

The registered promoter entity is MEHTA BUILDERS, a partnership as per the filing. Its GSTIN 27AAEFK0568P1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRUSHNA PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRUSHNA PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRUSHNA PARADISE?

The professionals named in the filing: Architect: AKSHAY KISHOR MEHTA; Engineer: AKSHAY KISHOR MEHTA; Chartered Accountant: SAMRAT ANIL GARULE; Chartered Accountant: D A Taware & Associates; Chartered Accountant: HITESH RAJENDRA CHHAJED. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRUSHNA PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRUSHNA PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRUSHNA PARADISE to a free account