KRISHNA PALACE
RG-MH-11176 · RERA P51800002538 · Last updated on MahaRERA portal: 27 Feb 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRISHNA PALACE is a Residential / Group Housing project by PANTAGON BUILT in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002538 on 1 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 6 complaints are on record with the regulator.
At a glance
Project
- NameKRISHNA PALACE
- TypeResidential / Group Housing
- Location
- EKSAR ROAD
- BORIVALI WEST
- Borivali
- Mumbai Suburban
- 400091
- Pincode400091
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002538
- ReraGenie IDRG-MH-11176
Builder
- NamePANTAGON BUILT
- Entity typePartnership
- PartnerBHAVESH NAVNITLAL SHAH
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Aug 2017
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KRISHNA PALACE | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 93%.
KRISHNA PALACE: 34% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 93% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAHAANPROJECTCONSULTANTS |
| Partner | Role in project |
|---|---|
| PANTAGON BUILT | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterFurther Permissions as well as Rehab Tenant flat handover balance and Occupation Certificate Balance.
Reason as filed by the promoterThe primary reasons of delay was obtaining approvals on time for the Rehab building and Sale Building. Enormous numbers of compliance, lengthy procedures for required permissions, unfavorable market conditions due to Covid-19 pandemic to this delay which was beyond our control. Hence we are seeking an extended date of completion of the Project.
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044476 | JAGRUTI LAD | Pantagon Built | 11/05/2018 |
| CC006000000196011 | Manjula Nandagopal | Lucina Land Development Limited | 15/02/2021 |
| CC006000000196136 | MR. KRISHNARAJ M. POONJA AND MRS. RESHMA K. POONJA | M/S PENTAGON BUILT | 23/02/2021 |
| CC006000000196219 | MR. KRISHNARAJ MANJANNA POONJA AND MRS. RESHMA KRISHNARAJ POONJA | M/S PENTAGON BUILT, MR. MUKESH RATILAL MAKWANA, MR. BHAVESH NAVNITLAL SHAH | 02/03/2021 |
| CC006000000197431 | PANTAGON BUILT | KRISHNARAJ MANJANNA POONJA | 28/06/2021 |
| CC006000000195998 | Colin Desa | M/s Pantagon Built | 12/02/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Affidavit cum Declaration.PDF | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.PDF | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF | 14 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration.PDF | 1 Feb 2024 |
| Certificates of CA (Form 3)File: CA Form - 3.PDF | 1 Feb 2024 |
| Certificates of CA (Form 3)File: CA Form - 3.PDF | 1 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA From 5.PDF | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate (22-23).pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF | 31 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_compressed.pdf | 31 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.PDF | 31 Dec 2022 |
| Certificates of CA (Form 3)File: Signed CA Certificate- Pantagon built.pdf | 31 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: signed Form 5 CA 21-22.pdf | 31 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (1).PDF | 23 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Pantagon Built (1).PDF | 23 Apr 2022 |
| Certificates of CA (Form 3)File: Pantagon Built Rera CA Certificate.PDF | 23 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.PDF | 14 Sep 2021 |
| Building plan approvalFile: Layout 1.pdf | 31 Aug 2021 |
| Building plan approvalFile: Area Statement 2.pdf | 31 Aug 2021 |
| Building plan approvalFile: Typical Floor 3.pdf | 31 Aug 2021 |
| Building plan approvalFile: Refuge Floor Plan 4.pdf | 31 Aug 2021 |
| Building plan approvalFile: Section Plan 5.pdf | 31 Aug 2021 |
| Building plan approvalFile: IOA.PDF | 31 Aug 2021 |
| Building Plan Approval (IOD)File: IOA.PDF | 31 Aug 2021 |
| Building Plan Approval (IOD)File: Layout 1.pdf | 31 Aug 2021 |
| Building Plan Approval (IOD)File: Area Statement 2.pdf | 31 Aug 2021 |
| Building Plan Approval (IOD)File: Typical Floor 3.pdf | 31 Aug 2021 |
| Building Plan Approval (IOD)File: Refuge Floor Plan 4.pdf | 31 Aug 2021 |
| Building Plan Approval (IOD)File: Section Plan 5.pdf | 31 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended CC.PDF | 31 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KP Architect Certificate.PDF | 31 Aug 2021 |
| Certificates of CA (Form 3)File: Pantagon Built.PDF | 26 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: P B Engineers.PDF | 24 Oct 2020 |
| Certificates of CA (Form 3)File: CA Certificate Pantagon Built.PDF | 24 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect From PB 30092020.PDF | 3 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certifiacte Form 2.PDF | 21 Aug 2020 |
| Certificates of CA (Form 3)File: CA Certificates Form 3.PDF | 21 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 PB 31032019.PDF | 17 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate PB 31032019.PDF | 17 Apr 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE PB 31032019.PDF | 17 Apr 2019 |
| Details of encumbrancesFile: 2.PDF | 4 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: PANTAGON BUILT.PDF | 2 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC PDF.pdf | 5 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1.PDF | 5 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.PDF | 5 Dec 2018 |
| Certificates of CA (Form 3)File: CA Certificate.PDF | 5 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF | 24 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.PDF | 24 Apr 2018 |
| Certificates of CA (Form 3)File: CACertificate.PDF | 24 Apr 2018 |
| Building plan approvalFile: CC.pdf | 23 Jan 2018 |
| Building Plan Approval (IOD)File: CC.pdf | 23 Jan 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 23 Jan 2018 |
| Building plan approvalFile: Section Plan.pdf | 26 Jul 2017 |
| Building plan approvalFile: Typical Floor Plan 2.pdf | 26 Jul 2017 |
| Building plan approvalFile: Typical Floor Plan 1.pdf | 26 Jul 2017 |
| Building plan approvalFile: Plot Area Statement.pdf | 26 Jul 2017 |
| Building plan approvalFile: IOA.PDF | 26 Jul 2017 |
| Building plan approvalFile: Layout Plan.pdf | 26 Jul 2017 |
| Layout approvalFile: Layout Plan.pdf | 26 Jul 2017 |
| PAN CardFile: Pantagon Built (Pan Card).pdf | 26 Jul 2017 |
| Copy of the legal title reportFile: Legal Title Report.PDF | 26 Jul 2017 |
| Details of encumbrancesFile: Details of Encumbrances.PDF | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: IOA.PDF | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Layout Plan.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Plot Area Statement.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Typical Floor Plan 1.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Typical Floor Plan 2.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Section Plan.pdf | 26 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 26 Jul 2017 |
| Declaration in FORM BFile: Form B.PDF | 26 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF | 26 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.PDF | 26 Jul 2017 |
| Certificates of CA (Form 3)File: CERTIFICATE OF CA FORM 3.PDF | 26 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter.PDF | 26 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KRISHNA PALACE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 369 registered projects within 2 km.
Kalpataru Advay
Kalpataru Limited
BHOOMI PRATISHTHA
Bhoomi Shashwat Estate Pvt. Ltd.
SHEETAL SHASHANKA
D.G.S LAND DEVELOPERS (INDIA) PRIVATE LIMI
DEM Oak
Dem Cornerstone Private Limited
AVYUKTA VEDANT
SHIVOHAM INFRAHOMES LLP
SURYLOK
RAKESHKUMAR AMRATLAL SHAH
See every Mumbai Suburban project, with the district possession charts
Builder: PANTAGON BUILT
PANTAGON BUILT has 1 registration on MahaRERA, including KRISHNA PALACE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that KRISHNA PALACE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KRISHNA PALACE is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRISHNA PALACE?
The registered promoter entity is PANTAGON BUILT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRISHNA PALACE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KRISHNA PALACE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KRISHNA PALACE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRISHNA PALACE?
The professionals named in the filing: Architect: KAHAANPROJECTCONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHNA PALACE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.