Home / Browse projects / Raigarh, Maharashtra / Konnark Gardens
Konnark Gardens
RG-MH-12371 · RERA P52000009416 · Last updated on MahaRERA portal: 14 Sep 2023
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Konnark Gardens is a Residential / Group Housing project by Ninath Bhausaheb Shingade in Raigarh, Maharashtra, registered with MahaRERA as P52000009416 on 22 Aug 2017. The registration is recorded completed; possession was promised by 20 May 2022. 1 complaint is on record with the regulator.
At a glance
Project
- NameKonnark Gardens
- TypeResidential / Group Housing
- Location
- Chindran
- Chindharan
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000009416
- ReraGenie IDRG-MH-12371
Builder
- NameNinath Bhausaheb Shingade
- Entity typeIndividual
- Other registrations2 more →
- Completed2 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion20 May 2022
- Revised completionNone
- Buildings7 building records
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | NA | 5 | 0 | 0 | 0 | 0 |
| 2 | NA | 6 | 0 | 0 | 0 | 0 |
| 3 | NA | 6 | 0 | 0 | 0 | 0 |
| 4 | NA | 5 | 0 | 0 | 0 | 0 |
| 5 | NA | 5 | 0 | 0 | 0 | 0 |
| 6 | NA | 5 | 0 | 0 | 0 | 0 |
| 7 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 14 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
56 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
272%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
473%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
772%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anarch |
| Engineer | Vinit Consultants |
| Chartered Accountant | Jadhav & Company |
| Partner | Role in project |
|---|---|
| Ninath Bhausaheb Shingade | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000220739 | Santosh Mohan Chavan and Sushant Mohan Chavan | Konnark Developers through its Proprietor Mr. Ninath Bhausaheb Shingade | 11/04/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Sep 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Jun 2022
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation.pdf | 14 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Gardens Form 5 19-20.pdf | 6 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Konnark Gardens.pdf | 27 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf | 13 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: architect certificate.pdf | 5 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC digita sign.pdf | 29 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gardens Architect 09062021 final.pdf | 14 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gardens architect 17082021 Final.pdf | 14 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gardens architect 08102021 Final.pdf | 14 Nov 2021 |
| Proforma of Allotment letterFile: new gardens AFS 24 points.pdf | 20 Sep 2021 |
| Proforma of Allotment letterFile: Final AFS- Konnark Gardens.pdf | 16 Sep 2020 |
| OtherFile: Declaration Gardens 15-9.pdf | 16 Sep 2020 |
| Building plan approvalFile: Building plan-1_page-0001.pdf | 15 Sep 2020 |
| Building plan approvalFile: Building plan-3_pages-to-jpg-0003.pdf | 15 Sep 2020 |
| Building plan approvalFile: Building plan-5_pages-to-jpg-0005j.pdf | 15 Sep 2020 |
| Layout approvalFile: Building plan-1_page-0001.pdf | 15 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: Building plan-1_page-0001.pdf | 15 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-1_page-0001.pdf | 15 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-3_pages-to-jpg-0003.pdf | 15 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-5_pages-to-jpg-0005j.pdf | 15 Sep 2020 |
| Building plan approvalFile: Building plan-2.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-4.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-4.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-6.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-7.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-8.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-9.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-10.pdf | 14 Sep 2020 |
| Building plan approvalFile: Building plan-11.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-2.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-4.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-4.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-6.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-7.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-8.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-9.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-10.pdf | 14 Sep 2020 |
| Building Plan Approval (IOD)File: Building plan-11.pdf | 14 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Gardens CC letter (2).pdf | 14 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate- Gardens.pdf | 14 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gardens Original Engg Certificate_compressed.pdf | 14 Sep 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance certificate- gardens.pdf | 14 Sep 2020 |
| Certificates of CA (Form 3)File: FORM 3- gardens.pdf | 14 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 2018-2019.pdf | 14 Sep 2020 |
| Proforma of Allotment letterFile: Gardens Agreement 2019 New Including.pdf | 2 Dec 2019 |
| Proforma of Allotment letterFile: Agreement for sale.pdf | 2 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 1.pdf | 5 Jul 2019 |
| Certificates of CA (Form 5)File: CA Certificate Gardens.pdf | 7 Mar 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GARDENS ARTITECT CERTIFICATE.pdf | 1 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GARDENS CA FINL.pdf | 1 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Order-ilovepdf-compressed.pdf | 14 May 2018 |
| Details of encumbrancesFile: KONNARK GARDENS bldg certificate9 (2 files merged).pdf | 23 Dec 2017 |
| Details of encumbrancesFile: KONNARK GARDENS bldg certificate9 (2 files merged).pdf | 23 Dec 2017 |
| Details of encumbrancesFile: KONNARK GARDENS bldg certificate9 (2 files merged).pdf | 23 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20171223025847.pdf | 23 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20171223025847.pdf | 23 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20171223025847.pdf | 23 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20171223025847.pdf | 23 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20171223025847.pdf | 23 Dec 2017 |
| Proforma of Allotment letterFile: word-to-pdf.pdf | 23 Dec 2017 |
| OtherFile: KONNARK GARDENS bldg certificate8.pdf | 23 Dec 2017 |
| Building plan approvalFile: building plan final.pdf | 31 Jul 2017 |
| Layout approvalFile: Layout plan.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Details of emcumbrances compressed.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: building plan final.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA certificate final.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: Agreement of sale.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate-final.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: Form B.pdf | 21 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep Konnark Gardens on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chindran5,900+ in Raigarh
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Ninath Bhausaheb Shingade
Ninath Bhausaheb Shingade has 3 registrations on MahaRERA, including Konnark Heavens and Konnark Gardens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Konnark Gardens is delayed beyond 20 May 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Konnark Gardens?
The registered promoter entity is Ninath Bhausaheb Shingade, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Konnark Gardens?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Konnark Gardens?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Konnark Gardens?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Konnark Gardens?
The professionals named in the filing: Architect: Anarch; Engineer: Vinit Consultants; Chartered Accountant: Jadhav & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Konnark Gardens?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback