Home / Browse projects / Nagpur, Maharashtra / KRISHNA KUNJ

Registration lapsed No litigation declared Residential / Group Housing project

KRISHNA KUNJ

By NILESH RAMESHCHANDRA RATHI

RG-MH-43094 · RERA P50500050583 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 85%
8 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

KRISHNA KUNJ is a Residential / Group Housing project by NILESH RAMESHCHANDRA RATHI in Nagpur, Maharashtra, registered with MahaRERA as P50500050583 on 21 Apr 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 6 of the 14 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKRISHNA KUNJ
  • TypeResidential / Group Housing
  • Location
    • BHAGWAGHAR LAYOUT
    • LENDRA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • RERA no.P50500050583
  • ReraGenie IDRG-MH-43094

Builder

  • NameNILESH RAMESHCHANDRA RATHI
  • Entity typeIndividual

Key dates

4 months past promisethis monthRegisteredApr 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Apr 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

43%6 of 14 units booked
48.5%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHNA KUNJNA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

KRISHNA KUNJ: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks76%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.36%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes36%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes97%
Storm Water DrainsYes68%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes42%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes18%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area859 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Mar 2026
LandownerVillageDistrict
JAGDISH S/O MOHANLAL KOTHARINagpur (M Corp.)Nagpur
KULDEEP S/O MOHANLAL KOTHARINagpur (M Corp.)Nagpur
RITA W/O VIPIN KOTHARINagpur (M Corp.)Nagpur
JAI S/O VIPIN KOTHARINagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION
Permissible FSI2745.33
Proposed, not sanctioned2,745 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAMDASPETH NAGPUR-440010
Estimated costRs 10.79 cr
Cost incurredRs 5.23 cr
Work done48.5%
BuildingWingEstimatedIncurred
KRISHNA KUNJNARs 10.79 crRs 5.23 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLOKESH KADU
EngineerNILESH SAHU
EngineerAR SARANG AGRAWAL
Chartered AccountantANKIT TALREJA GAD AND ASSOCIATES
PartnerRole in project
NILESH RAMESHCHANDRA RATHI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 DEC-2025.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM-2 DEC-2025.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-3 DEC-2025.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM-1 JUN-2025 KRISHNA KUNJ.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM-1 SEP-2025.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM-1 DEC-2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM-2 JUN-2025 KRISHNA KUNJ.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM-2 SEP-2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM-2 DEC-2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM-3 JUN-2025 KRISHNA KUNJ.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM-3 SEP-2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM-3 DEC-2025.pdf20 Mar 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Krishna Kunj_Mar-2024.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Krishna Kunj_Jun-2024.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Krishna Kunj_Sep-2024.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Krishna Kunj_Dec-2024.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_Mar-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_June-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_Sep-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_Dec-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_MAR-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_JUNE-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_SEP-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_DEC-24.pdf21 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: KRISHNA KUNJ_RERA_Form 2A_MAR-24.pdf21 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Krishna Kunj_2023-24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Krishna Kunj_Sep-2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Krishna Kunj_Dec-2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KRISHNA KUNJ 01-07-2024 (1).pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KRISHNA KUNJ 01-04-2024.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_JUNE-23.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_SEP-23.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_DEC-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-JUNE-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-JUNE-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOMR-2_SEP-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_DEC-23.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_JUNE-23.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_SEP-23.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_DEC-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_June-23.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_Sep-23.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Kunj_Form-2-Engineers Certificate_Dec-23.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Krishna Kunj_June-23.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Krishna Kunj_Sep-23.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Krishna Kunj_Dec-23.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM -1 KRISHAN KUNJ_June-23.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Krishna Kunj_FORM-3_June-23.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Krishna Kunj_RERA 3_Registration_sEP-23.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Krishna Kunj_RERA 3_Registration_dEC-23.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM -1 KRISHAN KUNJ_June-23.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM -1 KRISHAN KUNJ_Sept-23.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM -1 KRISHAN KUNJ_Dec-23.pdf10 Jan 2024
Copy of the legal title reportFile: Copy of the legal title report.pdf17 Apr 2023
Proforma of Agreement for saleFile: ATS_ Krishna Kunj.pdf10 Apr 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT_ATS -KRIHSNA KUNJ.pdf10 Apr 2023
Declaration about Commencement CertificateFile: form d (2) Iconic Sudama (1).pdf7 Apr 2023
Declaration in FORM BFile: FINAL FORM B_Promoter_compressed.pdf7 Apr 2023
Declaration in FORM BFile: FINAL FORM B_Land Owner_compressed.pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Nilesh Rathi (1).pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Jagdish Kothari.pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Jai Kothari.pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Kuldeep Kothari.pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Rita Kothari.pdf7 Apr 2023
Layout approvalFile: E-SANCTION MAP (1).pdf6 Apr 2023
Building plan approvalFile: E-SANCTION MAP (1).pdf6 Apr 2023
PAN CardFile: Nilesh Rathi Bhiya PAN.pdf6 Apr 2023
Details of encumbrances concerned to FinanceFile: ENCUM_FInance_KRISHNA KUNJ.pdf6 Apr 2023
Details of encumbrances concerned to FinanceFile: ENCUM_Legal_kRISHNA KUNJ.pdf6 Apr 2023
Details of encumbrances concerned to LegalFile: ENCUM_FInance_KRISHNA KUNJ.pdf6 Apr 2023
Details of encumbrances concerned to LegalFile: ENCUM_Legal_kRISHNA KUNJ.pdf6 Apr 2023
Copy of Layout Approval (in case of layout)File: E-SANCTION MAP (1).pdf6 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: E-SANCTION MAP (1).pdf6 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: E PERMIT (1)v1_page-0001.pdf6 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200265601849_For_Asset_Based_Search_06_04_2023_17_54_03_899.pdf6 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf6 Apr 2023
Proforma of Allotment letterFile: Allotment Letter _Krishna kunj.pdf6 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Disclosure_Prepared.pdf6 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - ALLOTMENT LETTER _Prepared (9).pdf6 Apr 2023

How this compares with Nagpur

43%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA KUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LENDRA2,800+ in Nagpur

Builder: NILESH RAMESHCHANDRA RATHI

NILESH RAMESHCHANDRA RATHI has 1 registration on MahaRERA, including KRISHNA KUNJ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that KRISHNA KUNJ shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KRISHNA KUNJ is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA KUNJ?

The registered promoter entity is NILESH RAMESHCHANDRA RATHI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA KUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA KUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA KUNJ?

The professionals named in the filing: Architect: LOKESH KADU; Engineer: NILESH SAHU; Engineer: AR SARANG AGRAWAL; Chartered Accountant: ANKIT TALREJA GAD AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA KUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA KUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA KUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.