Home / Browse projects / Nagpur, Maharashtra / KRISHNA NAGARI - 6
KRISHNA NAGARI - 6
By Jagriti Suppliers Private Limited
RG-MH-91498 · RERA P50500054264 · Last updated on MahaRERA portal: 5 Nov 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRISHNA NAGARI - 6 is a Plotted project by Jagriti Suppliers Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500054264 on 10 Jan 2024. The registration is recorded completed; possession was promised by 30 Jun 2028. 22 of the 182 units on this registration are recorded sold or booked.
At a glance
Project
- NameKRISHNA NAGARI - 6
- TypePlotted
- Location
- NA
- MOUZE - ZARI RITHI
- Zari
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500054264
- ReraGenie IDRG-MH-91498
Builder
- NameJagriti Suppliers Private Limited
- Entity typeCompany
- Managing DirectorsRajesh Navranglal Agarwal, HARDIK RAJESH AGRAWAL
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Jan 2024
- Promised completion30 Jun 2028
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed64 files
Current status
Figures as on 5 Nov 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 5 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 2.42 cr | Rs 80.87 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR MAMTA SANGHI |
| Engineer | ER SUSHIL SANGHI |
| Chartered Accountant | CA MUKUND SARDA |
| Chartered Accountant | RAVINDER SINGH SALUJA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Jagriti Suppliers Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Nov 2025
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Completion CertificateFile: kn4.pdf | 5 Nov 2025 |
| Completion CertificateFile: kn4.pdf | 5 Nov 2025 |
| Form 2A (FY 2023-2024)File: PDF.pdf | 28 Oct 2025 |
| Form 2A (FY 2024-2025)File: PDF.pdf | 28 Oct 2025 |
| Form 2A (FY 2025-2026)File: PDF.pdf | 28 Oct 2025 |
| Form 5 (FY 2023-2024)File: Krishna Nagari -6 2024 FORM 5(1).pdf | 28 Oct 2025 |
| Form 5 (FY 2024-2025)File: krishna Nagari -6 2025 2 FORM5(2).pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1_ SEP 25_ KRISHNANAGRI 6.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2_SEP 25_ KRISHNANAGRI 6.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3_ Sep 25_ KRISHNANAGRI 6.pdf | 14 Oct 2025 |
| Form 1File: FORM 1_ JUNE 25_ KRISHNANAGRI 6.pdf | 17 Jul 2025 |
| Form 2File: FORM 2_ JUNE 25_ KRISHNANAGRI 6.pdf | 17 Jul 2025 |
| Form 3File: FORM 3_ JUNE 25_ KRISHNANAGRI 6.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ KRISHNANAGRI 6.pdf | 17 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 25.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 KRISHNA NAGARI _6 DECEMBER 2024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 KRISHNA NAGARI_6 DECEMBER 2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 KRISHNA NAGARI_6 DECEMBER 2024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold-Krishna Nagari-6 SD.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 24.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ JUNE 24.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 20 Apr 2024 |
| Layout approvalFile: jspl plan PRNT.pdf | 19 Feb 2024 |
| Building plan approval or NA orderFile: jspl plan PRNT.pdf | 19 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: jspl plan PRNT.pdf | 19 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: jspl plan PRNT.pdf | 19 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: JSPL CC PRINT.pdf | 19 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement to Sale - Krishna Nagari - 6 (7).pdf | 28 Dec 2023 |
| Copy of the legal title reportFile: TITLE CERTIFICATE (1).pdf | 21 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT (1) (1).pdf | 21 Dec 2023 |
| Proforma of Allotment letterFile: Krishna_Nagari-6_Allotment_Letter-JSPL.pdf | 25 Nov 2023 |
| Layout approvalFile: 6 Building Plan Approval PRINT_rotated.pdf | 23 Nov 2023 |
| Building plan approval or NA orderFile: 6 Building Plan Approval PRINT_rotated.pdf | 23 Nov 2023 |
| PAN CardFile: 1 PAN Card.pdf | 23 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: ilovepdf_merged (1).pdf | 23 Nov 2023 |
| Details of encumbrances concerned to LegalFile: ilovepdf_merged (1).pdf | 23 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 6 Building Plan Approval PRINT_rotated.pdf | 23 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval PRINT_rotated.pdf | 23 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 7-2 Commencement Certificates NA Order for plotted development PRINT.pdf | 23 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 7-1 Commencement Certificates NA Order for plotted development.pdf | 23 Nov 2023 |
| Declaration about Commencement CertificateFile: CC Declaration (3) (1).pdf | 23 Nov 2023 |
| Declaration in FORM BFile: 9 Declaration in FORM B .pdf | 23 Nov 2023 |
| CERSAI detailsFile: 12 CERSAI details .pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 23 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organizations.pdf | 23 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20 Separate Bank Account details including no encumbrances on the Bank Account or no escro | 23 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: 21 Deviation Report with respect to Allotment letter.pdf | 23 Nov 2023 |
| Other - LegalFile: 17-1 Legal Other.pdf | 23 Nov 2023 |
| Other - LegalFile: 17-2 Legal Other.pdf | 23 Nov 2023 |
| Other - LegalFile: 17- 3 Legal Other.pdf | 23 Nov 2023 |
| Other - FinanceFile: 18 FINANCE Other.pdf | 23 Nov 2023 |
| Other - TechnicalFile: 19 Technical Other.pdf | 23 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
Keep KRISHNA NAGARI - 6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUZE - ZARI RITHI2,800+ in Nagpur
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: Jagriti Suppliers Private Limited
Jagriti Suppliers Private Limited has 2 registrations on MahaRERA, including Krishna Nagari and KRISHNA NAGARI - 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if KRISHNA NAGARI - 6 is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRISHNA NAGARI - 6?
The registered promoter entity is Jagriti Suppliers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRISHNA NAGARI - 6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KRISHNA NAGARI - 6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRISHNA NAGARI - 6?
The professionals named in the filing: Architect: AR MAMTA SANGHI; Engineer: ER SUSHIL SANGHI; Chartered Accountant: CA MUKUND SARDA; Chartered Accountant: RAVINDER SINGH SALUJA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHNA NAGARI - 6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback