Krishnasundar complex
By SHRI DATTAPRABHU CONSTRUCTION
RG-MH-74415 · RERA P52100050047 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Krishnasundar complex is a Others project by SHRI DATTAPRABHU CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100050047 on 6 Mar 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 24 months from the original filing. 7 of the 45 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameKrishnasundar complex
- TypeOthers
- Location
- sonori road
- Near dew deop society
- Sasvad (M Cl)
- Purandhar
- Pune
- 412301
- Pincode412301
- RERA no.P52100050047
- ReraGenie IDRG-MH-74415
Builder
- NameSHRI DATTAPRABHU CONSTRUCTION
- Entity typePartnership
- PartnersDilip sopanrao yadav, Balasaheb Nivrutti Kamathe
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Mar 2023
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 27 Jun 2025)
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KRISHNASUNDAR COMPLEX | NA | 8 | 6 | 25 | 20 | 45 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.
KRISHNASUNDAR COMPLEX: 52% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Kaushik Rajendra Jagtap | Sasvad (M Cl) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KRISHNASUNDAR COMPLEX | NA | Rs 3.05 cr | Rs 1.06 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sachin S Kudale |
| Engineer | Sachin S Kudale |
| Chartered Accountant | S M BORKAR |
| Chartered Accountant | Ranjeetkaur Pothiwal |
| Chartered Accountant | Sachin K. Mishra & Co. |
| Partner | Role in project |
|---|---|
| SHRI DATTAPRABHU CONSTRUCTION | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe are applying for extension since construction work is in process.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate_Dec 25.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate_Mar 26.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Dec 25.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Mar 26.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: CA Certificate-Dec-25.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: CA Certificate-Mar 26.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 25.pdf | 13 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 13 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate-Sep-25.pdf | 13 Dec 2025 |
| Form 1File: Form 1_June 23.pdf | 4 Oct 2025 |
| Form 2File: Form 2_June 23.pdf | 4 Oct 2025 |
| Form 3File: Form 3_June 23.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_June 23.pdf | 4 Oct 2025 |
| Form 1File: Form 1_Sep 23.pdf | 4 Oct 2025 |
| Form 2File: Form 2_Sep 23.pdf | 4 Oct 2025 |
| Form 3File: Form 3_Sep 23.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_Sep 23.pdf | 4 Oct 2025 |
| Form 1File: Form 1_Dec 23.pdf | 4 Oct 2025 |
| Form 2File: Form 2_Dec 23.pdf | 4 Oct 2025 |
| Form 3File: Form 3_Dec 23.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_Dec 23.pdf | 4 Oct 2025 |
| Form 1File: Form 1_March 24.pdf | 4 Oct 2025 |
| Form 2File: Form 2_March 24.pdf | 4 Oct 2025 |
| Form 3File: Form 3_March 24.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_March 24.pdf | 4 Oct 2025 |
| Form 1File: Form 1_June 24.pdf | 4 Oct 2025 |
| Form 2File: Form 2_June 24.pdf | 4 Oct 2025 |
| Form 3File: Form 3_June 24.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_June 24.pdf | 4 Oct 2025 |
| Form 1File: Form 1_Sep 24.pdf | 4 Oct 2025 |
| Form 2File: Form 2_Sep 24.pdf | 4 Oct 2025 |
| Form 3File: Form 3_Sep 24.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_Sep 24.pdf | 4 Oct 2025 |
| Form 1File: Form 1_Dec 24.pdf | 4 Oct 2025 |
| Form 2File: Form 2_Dec 24.pdf | 4 Oct 2025 |
| Form 3File: Form 3_Dec 24.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_Dec 24.pdf | 4 Oct 2025 |
| Form 1File: Form 1_March 25.pdf | 4 Oct 2025 |
| Form 2File: Form 2_March 25.pdf | 4 Oct 2025 |
| Form 3File: Form 3_March 25.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_March 25.pdf | 4 Oct 2025 |
| Form 1File: Form 1.pdf | 4 Oct 2025 |
| Form 2File: Form 2.pdf | 4 Oct 2025 |
| Form 3File: Form 3.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 4 Oct 2025 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 4 Oct 2025 |
| Form 2A (FY 2022-2023)File: Form 2A_March 23.pdf | 3 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 2A_March 24.pdf | 3 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A_March 25.pdf | 3 Oct 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality assurance 2023-24.pdf | 16 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Apr 24, 2024 11-01 AM (1).pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter (DEC 2023).pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer letter.pdf | 20 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 2022-23.pdf | 20 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 22 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: DOC016.pdf | 14 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: no encumbrances to finance.pdf | 3 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: legal.pdf | 3 Jan 2023 |
| Details of encumbrances concerned to LegalFile: no encumbrances to finance.pdf | 3 Jan 2023 |
| Details of encumbrances concerned to LegalFile: legal.pdf | 3 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intrest Annexture A dilip aba.pdf | 2 Jan 2023 |
| Proforma of Allotment letterFile: ALLOTEMENT LETTER.pdf | 2 Jan 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 2 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200255513278_For_Asset_Based_Search_22_12_2022_10_30_52_608.pdf | 24 Dec 2022 |
| Layout approvalFile: LAYOUT.pdf | 21 Dec 2022 |
| Copy of the legal title reportFile: SEARCH REPORT CERTIFICATE dilip aba.pdf | 21 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 21 Dec 2022 |
| Declaration in FORM BFile: FORM B DILIP ABA.pdf | 21 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account.pdf | 14 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: deviation to allotment letter.pdf | 14 Dec 2022 |
| Building plan approvalFile: blueprint 1_compressed.pdf | 10 Dec 2022 |
| Building plan approvalFile: blueprint 2_compressed.pdf | 10 Dec 2022 |
| PAN CardFile: PAN CARD DATTAPRABHU.pdf | 10 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: blueprint 1_compressed.pdf | 10 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: blueprint 2_compressed.pdf | 10 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Nagarpalica permission letter_compressed (1).pdf | 10 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Krishnasundar complex on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near dew deop society13,700+ in Pune
Priyvardhini Bildcon
Priyvardhini Bildcon LLP
Wonder County
GREEN COLLIS LLP
Kanishka Grand Plaza
Platinum Lifespace Developers
NARAYAN BAUG
HBCL INFRA
Passport
Urban Realty
Shapoorji Pallonji Treetopia Phase 1
Manjri Horse Breeders' Farm Private Limite
Builder: SHRI DATTAPRABHU CONSTRUCTION
SHRI DATTAPRABHU CONSTRUCTION has 1 registration on MahaRERA, including Krishnasundar complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Krishnasundar complex is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Krishnasundar complex?
The registered promoter entity is SHRI DATTAPRABHU CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Krishnasundar complex?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Krishnasundar complex?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Krishnasundar complex?
The professionals named in the filing: Architect: Sachin S Kudale; Engineer: Sachin S Kudale; Chartered Accountant: S M BORKAR; Chartered Accountant: Ranjeetkaur Pothiwal; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Krishnasundar complex?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback