Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kohinoor Prime is a Residential / Group Housing project by KGI UNIVERSAL LLP in Thane, Maharashtra, registered with MahaRERA as P51700032822 on 2 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameKohinoor Prime
- TypeResidential / Group Housing
- Location
- Unit no. 198
- Section 7-B
- Sheet no 83
- Ulhasnagar
- Ulhasnagar (M Corp.)
- Thane
- 421001
- Pincode421001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700032822
- ReraGenie IDRG-MH-95743
Builder
- NameKGI UNIVERSAL LLP
- Entity typePartnership
- PartnerAmit Anil Hotchandani
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Feb 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 14 | 0 | 0 | 0 | 0 |
| Wing B | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Wing A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed82
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A | 21 | 3 | 24 |
| Wing B | 55 | 3 | 58 |
Land and ownership10
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sukhjnder Kaur Jagdeepsingh Hayer | Kalyan | Thane |
| SMT Kulmeetkaur Gulshanbirsingh Hayer | Kalyan | Thane |
| Gagandeepsingh Gulshanbirsingh Hayer | Kalyan | Thane |
| Karandeepsingh Sukhbirsingh Hayer | Kalyan | Thane |
| Ishwarsingh Sukhbirsingh Hayer | Kalyan | Thane |
| Birendrasingh Jagdeepsingh Hayer | Kalyan | Thane |
| Sahibsingh Jagdeepsingh Hayer | Kalyan | Thane |
| Sahiljeetsingh Jagdeepsingh Hayer | Kalyan | Thane |
| Harbirsingh Jogindersingh Hayer | Kalyan | Thane |
| Mrs Gurbani Rullay | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Bhushan G Rupani |
| Engineer | Vijay Surve |
| Chartered Accountant | Vikas Kamra & Co |
| Chartered Accountant | Ridhi Mahendra Shah |
| Partner | Role in project |
|---|---|
| KGI UNIVERSAL LLP | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502380 | Swati Rohit Tambadkar | KGI UNIVERSAL LLP | 13/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Jul 2024
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5.pdf | 27 Jun 2026 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31032024_compressed.pdf | 3 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 16052024_compressed.pdf | 3 Apr 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Kohinoor Prime Society Certificate.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: kohinoor prime.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate PRIME.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE ORIME.pdf | 20 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC of prime.pdf | 1 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KGI universal form 1 AR cert .pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate PRIME.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prime Certificate.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31122023_11zon.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31122023_11zon.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold 31122023_11zon.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 31122023_11zon.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: kohinoor prime FORM 5 FY 2223.pdf | 9 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architect prime_11zon.pdf | 20 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer prime_11zon.pdf | 20 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: booking inventory prime_11zon.pdf | 20 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA prime_11zon.pdf | 20 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_11zon.pdf | 14 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_11zon.pdf | 14 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory_11zon.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 22 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_11zon.pdf | 21 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY_11zon.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 310322 kohinoor prime.pdf | 25 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PRIME 31122022.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PRIME 31122022.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PRIME 31122022_11zon.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRIME 31122022_11zon.pdf | 20 Jan 2023 |
| Layout approvalFile: 3_compre-compressed.pdf | 7 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: 3_compre-compressed.pdf | 7 Jan 2023 |
| Building plan approvalFile: BPA1.pdf | 1 Jan 2023 |
| Building plan approvalFile: prime BPA.pdf | 1 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BPA1.pdf | 1 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: prime BPA.pdf | 1 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: PRIME CC revised.pdf | 21 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architect cert 30092022_11zon.pdf | 13 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer Certificate 30092022_11zon.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sold unsold 30092022_11zon.pdf | 13 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA Certificate 30092022_11zon.pdf | 13 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kohinoor Prime Form 1 30062022.pdf | 16 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: prime engineer cert 30062022.pdf | 16 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: prime sold unsold 30062022.pdf | 16 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: prime form 3 30062022.pdf | 16 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 kgi llp 31032022.pdf | 8 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 prime 31032022.pdf | 8 May 2022 |
| Disclosure of sold/ booked inventoryFile: sold unsold prime 31032022.pdf | 8 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 kgi universal llp 31032022 to upload.pdf | 8 May 2022 |
| Declaration in FORM BFile: FormB_compressed.pdf | 25 Jan 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200228764400_For_Asset_Based_Search_25_01_2022_17_48_30_069.pdf | 25 Jan 2022 |
| Proforma of Allotment letterFile: Agreement for sale.pdf | 25 Jan 2022 |
| Layout approvalFile: Layout.pdf | 15 Jan 2022 |
| Building plan approvalFile: BP22 (1).pdf | 15 Jan 2022 |
| Copy of the legal title reportFile: Legal Title_c-compressed.pdf | 15 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 15 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BP22 (1).pdf | 15 Jan 2022 |
| Declaration about Commencement CertificateFile: Details of commencement.pdf | 15 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harbirsingh Hayer Architect cert Form 1_compressed.pdf | 15 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 15 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_compressed.pdf | 15 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf | 15 Jan 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 15 Jan 2022 |
| PAN CardFile: LLP Pan card-unlocked.pdf | 13 Jan 2022 |
| Details of encumbrancesFile: LLP.pdf | 13 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 13 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kohinoor Prime on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ulhasnagar7,600+ in Thane
Filed coordinates, straight-line distance. 127 registered projects within 2 km.
Regency Antilia Phase VIII Avana
REGENCY NIRMAN LTD
SAI WORLD LEGEND PHASE II
Paradise Lifestyles Private Limited
Regency Antilia Phase IX Avana
REGENCY NIRMAN LTD
CROSSTOWN II B WING
TROIKA ESTATE PRIVATE LIMITED
Kohinoor Gardens
KGI REALTY PRIVATE LIMITED
GOLDEN CITY
KRISHNA INFRA
See every Thane project, with the district possession charts
Builder: KGI UNIVERSAL LLP
KGI UNIVERSAL LLP has 1 registration on MahaRERA, including Kohinoor Prime. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Kohinoor Prime shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Kohinoor Prime is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kohinoor Prime?
The registered promoter entity is KGI UNIVERSAL LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kohinoor Prime?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kohinoor Prime?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kohinoor Prime?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kohinoor Prime?
The professionals named in the filing: Architect: Mr Bhushan G Rupani; Engineer: Vijay Surve; Chartered Accountant: Vikas Kamra & Co; Chartered Accountant: Ridhi Mahendra Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kohinoor Prime?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback