Krishnasundar complex

By SHRI DATTAPRABHU CONSTRUCTION

RG-MH-74415 · RERA P52100050047 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 24 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 60%
38 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Krishnasundar complex is a Others project by SHRI DATTAPRABHU CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100050047 on 6 Mar 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 24 months from the original filing. 7 of the 45 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKrishnasundar complex
  • TypeOthers
  • Location
    • sonori road
    • Near dew deop society
    • Sasvad (M Cl)
    • Purandhar
    • Pune
    • 412301
  • Pincode412301
  • RERA no.P52100050047
  • ReraGenie IDRG-MH-74415

Builder

  • NameSHRI DATTAPRABHU CONSTRUCTION
  • Entity typePartnership
  • PartnersDilip sopanrao yadav, Balasaheb Nivrutti Kamathe

Key dates

this monthRegisteredMar 2023First promiseJun 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 27 Jun 2025)
  • Buildings1 building record
  • Documents filed82 files

Current status

16%7 of 45 units booked
34.9%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHNASUNDAR COMPLEXNA86252045

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

KRISHNASUNDAR COMPLEX: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered1
Open Space10

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,211 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025
LandownerVillageDistrict
Kaushik Rajendra JagtapSasvad (M Cl)Pune

Approvals and building plan

Sanctioning authoritySaswad Nagar Parishad
Permissible FSI2148.69
Proposed, not sanctioned2,149 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHINDE SADHAN SASWAD
Estimated costRs 3.05 cr
Cost incurredRs 1.06 cr
Work done34.9%
BuildingWingEstimatedIncurred
KRISHNASUNDAR COMPLEXNARs 3.05 crRs 1.06 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin S Kudale
EngineerSachin S Kudale
Chartered AccountantS M BORKAR
Chartered AccountantRanjeetkaur Pothiwal
Chartered AccountantSachin K. Mishra & Co.
PartnerRole in project
SHRI DATTAPRABHU CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04102518014Jun 2025 → Jun 2027

Reason as filed by the promoterWe are applying for extension since construction work is in process.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate_Dec 25.pdf29 May 2026
Withdrawal Update Form 1File: Architect Certificate_Mar 26.pdf29 May 2026
Withdrawal Update Form 2File: Engineer Certificate_Dec 25.pdf29 May 2026
Withdrawal Update Form 2File: Engineer Certificate_Mar 26.pdf29 May 2026
Withdrawal Update Form 3File: CA Certificate-Dec-25.pdf29 May 2026
Withdrawal Update Form 3File: CA Certificate-Mar 26.pdf29 May 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf13 Dec 2025
Withdrawal Update Form 2File: Form 2 Sep 25.pdf13 Dec 2025
Withdrawal Update Form 3File: CA Certificate-Sep-25.pdf13 Dec 2025
Form 1File: Form 1_June 23.pdf4 Oct 2025
Form 2File: Form 2_June 23.pdf4 Oct 2025
Form 3File: Form 3_June 23.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_June 23.pdf4 Oct 2025
Form 1File: Form 1_Sep 23.pdf4 Oct 2025
Form 2File: Form 2_Sep 23.pdf4 Oct 2025
Form 3File: Form 3_Sep 23.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Sep 23.pdf4 Oct 2025
Form 1File: Form 1_Dec 23.pdf4 Oct 2025
Form 2File: Form 2_Dec 23.pdf4 Oct 2025
Form 3File: Form 3_Dec 23.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Dec 23.pdf4 Oct 2025
Form 1File: Form 1_March 24.pdf4 Oct 2025
Form 2File: Form 2_March 24.pdf4 Oct 2025
Form 3File: Form 3_March 24.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_March 24.pdf4 Oct 2025
Form 1File: Form 1_June 24.pdf4 Oct 2025
Form 2File: Form 2_June 24.pdf4 Oct 2025
Form 3File: Form 3_June 24.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_June 24.pdf4 Oct 2025
Form 1File: Form 1_Sep 24.pdf4 Oct 2025
Form 2File: Form 2_Sep 24.pdf4 Oct 2025
Form 3File: Form 3_Sep 24.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Sep 24.pdf4 Oct 2025
Form 1File: Form 1_Dec 24.pdf4 Oct 2025
Form 2File: Form 2_Dec 24.pdf4 Oct 2025
Form 3File: Form 3_Dec 24.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Dec 24.pdf4 Oct 2025
Form 1File: Form 1_March 25.pdf4 Oct 2025
Form 2File: Form 2_March 25.pdf4 Oct 2025
Form 3File: Form 3_March 25.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_March 25.pdf4 Oct 2025
Form 1File: Form 1.pdf4 Oct 2025
Form 2File: Form 2.pdf4 Oct 2025
Form 3File: Form 3.pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf4 Oct 2025
Withdrawal Update Form 1File: Form 1_June 25.pdf4 Oct 2025
Withdrawal Update Form 2File: Form 2_June 25.pdf4 Oct 2025
Withdrawal Update Form 3File: Form 3_June 25.pdf4 Oct 2025
Form 2A (FY 2022-2023)File: Form 2A_March 23.pdf3 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A_March 24.pdf3 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A_March 25.pdf3 Oct 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality assurance 2023-24.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Apr 24, 2024 11-01 AM (1).pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter (DEC 2023).pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer letter.pdf20 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 2022-23.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: DOC016.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf6 Feb 2023
Details of encumbrances concerned to FinanceFile: no encumbrances to finance.pdf3 Jan 2023
Details of encumbrances concerned to FinanceFile: legal.pdf3 Jan 2023
Details of encumbrances concerned to LegalFile: no encumbrances to finance.pdf3 Jan 2023
Details of encumbrances concerned to LegalFile: legal.pdf3 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intrest Annexture A dilip aba.pdf2 Jan 2023
Proforma of Allotment letterFile: ALLOTEMENT LETTER.pdf2 Jan 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf2 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200255513278_For_Asset_Based_Search_22_12_2022_10_30_52_608.pdf24 Dec 2022
Layout approvalFile: LAYOUT.pdf21 Dec 2022
Copy of the legal title reportFile: SEARCH REPORT CERTIFICATE dilip aba.pdf21 Dec 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf21 Dec 2022
Declaration in FORM BFile: FORM B DILIP ABA.pdf21 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account.pdf14 Dec 2022
Deviation Report with respect to Allotment letterFile: deviation to allotment letter.pdf14 Dec 2022
Building plan approvalFile: blueprint 1_compressed.pdf10 Dec 2022
Building plan approvalFile: blueprint 2_compressed.pdf10 Dec 2022
PAN CardFile: PAN CARD DATTAPRABHU.pdf10 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: blueprint 1_compressed.pdf10 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: blueprint 2_compressed.pdf10 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Nagarpalica permission letter_compressed (1).pdf10 Dec 2022

How this compares with Pune

16%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Krishnasundar complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near dew deop society13,700+ in Pune

Builder: SHRI DATTAPRABHU CONSTRUCTION

SHRI DATTAPRABHU CONSTRUCTION has 1 registration on MahaRERA, including Krishnasundar complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Krishnasundar complex is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Krishnasundar complex?

The registered promoter entity is SHRI DATTAPRABHU CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Krishnasundar complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Krishnasundar complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Krishnasundar complex?

The professionals named in the filing: Architect: Sachin S Kudale; Engineer: Sachin S Kudale; Chartered Accountant: S M BORKAR; Chartered Accountant: Ranjeetkaur Pothiwal; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Krishnasundar complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Krishnasundar complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Krishnasundar complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.