Registration lapsed No litigation declared Others project

KRISHNANGAN

By MINIYAR BUILDERS AND DEVELOPERS

RG-MH-16518 · RERA P52600026145 · Last updated on MahaRERA portal: 10 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 25 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Sep 2024Possession promised25 months past this date
7 of 22Construction stages doneacross 4 buildings; furthest along: Staircases, 50%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

KRISHNANGAN is a Others project by MINIYAR BUILDERS AND DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600026145 on 21 Aug 2020. Possession was promised by 29 Sep 2024 and is now 25 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameKRISHNANGAN
  • TypeOthers
  • Location
    • NEAR NAKODA RESIDENCY
    • OLD PUNA NAKA
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413002
  • Pincode413002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600026145
  • ReraGenie IDRG-MH-16518

Builder

  • NameMINIYAR BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABAFM0246P1Z3
  • PartnersDURGAPRASAD MURLIDHAR MINIYAR, AMIT DURGAPRASAD MINIYAR, UDAY DURGAPRASAD MINIYAR

Key dates

25 months past promisethis monthRegisteredAug 2020First promiseSep 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Aug 2020
  • Promised completion29 Sep 2024
  • Revised completionRevised to 29 Sep 2024 (originally 30 Sep 2023)
  • Buildings4 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA60000
A WINGNA90000
B WINGNA60000
B WINGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 10 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 50%.

B WING55%
ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor1%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A WING17%
ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor1%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
B WINGNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
B WINGNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 10 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes50%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes25%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
B WING11
A WING11
B WING11
B WING11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,412 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
Miniyar Builders and DevelopersSolapur (M Corp.)Solapur

Approvals and building plan

Sanctioning authoritySolapur Muncipal Corporation
Permissible FSI2568.24
Proposed, not sanctioned1,968 sq m
Buildings approved2
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch409, CHADCHANKAR MARKET, CHATI GALLI, W M PETH,

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAGDISH DIDDI
ArchitectJagdish Devidas Diddi
EngineerJAGDISH DIDDI
Chartered AccountantC L BALDOTA & CO
Chartered AccountantC L Baldota & Company
Chartered AccountantM/s Jayesh R Lalwani & Co.
PartnerRole in project
MINIYAR BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600012055Sep 2023 → Sep 2024

Reason as filed by the promoterTo, The Officer, Maharashtra Real Estate Authority, BKC Mumbai Subject: Application for extension of the project. Dear Sir, We, Miniyar Buikders and developers hereby request you to please allow extension for the project. As, revised permission received on 19 April 2022 Thanks

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Oct 2024

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: engg cert-1 01042024.pdf10 May 2026
Form 2File: arch cert-3 01042024.pdf10 May 2026
Form 3File: Form 3_CA 31032024.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 01042024.pdf10 May 2026
Form 1File: engg certificate.pdf10 May 2026
Form 2File: arch certificate.pdf10 May 2026
Form 3File: Form 3_CA.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf10 May 2026
Form 3File: Form-3.pdf10 May 2026
Form 1File: ENGG CERT.pdf10 May 2026
Form 2File: ARCH_CERT.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory.pdf10 May 2026
Form 1File: ENGG CERT.pdf10 May 2026
Form 2File: ARCH_CERT.pdf10 May 2026
Form 3File: Form-3.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory.pdf10 May 2026
Form 1File: Engineers Certificate.pdf10 May 2026
Form 2File: Architects Certificate.pdf10 May 2026
Form 3File: form-3.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30062024.pdf9 May 2026
Form 3File: Q1_24_25 _FORM 3 CA MBD.pdf9 May 2026
Form 1File: ARCH CERT-4 Form-1.pdf9 May 2026
Form 2File: ENG CERT Form-2.pdf9 May 2026
OthersFile: Final Form - 4.pdf9 May 2026
Architect’s Certificate on Completion of Project (Form 4)File: final Form 4 with stamp.pdf14 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: final Form 4 with stamp.pdf14 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: final Form 4 with stamp.pdf10 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: final Form 4 with stamp.pdf10 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: final Form 4 with stamp.pdf10 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: final Form 4 with stamp.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1_24_25 _FORM 3 CA MBD.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT-4.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MBD_Q1_24-25_Form 3_CA (1).pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Solad Unsold Inventory 30062024.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert-3 01042024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cert-1 01042024.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 01042024.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA 31032024.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_CERT.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory 01-01-2024.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 DEC 2023.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Report FORM-5.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate OCT23.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A OCT23.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory 01102023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: null.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: fORM 2A 22.pdf20 Jul 2023
Proforma of Agreement for saleFile: Agreement For Sale Draft.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: DocScanner 17-Jul-2023 2-41 PM.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report Form -5.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf6 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: DRAWING AND CERTIFICATE-1-4_compressed.pdf6 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: DRAWING AND CERTIFICATE-1-4_compressed.pdf6 Jul 2022
Declaration about Commencement CertificateFile: DCC.pdf6 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: fORM 2A 22.pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD A WING.pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD B WING.pdf6 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200241592099_For_Asset_Based_Search_06_07_2022_17_26_19_207.pdf6 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 2A 21.pdf6 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 2A 21.pdf6 Jul 2022
Deviation Report with respect to Allotment letterFile: Real Estate Regulatory Authoriy-1.pdf6 Jul 2022
Deviation Report with respect to model copy of AgreementFile: Real Estate Regulatory Authoriy-2.pdf6 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CA 21APRIL2022.pdf16 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART ACCUPANCY CERTIFICATE.pdf16 Jun 2022
Layout approvalFile: layout drawings.pdf17 Aug 2020
Building plan approvalFile: SMC APPROVAL DRAWINGS 04062019.pdf17 Aug 2020
PAN CardFile: MBD PAN.pdf17 Aug 2020
Copy of the legal title reportFile: search report.pdf17 Aug 2020
Details of encumbrancesFile: encrumbance letter.pdf17 Aug 2020
Copy of Layout Approval (in case of layout)File: layout drawings.pdf17 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: SMC APPROVAL DRAWINGS 04062019.pdf17 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: SMC Permission 04062019.pdf17 Aug 2020
Declaration in FORM BFile: Form B MBD.pdf17 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf17 Aug 2020

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 12 months
39%of Solapur registrations have lapsed or been cancelledthis one is among them

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep KRISHNANGAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OLD PUNA NAKA550+ in Solapur

2 kmKRISHNANGANCompleted 32Lapsed / revoked 13Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: MINIYAR BUILDERS AND DEVELOPERS

MINIYAR BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including KRISHNANGAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What does it mean that KRISHNANGAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KRISHNANGAN is delayed beyond 29 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNANGAN?

The registered promoter entity is MINIYAR BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABAFM0246P1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNANGAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNANGAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNANGAN?

The professionals named in the filing: Architect: JAGDISH DIDDI; Architect: Jagdish Devidas Diddi; Engineer: JAGDISH DIDDI; Chartered Accountant: C L BALDOTA & CO; Chartered Accountant: C L Baldota & Company; Chartered Accountant: M/s Jayesh R Lalwani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNANGAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNANGAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNANGAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.