ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / KRUSHNA KUNJ

Registration lapsed No litigation declared Residential / Group Housing project

KRUSHNA KUNJ

By KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT

RG-MH-35813 · RERA P52000017765 · Last updated on MahaRERA portal: 17 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
69 of 88Construction stages doneacross 8 buildings; furthest along: Basement (if any), 0%
74 of 333Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

KRUSHNA KUNJ is a Residential / Group Housing project by KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT in Raigarh, Maharashtra, registered with MahaRERA as P52000017765 on 11 Sep 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 259 of the 333 units on this registration are recorded sold or booked, and 69 of 88 construction stages are filed complete.

At a glance

Project

  • NameKRUSHNA KUNJ
  • TypeResidential / Group Housing
  • Location
    • GHOT
    • PANVEL
    • Raigarh
    • 410210
  • Pincode410210
  • RERA no.P52000017765
  • ReraGenie IDRG-MH-35813

Builder

  • NameKRUSHNA DHAM BUILDERS & DEVELOPERS GHOT
  • Entity typePartnership
  • PartnersHARESH NATHURAM PORJI, PATHIK SANDEEP AGARWAL, HIRALAL KHODABHAI PATEL, KISHORILAL BALDEO SHARMA

Key dates

10 months past promisethis monthRegisteredSep 2018PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Sep 2018
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings8 building records
  • Documents filed153 files

Current status

78%259 of 333 units booked
100.0%Work done, per cost certificate

Figures as on 17 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 AND 2 SHOPSNA8710510115
BUILDING NO 1 AND 2 FLATSNA87000
BUILDING NO 3NA5424024
BUILDING NO 4NA5420020
BUILDING NO 5NA5424024
BUILDING NO 6NA5448048
BUILDING NO 7NA9770070
BUILDING NO 8NA5432032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 17 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

69 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING NO 1 AND 2 SHOPS73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 1 AND 2 FLATS64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 382%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 482%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 582%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 682%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 782%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 882%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30
BuildingClosed/CoveredTotal
BUILDING NO 71010
BUILDING NO 82020

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,130 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on5 Jul 2025

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI16655.0
Proposed, not sanctioned16,655 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD PANVEL
Estimated costRs 36.29 cr
Cost incurredRs 36.29 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING NO 1 AND 2 SHOPSNARs 13.00 crRs 13.00 cr
BUILDING NO 7NARs 9.04 crRs 9.04 cr
BUILDING NO 8NARs 3.91 crRs 3.91 cr
BUILDING NO 6NARs 3.89 crRs 3.89 cr
BUILDING NO 3NARs 1.97 crRs 1.97 cr
BUILDING NO 5NARs 1.94 crRs 1.94 cr
BUILDING NO 4NARs 1.64 crRs 1.64 cr
-NARs 90.86 lakhRs 90.86 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAN ARCH
EngineerYATEESH RAJARAM TARE
EngineerRAJENDRA BALKRISHNA GAVANDI
Chartered AccountantABHL & ASSOCIATES
Chartered AccountantSACHIN SUNIL JAIN
PartnerRole in project
KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jan 2024

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: FORM 5 - 2024 - 25.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM 1 - 30-06-2025.pdf14 Oct 2025
Withdrawal Update Form 1File: FORM 1 - 30-06-2025.pdf14 Oct 2025
Withdrawal Update Form 2File: FORM 2 - 30-06-2025.pdf14 Oct 2025
Withdrawal Update Form 2File: FORM 2 - 30-06-2025.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM 3 - 30-06-2025.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM 3 - 30-06-2025.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A - 2024-25.pdf10 Oct 2025
Form 1File: FORM 1 - 31-03-2025.pdf13 Sep 2025
Form 2File: FORM 2 - 31-03-2025.pdf13 Sep 2025
Form 3File: FORM 3 - 31-03-2025.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-03-2025.pdf13 Sep 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - 22-23.pdf5 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5 - 23-24.pdf5 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30-06-2024.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30-09-2024.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 31-12-2024.pdf1 Mar 2025
Certificates of CA (Form 3)File: FORM 3 - 30-06-2024.pdf1 Mar 2025
Certificates of CA (Form 3)File: FORM 3 - 30-09-2024.pdf1 Mar 2025
Certificates of CA (Form 3)File: FORM 3 - 31-12-2024.pdf1 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30-06-2024.pdf1 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30-06-2024.pdf1 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30-09-2024.pdf1 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 31-12-2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-06-2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-09-2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-12-2024.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1 - 31-03-2024.pdf14 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 - 31-03-2024.pdf14 Aug 2024
Certificates of CA (Form 3)File: FORM 3 - 07-08-2024.pdf14 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 KRUSHNA KUNJ - 30-12-2023.pdf7 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30-12-2023.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-12-2023.pdf6 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - 31-12-2023.pdf6 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - 2019 - 20.pdf31 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - 2020-21.pdf31 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - 2021-22.pdf31 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - 2022-23.pdf31 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC - BLDG NO 6 - KRUSHNA KUNJ.pdf31 Jan 2024
Layout approvalFile: LAYOUT PLAN - 3.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 4.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 5.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 6.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 6.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 7.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 1.pdf18 Jan 2024
Layout approvalFile: LAYOUT PLAN - 2.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 1.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 2.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 3.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 4.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 5.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 6.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 6.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - 7.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30-09-2023.pdf6 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30-06-2023.pdf6 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30-09-2023.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-06-2023.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-09-2023.pdf6 Jan 2024
Certificates of CA (Form 3)File: FORM 3 - 30-06-2023.pdf6 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 - FORM 2 - 30-06-2019.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 - FORM 2 - 30-06-2019.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 - FORM 2 - 30-09-2019.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 - FORM 2 - 31-12-2019.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 - FORM 2 - 31-03-2020.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 - FORM 2 - 30-06-2020.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 - FORM 2 - 30-09-2020.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 - FORM 2 - 31-12-2020.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 - FORM 2 - 31-03-2021.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 - FORM 2 - 30-06-2021.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 - FORM 2 - 30-09-2021.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 - FORM 2 - 31-12-2021.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 - FORM 2 - 31-03-2022.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 - FORM 2 - 30-06-2022.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 - FORM 2 - 30-09-2022.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15 - FORM 2 - 31-12-2022.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 - FORM 2 - 31-03-2023.pdf4 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30-06-2019.pdf22 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30-06-2020.pdf22 Jul 2023

How this compares with Raigarh

78%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRUSHNA KUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT

KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT has 1 registration on MahaRERA, including KRUSHNA KUNJ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that KRUSHNA KUNJ shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KRUSHNA KUNJ is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRUSHNA KUNJ?

The registered promoter entity is KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRUSHNA KUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRUSHNA KUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRUSHNA KUNJ?

The professionals named in the filing: Architect: AN ARCH; Engineer: YATEESH RAJARAM TARE; Engineer: RAJENDRA BALKRISHNA GAVANDI; Chartered Accountant: ABHL & ASSOCIATES; Chartered Accountant: SACHIN SUNIL JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRUSHNA KUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRUSHNA KUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRUSHNA KUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.