Registered No litigation declared Residential / Group Housing project

KRISHNA RESIDENCY

By RANDER CORPORATION LIMITED

RG-MH-38638 · RERA P99000050043 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
17 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 70%
52 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

KRISHNA RESIDENCY is a Residential / Group Housing project by RANDER CORPORATION LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000050043 on 6 Mar 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 37 of the 89 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.

At a glance

Project

  • NameKRISHNA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • BOISAR EAST
    • KHAIRA
    • khairepada
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000050043
  • ReraGenie IDRG-MH-38638

Builder

  • NameRANDER CORPORATION LIMITED
  • Entity typeCompany
  • DirectorsAMARCHAND RATANLAL RANDER, DINESHKUMAR RATANLAL RANDER, SARWANKUMAR RATANLAL BALDWA, JITESH RAMLAL RANDER, AMITKUMAR AMARCHAND RANDER, BHAGYASHREE BHAGWAN PATIL, ROHAN DINESH RANDER

Key dates

this monthRegisteredMar 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed79 files

Current status

42%37 of 89 units booked
97.5%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1, WING- A , B ,CNA5550050
BUILDING NO 2, WING-A ,BNA4439039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 70%.

BUILDING NO 1, WING- A , B ,C79%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2, WING-A ,B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
BUILDING NO 1, WING- A , B ,C11
BUILDING NO 2, WING-A ,B11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,570 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI4869.09
Proposed, not sanctioned4,869 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchREIG MAGOS, RAMDAS SUTRALE MARG,OFF CHANDRAVARKAR ROAD,BORIVALI WEST MUMBAI-400092
Estimated costRs 9.21 cr
Cost incurredRs 8.98 cr
Work done97.45%
BuildingWingEstimatedIncurred
BUILDING NO 1, WING- A , B ,CNARs 4.70 crRs 4.47 cr
BUILDING NO 2, WING-A ,BNARs 3.67 crRs 3.67 cr
-NARs 84.65 lakhRs 84.65 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerAVP STRUCTURAL CONSULTANTS
Chartered AccountantISHWARLAL AND COMPANY
Chartered AccountantB M GATTANI & CO.
PartnerRole in project
RANDER CORPORATION LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22122518894Dec 2025 → Dec 2026

Reason as filed by the promoter1. While registering the project with MahaRERA,we had underestimated the project completion time which proved to be less for such a project. 2. Also due to Covid project got delayed which lead to lack of sales and Financial Difficulties 3. Still the project progress was on track but in between due to some issues with our labour contractor led to few months delay of works. 4. But rest assured,now the works are in full swing & will be completed with in the stipulated time lines of this extended date and OC will be obtained. 5. Also,we are uploading the PERTChart/work completion schedule of the p

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 June 2026 (1).pdf29 Jul 2026
Withdrawal Update Form 2File: FORM 2 June 2026 (1)_compressed.pdf29 Jul 2026
Withdrawal Update Form 3File: FORM 3 June 2026_.pdf29 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf27 Apr 2026
Withdrawal Update Form 2File: FORM 2_compressed.pdf27 Apr 2026
Withdrawal Update Form 3File: form 3 March 2026_compressed.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1 Dec 2025.pdf13 Feb 2026
Withdrawal Update Form 2File: FORM 2 Dec 2025.pdf13 Feb 2026
Withdrawal Update Form 3File: FORM 3 Dec 2025.pdf13 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf17 Dec 2025
Withdrawal Update Form 3File: FORM-3.pdf17 Dec 2025
Form 1File: fORM-1_compressed.pdf12 Jun 2025
Form 2File: fORM-2_compressed.pdf12 Jun 2025
Form 3File: fORM-3_compressed (1).pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed (1).pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (3).pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rander corp form 3_compressed.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: 001.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: 001.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (Rander Corporation).pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-Palghar Project-05.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (Rander Corporation).pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-Palghar Project-05.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf18 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (2).pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-Palghar Project-05 (1).pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA REPORT (2).pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera-1 page_merged.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-Palghar Project-03 (4).pdf30 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RANDHER RERA CERTIFICATE (1)_compressed.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 (1).pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-Palghar Project-03 (2).pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT REPORT_compressed.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Cert-Palghar Project-02.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY_compressed.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA REPORT_compressed.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOC035-1-9_merged_compressed.pdf22 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSURE.pdf20 Feb 2023
Proforma of Agreement for saleFile: Rander_Corporation__-_Rera_Blank_Draft (1).pdf20 Feb 2023
Copy of the legal title reportFile: RANDER TITLE_compressed.pdf17 Feb 2023
Declaration about Commencement CertificateFile: DECLARATION CC.pdf17 Feb 2023
Declaration in FORM BFile: NOTERY_compressed.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT REPORT_compressed.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVP STRUCTURAL CONSULTANTS_compressed.pdf17 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SK BALDAWA.pdf17 Feb 2023
Proforma of Allotment letterFile: RANDER ALLOTMENT_compressed.pdf17 Feb 2023
Building plan approvalFile: BUILDING PLAN 4_compressed.pdf16 Feb 2023
Layout approvalFile: LAYOUT plan.pdf16 Feb 2023
Building plan approvalFile: BUILDING PLAN 1.pdf16 Feb 2023
Building plan approvalFile: BUILDING PLAN 2.pdf16 Feb 2023
Building plan approvalFile: BUILDING PLAN 3.pdf16 Feb 2023
Copy of Layout Approval (in case of layout)File: LAYOUT plan.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 2.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 3.pdf16 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 4_compressed.pdf16 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC COPY_compressed (1).pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST-1.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST-2.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST-4.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: rera letter 5.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: rera letter 6.pdf16 Feb 2023
PAN CardFile: RCL PANCARD.pdf15 Feb 2023
Details of encumbrances concerned to FinanceFile: DECLARATION finance.pdf15 Feb 2023
Details of encumbrances concerned to FinanceFile: DECLA LEGAL.pdf15 Feb 2023
Details of encumbrances concerned to LegalFile: DECLARATION finance.pdf15 Feb 2023
Details of encumbrances concerned to LegalFile: DECLA LEGAL.pdf15 Feb 2023
CERSAI detailsFile: DECLARATION CERSAI.pdf15 Feb 2023
Deviation Report with respect to Allotment letterFile: DECLARATION DAL.pdf15 Feb 2023
Deviation Report with respect to model copy of AgreementFile: DECLARATION DSA.pdf15 Feb 2023

How this compares with Palghar

42%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAIRA3,200+ in Palghar

2 kmKRISHNA RESIDENCYCompleted 12Lapsed / revoked 13Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: RANDER CORPORATION LIMITED

RANDER CORPORATION LIMITED has 1 registration on MahaRERA, including KRISHNA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if KRISHNA RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA RESIDENCY?

The registered promoter entity is RANDER CORPORATION LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA RESIDENCY?

The professionals named in the filing: Architect: AJAY WADE; Engineer: AVP STRUCTURAL CONSULTANTS; Chartered Accountant: ISHWARLAL AND COMPANY; Chartered Accountant: B M GATTANI & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.