Home / Browse projects / Raigarh, Maharashtra / Konnark High Castle
Konnark High Castle
RG-MH-06372 · RERA P52000053238 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Konnark High Castle is a Residential / Group Housing project by Konnark High Castle in Raigarh, Maharashtra, registered with MahaRERA as P52000053238 on 23 Oct 2023. Possession is promised by 30 Dec 2028. 146 of the 177 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameKonnark High Castle
- TypeResidential / Group Housing
- Location
- Mumbai Goa highway
- Panvel
- Giravale
- Raigarh
- 410221
- Pincode410221
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000053238
- ReraGenie IDRG-MH-06372
Builder
- NameKonnark High Castle
- Entity typePartnership
- GSTIN27ABAFK6681N1ZQ
- PartnersNINATH BHUASAHEB SHINGADE, MOHSIN EBRAHIM DHARIWALA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Oct 2023
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Konnark High Castle | NA | 22 | 19 | 177 | 0 | 177 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
Konnark High Castle: 66% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Konnark High Castle | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Konnark High Castle | NA | Rs 57.69 cr | Rs 40.39 cr |
| - | NA | Rs 2.80 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANARCH ARCHITECT AND PLANNER |
| Engineer | NITIN M PAKHARE |
| Chartered Accountant | Pratik Kothawale & Assi |
| Chartered Accountant | JAGDISH BHAGAT & CO |
| Partner | Role in project |
|---|---|
| Konnark High Castle | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600142 | Bhakti Achrekar | Konnark High Castle | 16/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: KONNARK HIGH CASTLE - Q4 - FORM1.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: KONNARK HIGH CASTLE - Q4 - FORM1.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: KONNARK HIGH CASTLE - Q4 - FORM2.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: KONNARK HIGH CASTLE - Q4 - FORM2.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 HIGH CASTLE .pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 HIGH CASTLE .pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Konnark High Castle Form 1 Dec 2025.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Konnark High Castle Form 2 Dec 2025.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: Konnark High Castle Form 3 Dec 2025.pdf | 24 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5-Signed Konnark High Castle_compressed.pdf | 30 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A KONNARK HIGH CASTLE 25.pdf | 29 Oct 2025 |
| Form 1File: FORM 1 KONNARK HIGH CASTLE SEP 2025.pdf | 24 Oct 2025 |
| Form 2File: FORM 2 KONNARK HIGH CASTLE SEP 2025.pdf | 24 Oct 2025 |
| Form 3File: FORM 3 KONNARK HIGH CASTLE SEP 2025.pdf | 24 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: KONNARK HIGH CASTLE SOLD UNSOLD INVENTORY SEP 2025.pdf | 24 Oct 2025 |
| Form 1File: Form 1 - June 25.pdf | 10 Sep 2025 |
| Form 2File: Form 2 - June 25.pdf | 10 Sep 2025 |
| Form 3File: Form 3 - June 25_compressed.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked - June 25.pdf | 10 Sep 2025 |
| Form 1File: Form 1 - March 25.pdf | 10 Sep 2025 |
| Form 2File: Form 2 - March 25.pdf | 10 Sep 2025 |
| Form 3File: Form 3 - March 25_compressed.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked - March 25.pdf | 10 Sep 2025 |
| Form 1File: 5 Form 1 - Dec 24.pdf | 10 Sep 2025 |
| Form 2File: 5 Form 2 - Dec 24 [Signed].pdf | 10 Sep 2025 |
| Form 3File: 5 Form 3 - Dec 24 [Signed].pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked - Dec 24.pdf | 10 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 25.pdf | 19 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 25_compressed.pdf | 19 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 25.pdf | 19 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked - June 25.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 25.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 25_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 25.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked - March 25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - Mar 24 [Signed].pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - Jun 24 [Signed].pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 - Sep 24 [Signed].pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 - Dec 24.pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Dec 23 [Signed].pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 - Dec 24 [Signed].pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 - Sep 24 [Signed]_compressed.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Jun 24 [Signed]_compressed.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 - Mar 24.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 - Dec 23.pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 - Dec 23 [Signed].pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Mar 24 [Signed].pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - Jun 24 [Signed].pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - Sep 24 [Signed].pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - Dec 24 [Signed].pdf | 25 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24.pdf | 25 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2024.pdf | 25 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Konnark High Castle - Form 2 A updated.pdf | 7 Feb 2025 |
| Building plan approvalFile: 8 Building Plan Approval _ NA Order for plotted development_compressed (1).pdf | 9 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 8 Building Plan Approval _ NA Order for plotted development_compressed (1).pdf | 9 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Konnark High Castle CC.pdf | 9 Oct 2023 |
| Building plan approvalFile: Sheet 6_compressed.pdf | 31 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 6_compressed.pdf | 31 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of no legal encrumbrance.pdf | 8 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of no legal encrumbrance.pdf | 8 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of no legal encrumbrance.pdf | 1 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of no legal encrumbrance.pdf | 1 Aug 2023 |
| CERSAI detailsFile: CERSAI report.pdf | 23 Jul 2023 |
| Layout approvalFile: Sheet 1_compressed.pdf | 22 Jul 2023 |
| Layout approvalFile: Sheet 2_compressed.pdf | 22 Jul 2023 |
| Layout approvalFile: Sheet 3_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 4_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 5_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 5_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 7_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 8_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 9_compressed.pdf | 22 Jul 2023 |
| Building plan approvalFile: Sheet 10_compressed.pdf | 22 Jul 2023 |
| PAN CardFile: `HC PAN.pdf | 22 Jul 2023 |
| Copy of the legal title reportFile: ADVOCATE.pdf | 22 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of No financial Encrumbrance.pdf | 22 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of No financial Encrumbrance.pdf | 22 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Sheet 1_compressed.pdf | 22 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Sheet 2_compressed.pdf | 22 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Sheet 3_compressed.pdf | 22 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Konnark High Castle on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
Filed coordinates, straight-line distance. 38 registered projects within 2 km.
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Green Terraces, Godrej City, Panvel
CAROA PROPERTIES LLP
Nexspace, Godrej City, Panvel
CAROA PROPERTIES LLP
The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP
LA MER ONE
La Mer Homes LLP
Emperia Hill Crest
Emperia Builtcon
See every Raigarh project, with the district possession charts
Builder: Konnark High Castle
Konnark High Castle has 1 registration on MahaRERA, including Konnark High Castle. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Konnark High Castle is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Konnark High Castle?
The registered promoter entity is Konnark High Castle, a partnership as per the filing. Its GSTIN 27ABAFK6681N1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Konnark High Castle?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Konnark High Castle?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Konnark High Castle?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Konnark High Castle?
The professionals named in the filing: Architect: ANARCH ARCHITECT AND PLANNER; Engineer: NITIN M PAKHARE; Chartered Accountant: Pratik Kothawale & Assi; Chartered Accountant: JAGDISH BHAGAT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Konnark High Castle?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.