Home / Browse projects / Raigarh, Maharashtra / Konnark Heavens

Completed No litigation declared Residential / Group Housing project

Konnark Heavens

By Ninath Bhausaheb Shingade

RG-MH-09278 · RERA P52000003634 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
100 of 110Construction stages doneacross 10 buildings; furthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

Konnark Heavens is a Residential / Group Housing project by Ninath Bhausaheb Shingade in Raigarh, Maharashtra, registered with MahaRERA as P52000003634 on 6 Aug 2017. The registration is recorded completed; possession was promised by 15 Mar 2023. The completion date has moved by 10 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameKonnark Heavens
  • TypeResidential / Group Housing
  • Location
    • Chindran
    • Panvel
    • Chindharan
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000003634
  • ReraGenie IDRG-MH-09278

Builder

  • NameNinath Bhausaheb Shingade
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredAug 2017First promiseMay 2022Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion15 Mar 2023
  • Revised completionRevised to 15 Mar 2023 (originally 20 May 2022)
  • Buildings10 building records
  • Documents filed153 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA60000
BNA60000
CNA60000
DNA60000
ENA60000
FNA60000
GNA60000
HNA50000
INA60000
JNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

100 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
J91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed299

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots299
Open Space299
BuildingOpen SpaceTotal
A1919
B2222
C3535
D6060
E3535
F1919
G3535
H1414
I1212
J4848

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,160 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9087.18
Proposed, not sanctioned7,161 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI Building Plot No 39 40 41 Sector 11 CBD Belapur Navi Mumbai 400614

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Ninath Bhausaheb Shingade-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000028391May 2022 → Mar 2023

Reason as filed by the promoterThe Konnark Heavens project was initially scheduled for completion by 20/05/2022, and the physical construction was completed within this timeline. However, the Occupancy Certificate (OC) was delayed and was finally granted on 15/03/2023 due to procedural delays in obtaining mandatory No Objection Certificates (NOCs) and subsequent approval from the competent planning authority-factors beyond the developer’s control. It is important to note that the OC had been uploaded along with the application and was under scrutiny during this period.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000192782NinathSUHAS SHRIRAM RAJSHIRKE03/03/2020
CC006000000192792Ninath ShingadeSandip Parab03/03/2020
CC006000000192794NINATH SHINGADEYogesh Maiusare11/03/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Mar 2023

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: encumbrances related to legal.pdf3 May 2025
CERSAI detailsFile: CERSAI.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf3 May 2025
Deviation Report with respect to Allotment letterFile: No Deviation from Allotment Letter.pdf3 May 2025
Details of encumbrances concerned to LegalFile: encumbrances related to legal.pdf3 May 2025
Other - TechnicalFile: Annexure A.pdf3 May 2025
Other - TechnicalFile: Annexure A.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: 1 Sold - Unsold inventory March 2021.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 2 Sold - Unsold inventory JUN 2021.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 3 Sold - Unsold inventory SEP 2021.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 4 Sold - Unsold inventory DEC 2021.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 5 Sold - Unsold inventory March 2022.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 6 Sold - Unsold inventory JUN 2022.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 7 Sold - Unsold inventory SEP 2022.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 8 Sold - Unsold inventory DEC 2022.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 9 Sold - Unsold inventory March 2023.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 MAR 23.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf22 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 form 2 march 21.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 form 2 jun - 21.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 form 2 sep - 21.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 form 2 dec - 21.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 form 2 MAR 22.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 form 2 JUN 22.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 form 2 SEP 22.pdf9 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 form 2 DEC 22.pdf9 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 FORM 1 JUN 2021.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 FORM 1 SEP 2021.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 FORM 1 DEC 2021.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 FORM 1 MAR 2022.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 FORM 1 JUN 2022.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 FORM 1 SEP 2022.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 FORM 1 DEC 2022.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 FORM 1 MAR 2023.pdf5 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FORM 1 MAR 2021.pdf5 Apr 2025
Certificates of CA (Form 3)File: 3 FORM 3 SEP 2021.pdf5 Apr 2025
Certificates of CA (Form 3)File: 8 FORM 3 DEC 2022.pdf5 Apr 2025
Certificates of CA (Form 3)File: 7 FORM 3 SEP 2022.pdf5 Apr 2025
Certificates of CA (Form 3)File: 6 FORM 3 JUN 2022.pdf5 Apr 2025
Certificates of CA (Form 3)File: 5 FORM 3 MAR 2022.pdf5 Apr 2025
Certificates of CA (Form 3)File: 4 FORM 3 DEC 2021.pdf5 Apr 2025
Certificates of CA (Form 3)File: 4 FORM 3 DEC 2021.pdf5 Apr 2025
Certificates of CA (Form 3)File: 2 FORM 3 JUN 2021.pdf5 Apr 2025
Certificates of CA (Form 3)File: 1 FORM 3 MAR 2021.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf5 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 20-21 (Old Format).pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf5 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Heavens new.pdf1 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Konnark heaven registration Certificate.pdf1 Feb 2025
Certificates of CA (Form 3)File: Heavens Form 3 mar 23_compressed.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Heavens Form 5 22-23 (2).pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Konnark Heavens Form 5 FY 2021-22 Final.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Konnark Heavens Form 5 FY 2021-22 Final.pdf28 Sep 2023
Proforma of Agreement for saleFile: AFS Heavens.pdf28 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE 2021.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCT 2021.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 2021.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH 2022.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE 2022.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEPT 2022.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 2022.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, June 2021.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, Sep 2021.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, Dec 2021.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, March 2022.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, June 2022.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, Sep 2022.pdf30 May 2023
Certificates of CA (Form 3)File: KH Form 3, Dec 2022.pdf30 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC heavens.pdf18 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Ceritificate.pdf13 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 29-04-2021.pdf13 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 04-06-2022.pdf13 Jun 2022
OtherFile: payment schedule 24 heavens.pdf19 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 3 UPTO SEP 2020.pdf10 Aug 2021
Certificates of CA (Form 3)File: FORM 3 UPTO DEC 2020.pdf10 Aug 2021
Certificates of CA (Form 3)File: FORM 3 UPTO MARCH 2021.pdf10 Aug 2021

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 10 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Konnark Heavens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmKonnark HeavensCompleted 2Lapsed / revoked 10Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Ninath Bhausaheb Shingade

Ninath Bhausaheb Shingade has 3 registrations on MahaRERA, including Konnark Heavens and Konnark Gardens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Konnark Heavens is delayed beyond 15 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Konnark Heavens?

The registered promoter entity is Ninath Bhausaheb Shingade, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Konnark Heavens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Konnark Heavens?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Konnark Heavens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Konnark Heavens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Konnark Heavens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Konnark Heavens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.