Konnark High Castle

By Konnark High Castle

RG-MH-06372 · RERA P52000053238 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
31 of 177Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

Konnark High Castle is a Residential / Group Housing project by Konnark High Castle in Raigarh, Maharashtra, registered with MahaRERA as P52000053238 on 23 Oct 2023. Possession is promised by 30 Dec 2028. 146 of the 177 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKonnark High Castle
  • TypeResidential / Group Housing
  • Location
    • Mumbai Goa highway
    • Panvel
    • Giravale
    • Raigarh
    • 410221
  • Pincode410221
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053238
  • ReraGenie IDRG-MH-06372

Builder

  • NameKonnark High Castle
  • Entity typePartnership
  • GSTIN27ABAFK6681N1ZQ
  • PartnersNINATH BHUASAHEB SHINGADE, MOHSIN EBRAHIM DHARIWALA

Key dates

this monthRegisteredOct 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Current status

82%146 of 177 units booked
66.8%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Konnark High CastleNA22191770177

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Konnark High Castle: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered26
Open Space48

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,319 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Nov 2025
LandownerVillageDistrict
Konnark High CastleNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMaharashtra State Road Developement Corporation
Permissible FSI12674.92
Proposed, not sanctioned12,675 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector-11, CBD, Belapur
Estimated costRs 60.49 cr
Cost incurredRs 40.39 cr
Work done66.76%
BuildingWingEstimatedIncurred
Konnark High CastleNARs 57.69 crRs 40.39 cr
-NARs 2.80 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANARCH ARCHITECT AND PLANNER
EngineerNITIN M PAKHARE
Chartered AccountantPratik Kothawale & Assi
Chartered AccountantJAGDISH BHAGAT & CO
PartnerRole in project
Konnark High Castle-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600142Bhakti AchrekarKonnark High Castle16/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: KONNARK HIGH CASTLE - Q4 - FORM1.pdf30 Apr 2026
Withdrawal Update Form 1File: KONNARK HIGH CASTLE - Q4 - FORM1.pdf30 Apr 2026
Withdrawal Update Form 2File: KONNARK HIGH CASTLE - Q4 - FORM2.pdf30 Apr 2026
Withdrawal Update Form 2File: KONNARK HIGH CASTLE - Q4 - FORM2.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 HIGH CASTLE .pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 HIGH CASTLE .pdf30 Apr 2026
Withdrawal Update Form 1File: Konnark High Castle Form 1 Dec 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Konnark High Castle Form 2 Dec 2025.pdf24 Jan 2026
Withdrawal Update Form 3File: Konnark High Castle Form 3 Dec 2025.pdf24 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5-Signed Konnark High Castle_compressed.pdf30 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A KONNARK HIGH CASTLE 25.pdf29 Oct 2025
Form 1File: FORM 1 KONNARK HIGH CASTLE SEP 2025.pdf24 Oct 2025
Form 2File: FORM 2 KONNARK HIGH CASTLE SEP 2025.pdf24 Oct 2025
Form 3File: FORM 3 KONNARK HIGH CASTLE SEP 2025.pdf24 Oct 2025
Disclosure of Sold and Booked InventoryFile: KONNARK HIGH CASTLE SOLD UNSOLD INVENTORY SEP 2025.pdf24 Oct 2025
Form 1File: Form 1 - June 25.pdf10 Sep 2025
Form 2File: Form 2 - June 25.pdf10 Sep 2025
Form 3File: Form 3 - June 25_compressed.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - June 25.pdf10 Sep 2025
Form 1File: Form 1 - March 25.pdf10 Sep 2025
Form 2File: Form 2 - March 25.pdf10 Sep 2025
Form 3File: Form 3 - March 25_compressed.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - March 25.pdf10 Sep 2025
Form 1File: 5 Form 1 - Dec 24.pdf10 Sep 2025
Form 2File: 5 Form 2 - Dec 24 [Signed].pdf10 Sep 2025
Form 3File: 5 Form 3 - Dec 24 [Signed].pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - Dec 24.pdf10 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 25.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 25_compressed.pdf19 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 25.pdf19 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - June 25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 25_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - March 25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - Mar 24 [Signed].pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - Jun 24 [Signed].pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 - Sep 24 [Signed].pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 - Dec 24.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Dec 23 [Signed].pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 - Dec 24 [Signed].pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 - Sep 24 [Signed]_compressed.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Jun 24 [Signed]_compressed.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 - Mar 24.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 - Dec 23.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 - Dec 23 [Signed].pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Mar 24 [Signed].pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - Jun 24 [Signed].pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - Sep 24 [Signed].pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - Dec 24 [Signed].pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24.pdf25 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2024.pdf25 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Konnark High Castle - Form 2 A updated.pdf7 Feb 2025
Building plan approvalFile: 8 Building Plan Approval _ NA Order for plotted development_compressed (1).pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 8 Building Plan Approval _ NA Order for plotted development_compressed (1).pdf9 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Konnark High Castle CC.pdf9 Oct 2023
Building plan approvalFile: Sheet 6_compressed.pdf31 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 6_compressed.pdf31 Aug 2023
Details of encumbrances concerned to FinanceFile: Declaration of no legal encrumbrance.pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: Declaration of no legal encrumbrance.pdf8 Aug 2023
Details of encumbrances concerned to FinanceFile: Declaration of no legal encrumbrance.pdf1 Aug 2023
Details of encumbrances concerned to LegalFile: Declaration of no legal encrumbrance.pdf1 Aug 2023
CERSAI detailsFile: CERSAI report.pdf23 Jul 2023
Layout approvalFile: Sheet 1_compressed.pdf22 Jul 2023
Layout approvalFile: Sheet 2_compressed.pdf22 Jul 2023
Layout approvalFile: Sheet 3_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 4_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 5_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 5_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 7_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 8_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 9_compressed.pdf22 Jul 2023
Building plan approvalFile: Sheet 10_compressed.pdf22 Jul 2023
PAN CardFile: `HC PAN.pdf22 Jul 2023
Copy of the legal title reportFile: ADVOCATE.pdf22 Jul 2023
Details of encumbrances concerned to FinanceFile: Declaration of No financial Encrumbrance.pdf22 Jul 2023
Details of encumbrances concerned to LegalFile: Declaration of No financial Encrumbrance.pdf22 Jul 2023
Copy of Layout Approval (in case of layout)File: Sheet 1_compressed.pdf22 Jul 2023
Copy of Layout Approval (in case of layout)File: Sheet 2_compressed.pdf22 Jul 2023
Copy of Layout Approval (in case of layout)File: Sheet 3_compressed.pdf22 Jul 2023

How this compares with Raigarh

82%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Konnark High Castle on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmKonnark High CastleCompleted 10Lapsed / revoked 5Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: Konnark High Castle

Konnark High Castle has 1 registration on MahaRERA, including Konnark High Castle. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Konnark High Castle is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Konnark High Castle?

The registered promoter entity is Konnark High Castle, a partnership as per the filing. Its GSTIN 27ABAFK6681N1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Konnark High Castle?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Konnark High Castle?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Konnark High Castle?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Konnark High Castle?

The professionals named in the filing: Architect: ANARCH ARCHITECT AND PLANNER; Engineer: NITIN M PAKHARE; Chartered Accountant: Pratik Kothawale & Assi; Chartered Accountant: JAGDISH BHAGAT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Konnark High Castle?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Konnark High Castle. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Konnark High Castle to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.