Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
0 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

KINJAL COMPLEX II is a Residential / Group Housing project by KINJAL ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000046746 on 5 Sep 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 142 of the 142 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameKINJAL COMPLEX II
  • TypeResidential / Group Housing
  • Location
    • S.No. 52 & 54 of Village Khaira
    • Boisar West
    • khairepada
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000046746
  • ReraGenie IDRG-MH-43558

Builder

  • NameKINJAL ENTERPRISES
  • Entity typePartnership
  • PartnersDhanji Karasanbhai Patel, Nayan Chandrakant Bhayani, Sagar Prakash Shah, Panna Dhanji Patel
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

1 months past promisethis monthRegisteredSep 2022First promiseDec 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Sep 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed109 files

Current status

100%142 of 142 units booked
100.0%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg No 8 - A to J WingNA414011824142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Bldg No 8 - A to J Wing: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered37
Open Space60

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,271 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on26 May 2025
LandownerVillageDistrict
INSTACROISSANCE LIMITEDBoisarPalghar

Approvals and building plan

Sanctioning authorityDISTRICT OFFICE PALGHAR
Permissible FSI12290.3
Proposed, not sanctioned12,290 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFirst Floor, Shanti Shopping Centre, Opp Rly Station Mira Road East
Estimated costRs 26.50 cr
Cost incurredRs 26.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
Bldg No 8 - A to J WingNARs 25.75 crRs 25.75 cr
-NARs 75.00 lakhRs 75.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAPE CONSULTANTS
EngineerSHAH & ASSOCIATES
EngineerCENTRE LINE CONSULTANTS & ENGINEERS
Chartered AccountantAJAY SHAH & CO
PartnerRole in project
KINJAL ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25032620371Dec 2025 → Sep 2026

Reason as filed by the promoter1)The Project is already completed & OC received on -11/03/2026 2)The Extension is sought only for uploading OC & filing Completion Update

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf10 Jun 2026
Withdrawal Update Form 2File: Form-2.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf10 Jun 2026
Form 5 (FY 2025-2026)File: Form 5(Fy 2025-26).pdf6 Jun 2026
Form 2A (FY 2024-2025)File: Form-2A(Fy 2024-25).pdf7 Apr 2026
Withdrawal Update Form 1File: Form-1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 Dec 2025.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 KE 2025.pdf5 Nov 2025
Withdrawal Update Form 1File: Form No1 Architect Certificate.pdf12 Oct 2025
Withdrawal Update Form 2File: Form No2 Engineer Certificate.pdf12 Oct 2025
Withdrawal Update Form 3File: Form No3 CA Certificate.pdf12 Oct 2025
Form 1File: Form 1 Architect Certificate 30-09-2022.pdf12 Jun 2025
Form 2File: Form 2 Engineer Certificate 30-09-2022.pdf12 Jun 2025
Form 3File: Form 3 CA Certificate 30-09-2022.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30-09-2022.pdf12 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Sep - 2022.pdf12 Jun 2025
Form 1File: Form 1 Architect Certificate 31-12-2022.pdf12 Jun 2025
Form 2File: Form 2 Engineer Certificate 31-12-2022.pdf12 Jun 2025
Form 3File: Form 3 CA Certificate 31-12-2022.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31-12-2022.pdf12 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Dec - 2022.pdf12 Jun 2025
Form 1File: Form 1 Architect Certificate 31-03-2023.pdf12 Jun 2025
Form 2File: Form 2 Engineer Certificate 31-03-2023.pdf12 Jun 2025
Form 3File: Form 3 CA Certificate 31-03-2023.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31-03-2023.pdf12 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Mar- 2023.pdf12 Jun 2025
Form 1File: Architect Certificate Form 1 30-06-2023.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 30-06-2023.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 30-06-2023.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30-06-2023.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration June-2023.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 30-09-2023.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 30-09-2023.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 30-09-2023.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30-09-2023.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration Sep-2023.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 31-12-2023.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 31-12-2023.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 31-12-2023.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31-12-2023.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration Dec-2023.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 31-03-2024.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 31-03-2024.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 31-03-2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31-03-2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration March-2024.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 30-06-2024.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 30-06-2024.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 30-06-2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30-06-2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration June-2024.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 30-09-2024.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 30-09-2024.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 30-09-2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30-09-2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration Sep-2024.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 31-12-2024.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 31-12-2024.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 31-12-2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31-12-2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration Dec-2024.pdf7 Jun 2025
Form 1File: Architect Certificate Form 1 31-03-2025.pdf7 Jun 2025
Form 2File: Form 2 Engineer Certificate 31-03-2025.pdf7 Jun 2025
Form 3File: CA Certificate Form 3 31-03-2025.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31-03-2025.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration March-2025.pdf7 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 - 2022-23 KE.pdf7 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 - 2023-24 KE.pdf7 Jun 2025
Withdrawal Update Form 1File: Architect Certificate Form 1.pdf5 Jun 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31-03-2025.pdf5 Jun 2025
Withdrawal Update Form 3File: CA Certificate Form 3.pdf5 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: KE CA Certificate Form 5 March-2023.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KE CA Certificate Form 3 - 30-06-2023.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KE CA Certificate Form 3 - 30-09-2023.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KE - CA Certificate Form 3.pdf6 Mar 2023
Proforma of Allotment letterFile: Agreement for Sale.pdf29 Aug 2022
Deviation Report with respect to Allotment letterFile: No Deviation - Agreement and Allotment Letter.pdf29 Aug 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement and Allotment Letter.pdf29 Aug 2022
Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf20 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KINJAL COMPLEXPalghar Palghar - 401501264CompletedSep 2016Late, Nov 2017

How this compares with Palghar

100%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 9 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KINJAL COMPLEX II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Boisar West3,200+ in Palghar

2 kmKINJAL COMPLEX IICompleted 124Lapsed / revoked 57Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 316 registered projects within 2 km.

Builder: KINJAL ENTERPRISES

KINJAL ENTERPRISES has 2 registrations on MahaRERA, including KINJAL COMPLEX and KINJAL COMPLEX II. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if KINJAL COMPLEX II is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINJAL COMPLEX II?

The registered promoter entity is KINJAL ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINJAL COMPLEX II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KINJAL COMPLEX II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINJAL COMPLEX II?

The professionals named in the filing: Architect: SHAPE CONSULTANTS; Engineer: SHAH & ASSOCIATES; Engineer: CENTRE LINE CONSULTANTS & ENGINEERS; Chartered Accountant: AJAY SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINJAL COMPLEX II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINJAL COMPLEX II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINJAL COMPLEX II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.