Home / Browse projects / Nagpur, Maharashtra / KESHAV

Completed No litigation declared Residential / Group Housing project

KESHAV

By Shri Parasnath Properties

RG-MH-12618 · RERA P50500045596 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 2.50 crore secured on the land, in favour of Wardhaman Urban Co-op Bank Ld
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

KESHAV is a Residential / Group Housing project by Shri Parasnath Properties in Nagpur, Maharashtra, registered with MahaRERA as P50500045596 on 26 May 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameKESHAV
  • TypeResidential / Group Housing
  • Location
    • Plot No. 2 & 3
    • Kh No 124/3
    • Mouza - Zinagbai Takli
    • Adivasi G.N.S. Society
    • Koradi Road
    • Nagpur
    • Koradi Road
    • Nagpur
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • ...
  • Pincode440030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500045596
  • ReraGenie IDRG-MH-12618

Builder

  • NameShri Parasnath Properties
  • Entity typePartnership
  • GSTIN27ACAFS6732P1ZK
  • PartnerMaya Ravindra Lashkare
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMay 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 May 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KESHAVNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

KESHAV: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area579 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofWardhaman Urban Co-op Bank Ld
Secured amountRs 2.50 crore
CERSAI search filedYes
Declared on3 Sep 2024

Approvals and building plan

Permissible FSI1481.15
Proposed, not sanctioned1,481 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSadar, Nagpur - 440001

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKishore Chiddarwar
ArchitectKISHOR CHIDDARWAR
ArchitectUmesh Tiple
EngineerUmesh Tiple
EngineerNIKHIL GANGAMWAR
Chartered AccountantRishi LAshkare
Chartered AccountantRishi Ravindra Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Shri Parasnath Properties-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Apr 2025

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2File: FORM 2 - Engineer Certificate -MARCH 2025.pdf24 Apr 2026
Form 3File: FORM 3 - CA Certificate - March 2025.pdf24 Apr 2026
Form 1File: FORM 1 - Arch Certificate - March 2025.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - MARCH 2025.pdf24 Apr 2026
Form 1File: FORM 1 - Arch Certificate - June 2025.pdf24 Apr 2026
Form 2File: FORM 2 - Engineer Certificate -JUNE 2025.pdf24 Apr 2026
Form 3File: FORM 3 - CA Certificate - June 2025.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - June 2025.pdf24 Apr 2026
Form 1File: FORM 1 - Arch Certificate -Sep 2025.pdf24 Apr 2026
Form 2File: FORM 2 - Engineer Certificate -SEP 2025.pdf24 Apr 2026
Form 3File: FORM 3- CA Certificate - SEP 2025.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Sep 2025.pdf24 Apr 2026
Form 1File: FORM 1 - Arch Certificate - Dec 2025.pdf24 Apr 2026
Form 2File: FORM 2 - Engineer Certificate -DEC 2025.pdf24 Apr 2026
Form 3File: FORM 3 - CA Certificate - Dec 2025.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - December 2025.pdf24 Apr 2026
Form 1File: Form 1 - June 2023.pdf10 Jul 2025
Form 2File: Form 2 - June 2023.pdf10 Jul 2025
Form 3File: Form 3 - June 2023.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - June 2023.pdf10 Jul 2025
Form 1File: Form 1 - September 2023.pdf10 Jul 2025
Form 2File: Form 2 - September 2023.pdf10 Jul 2025
Form 3File: Form 3 - September 2023.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - September 2023.pdf10 Jul 2025
Form 1File: Keshav - Architect Certificate - Dec 2023.pdf10 Jul 2025
Form 2File: Keshav - Engineer Certificate - Dec 2023.pdf10 Jul 2025
Form 3File: Keshav - CA Certificate - Dec 2023.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Keshav - Disclosure of sold - Dec - 2023.pdf10 Jul 2025
Form 1File: Architect Certificate - March 2024.pdf10 Jul 2025
Form 2File: Engineer Certificate - March 2024.pdf10 Jul 2025
Form 3File: CA Certificate - March 2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - March 2024.pdf10 Jul 2025
Form 1File: Architect Certificate - June 2024.pdf10 Jul 2025
Form 2File: Engineer Certificate - June 2024.pdf10 Jul 2025
Form 3File: CA Certificate - June 2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - June 2024.pdf10 Jul 2025
Form 1File: Keshav - Form 1 - September 2024.pdf10 Jul 2025
Form 2File: Keshav - Form 2 - September 2024.pdf10 Jul 2025
Form 3File: Keshav - Form 3 - September 2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Keshav - Disclosure - September 2024.pdf10 Jul 2025
Form 1File: Keshav - Form 1 - December 2024.pdf10 Jul 2025
Form 2File: Keshav - Form 2 - December 2024.pdf10 Jul 2025
Form 3File: Keshav - Form 3 - December 2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Keshav - Disclosure - December 2024.pdf10 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ilovepdf_merged.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Keshav - Form 1 - December 2024.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Keshav - Form 3 - December 2024_compressed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Keshav - Form 2 - December 2024.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Keshav - Disclosure - December 2024.pdf18 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 - Keshav.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Keshav - Form 2A.pdf5 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Keshav - Form 5.pdf5 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Keshav.pdf19 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC KESHAV.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Keshav - Form 1 - September 2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Keshav - Form 3 - September 2024_compressed.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Keshav - Form 2 - September 2024.pdf6 Dec 2024
Disclosure of sold/ booked inventoryFile: Keshav - Disclosure - September 2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - June 2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - June 2024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - June 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June 2024_compressed.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March 2024_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Keshav - Architect Certificate - Dec 2023.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Keshav - Engineer Certificate - Dec 2023.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Keshav - Disclosure of sold - Dec - 2023.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Keshav - CA Certificate - Dec 2023_compressed.pdf11 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23 - KESHAV.pdf28 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Seperate Bank Account.pdf28 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance - Keshav.pdf27 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf27 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance - Keshav.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 2023 - Keshav.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sept 2023 - Keshav.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2023 - Keshav.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 2023 - Keshav.pdf27 Oct 2023

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KESHAV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koradi Road, Nagpur2,800+ in Nagpur

Builder: Shri Parasnath Properties

Shri Parasnath Properties has 2 registrations on MahaRERA, including GOPALA APARTMENTS and KESHAV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KESHAV is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KESHAV?

The registered promoter entity is Shri Parasnath Properties, a partnership as per the filing. Its GSTIN 27ACAFS6732P1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KESHAV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KESHAV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KESHAV?

The professionals named in the filing: Architect: Kishore Chiddarwar; Architect: KISHOR CHIDDARWAR; Architect: Umesh Tiple; Engineer: Umesh Tiple; Engineer: NIKHIL GANGAMWAR; Chartered Accountant: Rishi LAshkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KESHAV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KESHAV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KESHAV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.