Home / Browse projects / Raigarh, Maharashtra / KRISHNA IMPERIAL
KRISHNA IMPERIAL
RG-MH-28775 · RERA P52000026891 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRISHNA IMPERIAL is a Residential / Group Housing project by KRISHNA ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000026891 on 3 Nov 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 102 of the 137 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameKRISHNA IMPERIAL
- TypeResidential / Group Housing
- Location
- NODE PUSHPAK
- DAPOLI
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000026891
- ReraGenie IDRG-MH-28775
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Nov 2020
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KRISHNA IMPERIAL | NA | 11 | 11 | 119 | 18 | 137 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
KRISHNA IMPERIAL: 66% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KRISHNA IMPERIAL | NA | Rs 23.70 cr | Rs 20.52 cr |
| - | NA | Rs 1.25 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESTINATION |
| Engineer | S R CONSULTANTS |
| Chartered Accountant | YOGESH NANDA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| KRISHNA ENTERPRISES | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 170/2022 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ARCHITECT 31 12 2025.pdf | 6 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER 31 12 2025.pdf | 6 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 CA IMPERIAL 31 12 2025.pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 IMPERIAL 30 09 2025.pdf | 1 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 IMPERIAL 30 09 2025.pdf | 1 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 IMPERIAL 30 09 2025 FINAL.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 KRISHNA IMPERIAL 30 06 2025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 KRISHNA IMPERIAL 30 06 2025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 KRISHNA IMPERIAL 30 06 2025 FINAL.pdf | 30 Jun 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A IMPERIAL 31 03 2023.pdf | 24 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A IMPERIAL 31 03 2024.pdf | 24 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 19 FORM 3 CA CERT 30 09 2023.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24 FORM 3 CA CERT 31 12 2024.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23 FORM 3 CA CERT 30 09 2024.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 22 FORM 3 CA CERT 30 06 2024.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 21 FORM 3 CA CERT 31 03 2024.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20 FORM 3 CA CERT 31 12 2023.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 18 FORM 3 CA CERT 30 06 2023.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 17 FORM 3 CA CERT 31 03 2023.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 27 FORM 2 IMPERIAL 30 09 2023.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 32 FORM 2 IMPERIAL 31 12 2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31 FORM 2 IMPERIAL 30 09 2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 FORM 2 IMPERIAL 30 06 2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 29 FORM 2 IMPERIAL 31 03 2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 28 FORM 2 IMPERIAL 31 12 2023.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 26 FORM 2 IMPERIAL 30 06 2023.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 FORM 2 IMPERIAL 31 03 2023.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 9 IMPERIAL SOLD UNSOLD 31 03 2023.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 10 IMPERIAL SOLD UNSOLD 30 06 2023.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 11 IMPERIAL SOLD UNSOLD 30 09 2023.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 12 IMPERIAL SOLD UNSOLD 31 12 2023.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 13 IMPERIAL SOLD UNSOLD 31 03 2024.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 14 IMPERIAL SOLD UNSOLD 30 06 2024.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 15 IMPERIAL SOLD UNSOLD 30 09 2024.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 16 IMPERIAL SOLD UNSOLD 31 12 2024.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 IMPERIAL 30 6 2023.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1 IMPERIAL 30 9 2023.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 FORM 1 IMPERIAL 31 12 2023.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 FORM 1 IMPERIAL 31 03 2024.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 FORM 1 IMPERIAL 30 6 2024.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 FORM 1 IMPERIAL 30 9 2024.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 FORM 1 IMPERIAL 31 12 2024.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 IMPERIAL 31 03 2023.pdf | 21 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf | 21 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 KRISHNA IMPERIAL.pdf | 10 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 KRISHNA IMPERIAL.pdf | 2 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22 KRISHNA IMPERIAL.pdf | 25 Feb 2023 |
| Layout approvalFile: LAYOUT_9 FLOOR_11zon (1).pdf | 3 Nov 2022 |
| Building plan approvalFile: LAYOUT_9 FLOOR_11zon (1).pdf | 3 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT_9 FLOOR_11zon (1).pdf | 3 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT_9 FLOOR_11zon (1).pdf | 3 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_FOR 9 FLOOR.pdf | 3 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KE KRISHNA IMPERIAL FORM 5.pdf | 1 Apr 2022 |
| Layout approvalFile: BUILDING PLAN AND LAYOUT PLAN.pdf | 29 Oct 2020 |
| Building plan approvalFile: BUILDING PLAN AND LAYOUT PLAN.pdf | 29 Oct 2020 |
| PAN CardFile: FIRM PAN CARD.pdf | 29 Oct 2020 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 29 Oct 2020 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 29 Oct 2020 |
| Details of encumbrancesFile: ENCUMBRANCES LETTER.pdf | 29 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: BUILDING PLAN AND LAYOUT PLAN.pdf | 29 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN AND LAYOUT PLAN.pdf | 29 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 29 Oct 2020 |
| Declaration in FORM BFile: FORM B.pdf | 29 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 29 Oct 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 29 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 29 Oct 2020 |
| Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf | 29 Oct 2020 |
| Proforma of Allotment letterFile: DRAFT SALE AGREEMENT.pdf | 29 Oct 2020 |
| OtherFile: CREDAI CERTIFICATE.pdf | 29 Oct 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KRISHNA REGENCY | PLOT NO 44 SECTOR 3 ULWE 410206 | 33 | Completed | Dec 2017 | May 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KRISHNA IMPERIAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAPOLI5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: KRISHNA ENTERPRISES
KRISHNA ENTERPRISES has 15 registrations on MahaRERA, including KRISHNA RESIDENCY and KRISHNA PALACE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that KRISHNA IMPERIAL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KRISHNA IMPERIAL is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRISHNA IMPERIAL?
The registered promoter entity is KRISHNA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRISHNA IMPERIAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KRISHNA IMPERIAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRISHNA IMPERIAL?
The professionals named in the filing: Architect: DESTINATION; Engineer: S R CONSULTANTS; Chartered Accountant: YOGESH NANDA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHNA IMPERIAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback