ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Kinara

Completed No litigation declared Residential / Group Housing project

Kinara

By Options Infra Project Pvt. Ltd.

RG-MH-28982 · RERA P51800029182 · Last updated on MahaRERA portal: 21 Mar 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 75%
1Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Kinara is a Residential / Group Housing project by Options Infra Project Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029182 on 3 May 2021. The registration is recorded completed; possession was promised by 31 Mar 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKinara
  • TypeResidential / Group Housing
  • Location
    • Gulmohar Road
    • Juhu
    • Andheri
    • Mumbai Suburban
    • 400049
  • Pincode400049
  • RERA no.P51800029182
  • ReraGenie IDRG-MH-28982

Builder

  • NameOptions Infra Project Pvt. Ltd.
  • Entity typeCompany
  • DirectorsManji Ganesha Patel, Dhanji Ganesha Patel, Pravin Girish Chamaria, Nishit Bechar Patel

Key dates

this monthRegisteredMay 2021PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 May 2021
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KinaraNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Kinara: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 21 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Common TerraceYes0%

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered79

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,008 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shree Parle Juhu (Kinara) CHSAndheriMumbai Suburban

Approvals and building plan

Permissible FSI6512.62
Proposed, not sanctioned4,997 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMG Seva Mandir Trust Buidling SV Road Bandra West Mumbai 400050

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Options Infra Project Pvt. Ltd.-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503862RAVINDRA KUMAR CHOUDHARYOptions Infra Project Pvt. Ltd.04/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Mar 2025

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCC KINARA CERTIFICATE.pdf21 Mar 2025
Other - LegalFile: JUHU KINARA SCAN_11zon.pdf26 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: JUHU KINARA SCAN_11zon.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates - Architect Certificate.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate.pdf6 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Abhijeet Ashok Londhe - Quality Certificate - 31012025.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kinaracompressed.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kinara Architech Certificate.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kinara Engineer Certificate.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kinara Quality Certificate.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates - Architect Certificate -.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Kinara_Apr-Jun, 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates - Architect Certificate -.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate -.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Abhijeet Ashok Londhe - Quality Certificate -.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Kinara_Jan-Mar__24.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates Architect Certificate upto 31122023.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe Engineers Certificate.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Abhijeet Ashok Londhe Quality Certificate.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara OctDec 2023_compressed.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates Architect Certificate upto 30 09 2023.pdf13 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe Engineers Certificate upto 30 09 2023.PDF13 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Abhijeet Ashok Londhe Quality Certificate upto 30 09 2023.PDF13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Option Infra Pvt Ltd).pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Apr Jun 23.pdf13 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates Architect Certificate upto 30-06-2023.pdf12 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate - upto 30-06-2023.pdf12 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Abhijeet Ashok Londhe - Quality Certificate - upto 30 06 2023.pdf12 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Abhijeet Ashok Londhe - Quality Certificate - upto 30 06 2023.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Apr-Jun, 23_11zon.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Apr-Jun, 23_11zon.pdf12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates Architect Certificate upto 31 03 2023 Form 1.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe Engineers Certificate upto 31 03 2023 FORM 2.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Abhijeet Ashok Londhe - Quality Certificate - upto 31-03-2023.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Project upto 31 03 2023.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Project upto 31 03 2023 compressed.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe Engineers Certificate upto 31 -12 -2022.pdf9 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Abhijeet Ashok Londhe - Quality Certificate - upto 31-12-2022.pdf9 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Oct - Dec22.pdf9 Feb 2023
Building plan approvalFile: Amended IOA 1 to 5.pdf3 Feb 2023
Building plan approvalFile: Amended IOA 7 to 12.pdf3 Feb 2023
Building plan approvalFile: Amended IOA 13 to Terrace.pdf3 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA 1 to 5.pdf3 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA 7 to 12.pdf3 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA 13 to Terrace.pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates Architect Certificate upto 30 01 2023.pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates - Architect Certificate.pdf22 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate.PDF22 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara July to Sept, 22_compressed.pdf22 Nov 2022
Details of encumbrances concerned to LegalFile: Non-encumbrance certificate1 .pdf11 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates - Architect Certificate - upto 30-6-2022.pdf11 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate - upto 30-06-2022_compressed (1).pdf11 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Apr - Jun, 22_compressed.pdf11 Aug 2022
Declaration about Commencement CertificateFile: CC Declaration Kinara.pdf24 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf24 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - compressed.pdf24 Jun 2022
CERSAI detailsFile: Cersai Declaration - Kinara.pdf24 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kinara Project compressed.pdf24 Jun 2022
Building plan approvalFile: Amended Plan 1.pdf29 Dec 2021
Building plan approvalFile: Amended Plan 2.pdf29 Dec 2021
Building plan approvalFile: Amended Plan 3.pdf29 Dec 2021
Building plan approvalFile: Amended Plan 4.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan 1.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan 2.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan 3.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan 4.pdf29 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shilp Associates - Architect Certificate compressed.pdf15 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhijeet Ashok Londhe - Engineers Certificate compressed.pdf15 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3(CA CERTIFICATE) compressed.pdf15 Sep 2021
Layout approvalFile: Layout- Kinara- upload.pdf30 Apr 2021
Details of encumbrancesFile: Upload- Details of encumbrance- Kinara.pdf30 Apr 2021
Copy of Layout Approval (in case of layout)File: Layout- Kinara- upload.pdf30 Apr 2021
Building plan approvalFile: IOA.pdf19 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf19 Apr 2021
Copy of the legal title reportFile: Title Report revised.pdf5 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf27 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final kinara.pdf27 Mar 2021
PAN CardFile: PANCARD.pdf26 Mar 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kinara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Juhu6,700+ in Mumbai Suburban

Builder: Options Infra Project Pvt. Ltd.

Options Infra Project Pvt. Ltd. has 1 registration on MahaRERA, including Kinara. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kinara is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kinara?

The registered promoter entity is Options Infra Project Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kinara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kinara?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kinara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Kinara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kinara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kinara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.