ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / KRISHNA NAGARI - 4

Completed No litigation declared Plotted project

KRISHNA NAGARI - 4

By ANKIT PANKAJ DALMIA

RG-MH-55307 · RERA P50500054743 · Last updated on MahaRERA portal: 12 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedregistration recorded completed
37 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

KRISHNA NAGARI - 4 is a Plotted project by ANKIT PANKAJ DALMIA in Nagpur, Maharashtra, registered with MahaRERA as P50500054743 on 12 Feb 2024. The registration is recorded completed; possession was promised by 31 Dec 2028. 22 of the 59 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKRISHNA NAGARI - 4
  • TypePlotted
  • Location
    • NA
    • MOUZE - ZARI (RATHI)
    • Zari
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054743
  • ReraGenie IDRG-MH-55307

Builder

  • NameANKIT PANKAJ DALMIA
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredFeb 2024PromisedDec 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed64 files

Current status

37%22 of 59 units booked
48.3%Work done, per cost certificate

Figures as on 12 Feb 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area17,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2025

Approvals and building plan

Sanctioning authorityNMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAKARSHAN BUSIPLEX, 26, CENTRAL BAZAR ROAD, RAMDASPETH, NAGPUR, MAHARSHATRA 440010
Estimated costRs 90.00 lakh
Cost incurredRs 43.49 lakh
Work done48.33%
BuildingWingEstimatedIncurred
-NARs 90.00 lakhRs 43.49 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR MAMTA SANGHI
EngineerAR MAMTA SANGHI SANGHI
EngineerSANGHI CONSULTING ENGINEERS I PVT.LTD
Chartered AccountantCA MUKUND SARDA
Chartered AccountantRAVINDER SINGH SALUJA & ASSOCIATES
PartnerRole in project
ANKIT PANKAJ DALMIA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Feb 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: LEETER OF COMPLETION WITH INWARD OF PLANNING AUTHORITY_ KN 4.PDF12 Feb 2026
Completion CertificateFile: kn4.pdf5 Nov 2025
Form 5 (FY 2023-2024)File: FORM 5_ MARCH 24_ KRISHNA NAGRI 4.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ KRISHNA NAGARI 4.pdf29 Oct 2025
Form 2A (FY 2023-2024)File: PDF.pdf28 Oct 2025
Form 2A (FY 2024-2025)File: PDF.pdf28 Oct 2025
Form 2A (FY 2025-2026)File: PDF.pdf28 Oct 2025
Withdrawal Update Form 1File: FORM 1_ SEPT 25_ KRISHNANAGRI 4.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM 2_SEPT25_ KRISHNANAGRI 4.pdf15 Oct 2025
Withdrawal Update Form 3File: FORM 3_ SEPT 25_ KRISHNANAGRI 4.pdf15 Oct 2025
Form 1File: FORM 1_ JUNE 25_ KRISHNANAGRI 4.pdf17 Jul 2025
Form 2File: FORM 2_ JUNE 25_ KRISHNANAGRI 4.pdf17 Jul 2025
Form 3File: FORM 3_ JUNE 25_ KRISHNANAGRI 4.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ KRISHNANAGRI 4.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ March 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ March 25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_ March 25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 krishna Nagari 4.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 Krishna nagari_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 krishna Nagari 4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold-Krishna Nagari-4.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24.PDF20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24.PDF20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 F0RM 1_ JUNE 24.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 24_compressed.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - krishna nagari 4.PDF18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-krishna nagari 4_compressed.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3-4.pdf17 Apr 2024
Proforma of Agreement for saleFile: Agreement to Sale - Krishna Nagari - 4 (For RERA).pdf26 Feb 2024
Layout approvalFile: KN4 PLAN PRINT.pdf19 Feb 2024
Building plan approval or NA orderFile: KN4 PLAN PRINT.pdf19 Feb 2024
Copy of Layout Approval (in case of layout)File: KN4 PLAN PRINT.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: KN4 PLAN PRINT.pdf19 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: KN 4 CC PRINT.pdf19 Feb 2024
Declaration about Commencement CertificateFile: 7 DRAFTS_ON LETTERHEAD.pdf6 Feb 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE_PLOT .pdf27 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER PLOT.pdf27 Jan 2024
Deviation Report with respect to Allotment letterFile: DEV AL.pdf27 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 7 DRAFTS_ON LETTERHEAD.pdf27 Jan 2024
Other - TechnicalFile: KN4 NMRDA Rera.pdf27 Jan 2024
Details of encumbrances concerned to FinanceFile: finan.pdf23 Jan 2024
Details of encumbrances concerned to FinanceFile: ;legal.pdf23 Jan 2024
Details of encumbrances concerned to LegalFile: finan.pdf23 Jan 2024
Details of encumbrances concerned to LegalFile: ;legal.pdf23 Jan 2024
CERSAI detailsFile: cersai.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ankit.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: banlk (1).pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 3_1.pdf19 Jan 2024
Layout approvalFile: PLAN 1.pdf13 Jan 2024
Building plan approval or NA orderFile: PLAN 1.pdf13 Jan 2024
PAN CardFile: 1 PAN CARD.pdf13 Jan 2024
Copy of the legal title reportFile: 2 Copy of the legal title report_compressed.pdf13 Jan 2024
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf13 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf13 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificates NA Order for plotted development.pdf13 Jan 2024
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION-KN-4_compressed.pdf13 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organization.PDF13 Jan 2024
Other - LegalFile: 4.pdf13 Jan 2024

How this compares with Nagpur

37%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA NAGARI - 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZE - ZARI (RATHI)2,800+ in Nagpur

2 kmKRISHNA NAGARI - 4Completed 8Lapsed / revoked 5Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: ANKIT PANKAJ DALMIA

ANKIT PANKAJ DALMIA has 2 registrations on MahaRERA, including KRISHNA NAGARI - 4 and KRISHNA NAGARI - 5. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KRISHNA NAGARI - 4 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA NAGARI - 4?

The registered promoter entity is ANKIT PANKAJ DALMIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA NAGARI - 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA NAGARI - 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA NAGARI - 4?

The professionals named in the filing: Architect: AR MAMTA SANGHI; Engineer: AR MAMTA SANGHI SANGHI; Engineer: SANGHI CONSULTING ENGINEERS I PVT.LTD; Chartered Accountant: CA MUKUND SARDA; Chartered Accountant: RAVINDER SINGH SALUJA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA NAGARI - 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA NAGARI - 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA NAGARI - 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.