Konnark Meadows

By Bhausaheb Namdeo Shingade

RG-MH-41791 · RERA P52000015880 · Last updated on MahaRERA portal: 28 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 27 months from the original
49 of 88Construction stages doneacross 8 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
60 of 302Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 217 documents Report an error

Konnark Meadows is a Residential / Group Housing project by Bhausaheb Namdeo Shingade in Raigarh, Maharashtra, registered with MahaRERA as P52000015880 on 28 Mar 2018. Possession is promised by 30 Apr 2028. The completion date has moved by 27 months from the original filing. 242 of the 302 units on this registration are recorded sold or booked, and 49 of 88 construction stages are filed complete.

At a glance

Project

  • NameKonnark Meadows
  • TypeResidential / Group Housing
  • Location
    • Chindran
    • Chindharan
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000015880
  • ReraGenie IDRG-MH-41791

Builder

  • NameBhausaheb Namdeo Shingade
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2018First promiseJan 2026Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Mar 2018
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 30 Jan 2026)
  • Buildings8 building records
  • Documents filed217 files

Current status

80%242 of 302 units booked
83.9%Work done, per cost certificate

Figures as on 28 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA65321547
2NA6564064
3NA6548048
4NA5527027
5NA5536036
6NA44606
7NA6550050
8NA5424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

49 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

172%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
272%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
372%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
472%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
572%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
663%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
723%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth20%
Stilt Floor90%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
872%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,600 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Dec 2025

Approvals and building plan

Sanctioning authorityCIDCO (City and Industrial Development Corporation of Maharashtra Limited)
Permissible FSI9616.01
Proposed, not sanctioned9,616 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI Building, Plot No 39-40-41, Sector - 11, CBD Belapur, Navi Mumbai, Maharashtra - 400614
Estimated costRs 40.85 cr
Cost incurredRs 34.29 cr
Work done83.93%
BuildingWingEstimatedIncurred
-NARs 7.51 crRs 6.98 cr
7NARs 7.15 crRs 1.43 cr
1NARs 5.50 crRs 5.44 cr
2NARs 5.08 crRs 5.03 cr
3NARs 4.62 crRs 4.52 cr
8NARs 3.77 crRs 3.73 cr
4NARs 3.27 crRs 3.23 cr
5NARs 3.27 crRs 3.23 cr
6NARs 69.94 lakhRs 68.54 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Designo Architects
EngineerVinit Consultants
EngineerNITIN M PAKHARE
Chartered AccountantJadhav & Co
Chartered AccountantJagdish Bhagat and Co
Chartered AccountantPRATIK KOTHAWALE & ASSOCIATES
Chartered AccountantCBJ & ASSOCIATES
PartnerRole in project
Bhausaheb Namdeo Shingade-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24122518979Jan 2026 → Dec 2027

Reason as filed by the promoterOne building in the project, which includes the reserved EWS units, is still under construction and progressing slowly due to financial constraints. Although the OC application has been initiated, the process is presently on hold as completion of the EWS units and their readiness for allotment is mandatory for issuance of the requisite NOCs and OC. Accordingly, additional time is required to complete the balance construction work and to comply with the NOC and OC approval procedures, which involve multiple authorities and are inherently time-consuming. Upon completion of the building and EWS u

P52000015880/WarJan 2026 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed217

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 217 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM 5 FY 2025-2026 KONNARK MEADOWS.pdf28 Sep 2026
Withdrawal Update Form 1File: Konnark Buildcon - Form 1 - June 2026.pdf3 Sep 2026
Withdrawal Update Form 2File: Konnark Buildcon Form 2.pdf3 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf3 Sep 2026
Form 2A (FY 2025-2026)File: Meadows Form-2 A 2025-26.pdf6 Aug 2026
Withdrawal Update Form 1File: KONNARK MEADOWS - Q4 - FORM1.pdf24 Apr 2026
Withdrawal Update Form 2File: KONNARK MEADOWS - Q4 - FORM2.pdf24 Apr 2026
Withdrawal Update Form 3File: KONNARK MEADOWS - Q4 - FORM3.pdf24 Apr 2026
Withdrawal Update Form 1File: Konnark Buildcon Form 1 Dec 2025.pdf28 Jan 2026
Withdrawal Update Form 2File: Konnark Buildcon Form 2 Dec 2025.pdf28 Jan 2026
Withdrawal Update Form 3File: Konnark Buildcon Form 3 Dec 2025.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5-Signed Konnark Buildcon.pdf30 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A KONNARK BUILDCON.pdf29 Oct 2025
Form 1File: FORM 1 KONNARK BUILDCON SEP 2025.pdf24 Oct 2025
Form 2File: FORM 2 KONNARK BUILDCON SEP 2025.pdf24 Oct 2025
Form 3File: FORM 3 KONNARK BUILDCON SEP 2025_compressed.pdf24 Oct 2025
Disclosure of Sold and Booked InventoryFile: KONNARK BUILDCON SOLD UNSOLD INVENTORY SEP 2025.pdf24 Oct 2025
Form 1File: 10 FORM 1 JUN 2023.pdf14 Oct 2025
Form 2File: FORM 2 JUN 2023.pdf14 Oct 2025
Form 3File: form 3 2023.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory JUN 2023.pdf14 Oct 2025
Form 1File: Form 1 - June 25_compressed.pdf7 Oct 2025
Form 2File: Form 2 - June 25.pdf7 Oct 2025
Form 3File: Form 3 - June 25_compressed.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - June 25_compressed.pdf7 Oct 2025
Form 1File: Form 1 - March 25.pdf7 Oct 2025
Form 2File: Form 2 March 25.pdf7 Oct 2025
Form 3File: Form 3 - March 25.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - March 25.pdf7 Oct 2025
Form 1File: 16 FORM 1 DEC 2024 FINAL.pdf7 Oct 2025
Form 2File: FORM 2 DEC 2024.pdf7 Oct 2025
Form 3File: FORM 3.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory DEC 2024.pdf7 Oct 2025
Form 1File: 15 FORM 1 SEP 2024 FINAL.pdf7 Oct 2025
Form 2File: FORM 2 SEP 2024.pdf7 Oct 2025
Form 3File: FORM 3.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory SEP 2024.pdf7 Oct 2025
Form 1File: 14 FORM 1 JUN 2024 FINAL.pdf7 Oct 2025
Form 2File: FORM 2 JUN 2024.pdf7 Oct 2025
Form 3File: FORM3.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory JUN 2024.pdf7 Oct 2025
Form 1File: 11 FORM 1 SEP 2023.pdf7 Oct 2025
Form 2File: FORM 2 SEP 2023.pdf7 Oct 2025
Form 3File: FORM 3 Signed.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory SEP 2023.pdf7 Oct 2025
Form 1File: 12 FORM 1 DEC 2023 FINAL.pdf7 Oct 2025
Form 2File: FORM 2 DEC 2023.pdf7 Oct 2025
Form 3File: FORM 3.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory DEC 2023.pdf7 Oct 2025
Form 1File: 9 FORM 1 MARCH 2023.pdf7 Oct 2025
Form 2File: FORM 2 MARCH 2023.pdf7 Oct 2025
Form 3File: FORM 3.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold inventory March 2023.pdf7 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 25_compressed.pdf18 Jul 2025
Certificates of CA (Form 3)File: Form 3 - June 25_compressed.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 25.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - June 25_compressed.pdf18 Jul 2025
Certificates of CA (Form 3)File: FROM 3 MARCH FINAL.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2023.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN 2023.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 2023.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2023.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2024.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN 2024.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 2024.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 25.pdf5 May 2025
PAN CardFile: pan card.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: encumbrances related to legal.pdf3 May 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC updated.pdf3 May 2025
CERSAI detailsFile: CERSAI.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A OLD FORMAT.pdf3 May 2025
Details of encumbrances concerned to LegalFile: encumbrances related to legal.pdf3 May 2025
Other - TechnicalFile: Annexure A.pdf3 May 2025
Other - TechnicalFile: Annexure A.pdf3 May 2025
14 FORM 1 JUN 2024 FINAL29 Apr 2025
1 FORM 1 MARCH 202129 Apr 2025
Form 1 - March 2529 Apr 2025
16 FORM 1 DEC 2024 FINAL29 Apr 2025
15 FORM 1 SEP 2024 FINAL29 Apr 2025

How this compares with Raigarh

80%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 27 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Konnark Meadows on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chindran5,900+ in Raigarh

2 kmKonnark MeadowsCompleted 3Lapsed / revoked 10Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Bhausaheb Namdeo Shingade

Bhausaheb Namdeo Shingade has 1 registration on MahaRERA, including Konnark Meadows. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Konnark Meadows is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Konnark Meadows?

The registered promoter entity is Bhausaheb Namdeo Shingade, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Konnark Meadows?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Konnark Meadows?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Konnark Meadows?

The professionals named in the filing: Architect: M/s. Designo Architects; Engineer: Vinit Consultants; Engineer: NITIN M PAKHARE; Chartered Accountant: Jadhav & Co; Chartered Accountant: Jagdish Bhagat and Co; Chartered Accountant: PRATIK KOTHAWALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Konnark Meadows?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Konnark Meadows. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Konnark Meadows to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.