Krishnakunj Vihar Phase-1

By Pooja Shridhar Kangralkar

RG-MH-73812 · RERA P52700019447 · Last updated on MahaRERA portal: 2 Aug 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jul 2021Possession promisedregistration recorded completed
38 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Krishnakunj Vihar Phase-1 is a Residential / Group Housing project by Pooja Shridhar Kangralkar in Satara, Maharashtra, registered with MahaRERA as P52700019447 on 30 Jan 2019. The registration is recorded completed; possession was promised by 26 Jul 2021.

At a glance

Project

  • NameKrishnakunj Vihar Phase-1
  • TypeResidential / Group Housing
  • Location
    • Tamjainagar road
    • Karanje Tarf Satara
    • Karanje Tarf Satara (CT)
    • Satara
    • 415001
  • Pincode415001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700019447
  • ReraGenie IDRG-MH-73812

Builder

  • NamePooja Shridhar Kangralkar
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2019PromisedJul 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Jan 2019
  • Promised completion26 Jul 2021
  • Revised completionNone
  • Buildings4 building records
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Krishna - 3NA60000
Krishna - 4NA60000
Krishna - 5NA50000
Krishna - 6NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 2 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

38 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Krishna - 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Krishna - 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Krishna - 591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Krishna - 673%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
Krishna - 311
Krishna - 411
Krishna - 611

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,476 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI20025.6
Proposed, not sanctioned20,026 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSatara

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhalachandraa A Birje
EngineerHanmant B Jadhav
Chartered AccountantAnkur Vakhariya
PartnerRole in project
Pooja Shridhar Kangralkar-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700009927Jul 2021 → Jul 2022

Reason as filed by the promoterDelay for Covid Situation

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Aug 2023

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: form 4-1.pdf2 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K5 K6 Nagarpalika Complition Certificate.pdf2 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: form 4-1.pdf2 Aug 2023
Status of ConveyanceFile: society registration certificate k3 k4.pdf18 Jan 2023
Status of ConveyanceFile: society registration certificate k5 k6.pdf18 Jan 2023
OtherFile: Krishna Kunj K3,K4, K5,K6 Complition Certificate.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE_1_ARCHITECT_CERTIFICATE_30-09-2022_compressed.pdf21 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KKV_ENGINEERS_CERTIFICATE_PHASE_2_30-09-2022_compressed.pdf21 Oct 2022
Certificates of CA (Form 3)File: KKV_CA_SERTIFICARE_PHASE_2_30-09-2022_compressed.pdf21 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE_1_ARCHITECT_CERTIFICATE_300622_compressed.pdf22 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_phase_1_compressed.pdf22 Jul 2022
Certificates of CA (Form 3)File: CA_Certificate_Phase_1_compressed.pdf22 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 P-1-compressed.pdf4 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 1.pdf4 May 2022
Certificates of CA (Form 3)File: form3 ph1-compressed_compressed.pdf4 May 2022
OtherFile: Application for correction089.pdf13 Mar 2022
OtherFile: Consents with sign.pdf13 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society certificate.pdf19 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Architect's certificate)23-09-2021_compressed (1).pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form_5_FY_2017-18__Signed-compressed.pdf5 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form_5_FY_2020-21__Signed-compressed.pdf5 Oct 2021
Details of Restarting of Construction work post lockdownFile: Details of Restarting of Construction work post lockdown.pdf5 Oct 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory.pdf1 Oct 2021
Certificates of CA (Form 3)File: Form 3 (2020-21).pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)-compressed.pdf1 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of formation of Co-op Hsc.pdf1 Oct 2021
Status of ConveyanceFile: Status of Conveyance.pdf30 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition_Certificate.pdf4 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Plan_.pdf4 Sep 2021
Building plan approvalFile: imgw-814062228.pdf16 Aug 2021
Building plan approvalFile: imgw-814062401.pdf16 Aug 2021
Building plan approvalFile: imgw-814063432.pdf16 Aug 2021
Building Plan Approval (IOD)File: imgw-814062228.pdf16 Aug 2021
Building Plan Approval (IOD)File: imgw-814062401.pdf16 Aug 2021
Building Plan Approval (IOD)File: imgw-814063432.pdf16 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: REVISED ORDER.pdf16 Aug 2021
OtherFile: Photo.pdf30 Jul 2021
Disclosure of sold/ booked inventoryFile: KA CONSENT.pdf26 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect_certificate_3___4_building.pdf20 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: KRISHNA 4 AGREEMENT.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: KRISHNA 5 AGREEMENT.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: KRISHNA 6 AGREEMENT.pdf20 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form_5_FY_2018-19.pdf20 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form_5_FY_2019-20.pdf20 Jul 2021
OtherFile: rera_paid_challan.pdf16 Jun 2021
OtherFile: Scan k Assa.pdf18 May 2020
Building plan approvalFile: 1.pdf21 Mar 2020
Building plan approvalFile: 2.pdf21 Mar 2020
Building plan approvalFile: 3.pdf21 Mar 2020
Building plan approvalFile: 4.pdf21 Mar 2020
Building plan approvalFile: 5.pdf21 Mar 2020
Building plan approvalFile: 7.pdf21 Mar 2020
Building plan approvalFile: 8.pdf21 Mar 2020
Building plan approvalFile: 9.pdf21 Mar 2020
Building plan approvalFile: 10.pdf21 Mar 2020
Building plan approvalFile: 6.pdf21 Mar 2020
Building Plan Approval (IOD)File: 1.pdf21 Mar 2020
Building Plan Approval (IOD)File: 2.pdf21 Mar 2020
Building Plan Approval (IOD)File: 3.pdf21 Mar 2020
Building Plan Approval (IOD)File: 4.pdf21 Mar 2020
Building Plan Approval (IOD)File: 5.pdf21 Mar 2020
Building Plan Approval (IOD)File: 7.pdf21 Mar 2020
Building Plan Approval (IOD)File: 8.pdf21 Mar 2020
Building Plan Approval (IOD)File: 9.pdf21 Mar 2020
Building Plan Approval (IOD)File: 10.pdf21 Mar 2020
Building Plan Approval (IOD)File: 6.pdf21 Mar 2020
OtherFile: 1.pdf18 Mar 2020
Layout approvalFile: 1.pdf25 Jan 2019
Building plan approvalFile: 2.pdf25 Jan 2019
Building plan approvalFile: 3.pdf25 Jan 2019
Building plan approvalFile: 4.pdf25 Jan 2019
Building plan approvalFile: 5.pdf25 Jan 2019
Building plan approvalFile: 6.pdf25 Jan 2019
Building plan approvalFile: 7.pdf25 Jan 2019
Building plan approvalFile: 8.pdf25 Jan 2019
Building plan approvalFile: 9.pdf25 Jan 2019

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Ayodhya Nagaris no 298 Hissa no 3 Plot No. 1 & 2128CompletedJul 2013Jun 2013
Ayodhya NagariS no 298 Hissa no 3 Plot No 1 & 2 Satara128CompletedJul 2013Jun 2013
Ayodhya NagariS no 298 Hissa no 3 Plot No. 1 & 2128CompletedJul 2013Jun 2013

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Krishnakunj Vihar Phase-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karanje Tarf Satara1,100+ in Satara

Builder: Pooja Shridhar Kangralkar

Pooja Shridhar Kangralkar has 3 registrations on MahaRERA, including Krishnakunj Vihar Phase-1 and Krishnakunj Vihar Phase-2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Krishnakunj Vihar Phase-1 is delayed beyond 26 Jul 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Krishnakunj Vihar Phase-1?

The registered promoter entity is Pooja Shridhar Kangralkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Krishnakunj Vihar Phase-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Krishnakunj Vihar Phase-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Krishnakunj Vihar Phase-1?

The professionals named in the filing: Architect: Bhalachandraa A Birje; Engineer: Hanmant B Jadhav; Chartered Accountant: Ankur Vakhariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Krishnakunj Vihar Phase-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Krishnakunj Vihar Phase-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Krishnakunj Vihar Phase-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.