Completed No litigation declared Residential / Group Housing project

KOHINOOR BLISSPARK

By KOHINOOR PROPERTIES

RG-MH-20511 · RERA P52100007557 · Last updated on MahaRERA portal: 28 Dec 2019

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
1Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

KOHINOOR BLISSPARK is a Residential / Group Housing project by KOHINOOR PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100007557 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. The completion date has moved by 6 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKOHINOOR BLISSPARK
  • TypeResidential / Group Housing
  • Location
    • AMBETHAN ROAD
    • CHAKAN
    • Chakan (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007557
  • ReraGenie IDRG-MH-20511

Builder

  • NameKOHINOOR PROPERTIES
  • Entity typePartnership
  • PartnersVIKAS RAMCHANDRA RASKAR, SANJAY RAMCHANDRA RASKAR, PRITI ANIL TAMBE, SUJIT RAMCHANDRA KAMTHE, KIRAN RAVINDRA DHUMAL
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseJun 2018Revised toDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionRevised to 31 Dec 2018 (originally 30 Jun 2018)
  • Buildings2 building records
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KOHINOOR BLISS PARK DNA130000
KOHINOOR BLISSPARK CNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

KOHINOOR BLISS PARK D53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
KOHINOOR BLISSPARK C53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 28 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes60%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
KOHINOOR BLISS PARK D11
KOHINOOR BLISSPARK C11

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
TUKARAM BABU GOREChakan (CT)Pune
DILIP DATTATRAY GOREChakan (CT)Pune
TARABAI DATTATRAY GOREChakan (CT)Pune
SHANTABAI MACHHINDRANATH GOREChakan (CT)Pune
SUDAM BABU GOREChakan (CT)Pune
CHANGDEV SOPANRAO SORATEChakan (CT)Pune

Approvals and building plan

Permissible FSI7232.53
Proposed, not sanctioned5,056 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHADAPSAR PUNE MH PUNE 411028

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantosh Raskar
EngineerR.K .Randhave
PartnerRole in project
KOHINOOR PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000369Jun 2018 → Mar 2019

Reason as filed by the promoterRegistration certificate validity to be expired on 30/06/2018. On site physically work for the project is duly completed upto 90% till today i.e. till 29/05/2018 as per Architect's Certificate on 29/05/2018 & we are able to complete on site actual 100% work till 30/06/2018. However we would like to inform to this Authority that, till toady we have not received Lift NOC & therefore could not possible to get the Fire NOC in time as they take it’s own time. Similarly we would like to inform to this Authority that, as per rules of Provisional Municipal Council Act, fresh Demarcation is required fo

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000085516KOHINOOR BLISS PARKSantosh Raskar01/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Dec 2019

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: CA Certificate Form 3 30 06 2019 KP.pdf28 Dec 2019
Certificates of CA (Form 3)File: CA Certificate Form 3 30 09 2019 KP.pdf28 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA from 5 KP.pdf24 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: KP Arc from 4 cer.pdf24 Dec 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: KP Soceity cer.pdf24 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KP comp cert.pdf18 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arch complition.pdf18 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KP Engineer Certificate.PDF17 Oct 2019
Certificates of CA (Form 5)File: Form 5-min.pdf28 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch 31 12 18.PDF28 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KP Arch cert 100.pdf28 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KP MAR 19.PDF28 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert.pdf26 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KP Archi cert30918.pdf26 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert 30 6 18.pdf26 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert 30 9 18.pdf26 Dec 2018
Certificates of CA (Form 3)File: KP 30 6 18 CA.pdf26 Dec 2018
Certificates of CA (Form 3)File: K P 30 9 18CA.pdf26 Dec 2018
OtherFile: Completion Letter.pdf26 Dec 2018
OtherFile: Fire NOC.pdf26 Dec 2018
Certificates of CA (Form 5)File: Form-5 KP.pdf30 Sep 2018
Details of encumbrancesFile: KP Encumbrance letter.pdf28 May 2018
Certificates of CA (Form 3)File: CA Certficat.pdf11 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GD Arch certificate.pdf31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kohinoor Architect Certificate.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certi.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate.pdf31 Mar 2018
Building plan approvalFile: HPSC4422.pdf30 Jul 2017
Building Plan Approval (IOD)File: HPSC4422.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kohinoor Properties Engineer Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: Kohinoor Properties CA Certificate.pdf30 Jul 2017
Layout approvalFile: Praposed Amal Gametion.pdf29 Jul 2017
Building plan approvalFile: HPSC4420.pdf29 Jul 2017
PAN CardFile: pan Card.pdf29 Jul 2017
Copy of the legal title reportFile: Searh and Title.pdf29 Jul 2017
Copy of the legal title reportFile: Serach andTitle.pdf29 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Praposed Amal Gametion.pdf29 Jul 2017
Building Plan Approval (IOD)File: HPSC4420.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Certificate.pdf29 Jul 2017
Declaration in FORM BFile: KP B FORM.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: Booking Letter - Kohinoor Bliss Park - 17-07-17.pdf29 Jul 2017
Proforma of Allotment letterFile: Agr - Kohinoor Bliss Park - 29-06-17.pdf29 Jul 2017
OtherFile: NA.pdf29 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KOHINOOR BLISSPARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAKAN13,700+ in Pune

2 kmKOHINOOR BLISSPARKCompleted 9Lapsed / revoked 10Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: KOHINOOR PROPERTIES

Kohinoor Properties has 5 registrations on MahaRERA, including KOHINOOR IRIS PARK and KOHINOOR BLISSPARK. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KOHINOOR BLISSPARK is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KOHINOOR BLISSPARK?

The registered promoter entity is KOHINOOR PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KOHINOOR BLISSPARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KOHINOOR BLISSPARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KOHINOOR BLISSPARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KOHINOOR BLISSPARK?

The professionals named in the filing: Architect: Santosh Raskar; Engineer: R.K .Randhave. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KOHINOOR BLISSPARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KOHINOOR BLISSPARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KOHINOOR BLISSPARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.