Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 36 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 95%
112 of 112Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

MB Town 4 Phase 1 is a Others project by MAHARANA AND BOSE ASSOCIATES in Nagpur, Maharashtra, registered with MahaRERA as P50500032132 on 14 Dec 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 36 months from the original filing. 0 of the 112 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMB Town 4 Phase 1
  • TypeOthers
  • Location
    • Off Godhani Road
    • Near Zingabai Takli
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440030
  • Pincode440030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500032132
  • ReraGenie IDRG-MH-03854

Builder

  • NameMAHARANA AND BOSE ASSOCIATES
  • Entity typePartnership
  • GSTIN27AAIFM8077H1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersKushal Manindranth Bose, Suryapratap Raghuveer Singh, Jitendranth Manindranath Bose, Sunita Manindranth Bose, Vinay Tukaram Barhate
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2021First promiseDec 2026Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2021
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed127 files

Current status

0%0 of 112 units booked
49.5%Work done, per cost certificate

Figures as on 29 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAILASH TOWERS - ANA9756056
HIM-SHIKHAR TOWERSNA9756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 95%.

KAILASH TOWERS - A35%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor95%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HIM-SHIKHAR TOWERS35%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor95%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered1
Open Space48
BuildingClosed/CoveredOpen SpaceTotal
KAILASH TOWERS - A02323
HIM-SHIKHAR TOWERS12526

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,921 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
Maharana and Bose AssociatesNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI8021.54
Proposed, not sanctioned8,022 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot no 204, Shankar Nagar Square, Dharampeth Extension, Nagpur 440010
Estimated costRs 20.17 cr
Cost incurredRs 10.00 cr
Work done49.55%
BuildingWingEstimatedIncurred
KAILASH TOWERS - ANARs 10.09 crRs 5.00 cr
HIM-SHIKHAR TOWERSNARs 10.09 crRs 5.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKISHOR CHIDDARWAR
EngineerVILAS DESHMUKH
Chartered AccountantAbhishek Munje
Chartered AccountantRishi Lashkare
PartnerRole in project
MAHARANA AND BOSE ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01092622434Dec 2026 → Dec 2029

Reason as filed by the promoterI, Shri Maharana and Bose Associates, promoter / authorized person of the said project, am writing to formally request an extension for the completion date of our residential development project known as MB TOWN 4 PHASE 1, located at Plot No. 18 and 19, CTS No. 37, Kh. No. 35/5, Mouza - Nagpur, Taluka - Nagpur (Urban), District - Nagpur, total plotable area 2920.82 Sq. Mtrs. I, Shri Maharana and Bose Associates, being the Authorized Signatory/Promoter of the project " MB TOWN 4 PHASE 1", bearing MahaRERA Registration No. P50500015969. We would like to bring to your notice the current ground re

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500153Mrinal KatkarMAHARANA AND BOSE ASSOCIATES01/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2021-2022)File: Form 2A (2021-22).pdf29 Aug 2026
Form 2A (FY 2022-2023)File: Form 2A (2022-23).pdf29 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A (2023-24).pdf29 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A (2024-25).pdf29 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A (2025-26).pdf29 Aug 2026
Withdrawal Update Form 1File: MB Town 4 Phase I -FORM 1-JUNE 2026.pdf25 Aug 2026
Withdrawal Update Form 2File: MB Town 4 Phase I -FORM 2-JUNE 2026.pdf25 Aug 2026
Withdrawal Update Form 3File: MB Town 4 Phase I -FORM 3-JUNE 2026_compressed.pdf25 Aug 2026
Form 5 (FY 2021-2022)File: Form 5 (2021-22).pdf25 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 (2023-24).pdf25 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 (2024-25).pdf25 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 (2025-26).pdf25 Aug 2026
Form 5 (FY 2022-2023)File: Form 5 (2022-23).pdf25 Aug 2026
Withdrawal Update Form 1File: form 1 mb town phase 1 march 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: form 2 mb town phase 1 march 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: form 3 mb town phase 1 march 2026_compressed.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1 (Architect Certificate).pdf27 Mar 2026
Withdrawal Update Form 1File: FORM 1 (Architict Certificate).pdf27 Mar 2026
Withdrawal Update Form 1File: form 1 (Architect Certificate).pdf27 Mar 2026
Withdrawal Update Form 2File: FORM 2 (Engineer Certificate).pdf27 Mar 2026
Withdrawal Update Form 2File: FORM2 (Engineer Certificate).pdf27 Mar 2026
Withdrawal Update Form 2File: form 2 (Engineer Certificate).pdf27 Mar 2026
Withdrawal Update Form 3File: FORM 3 (CA Certificate).pdf27 Mar 2026
Withdrawal Update Form 3File: FORM3 (CA Certificate).pdf27 Mar 2026
Withdrawal Update Form 3File: form 3 (CA Certificate).pdf27 Mar 2026
Form 1File: MB Town 4 - Form 1 - March 2025.pdf22 Jul 2025
Form 2File: MB Town 4 - Form 2 - March 2025.pdf22 Jul 2025
Form 3File: MB Town 4 - Form 3 - March 2025.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: MB Town 4 - Disclosure - March 2025.pdf22 Jul 2025
Form 1File: MB Town - Form 1 - December 2024.pdf1 Jul 2025
Form 2File: MB Town - Form 2 - December 2024.pdf1 Jul 2025
Form 3File: MB Town - Form 3 - December 2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: MB Town - Disclosure - December 2024.pdf1 Jul 2025
Form 1File: FORM 1 - SEPTEMBER 2024.pdf1 Jul 2025
Form 2File: FORM 2 - SEPTEMBER 2024.pdf1 Jul 2025
Form 3File: FORM 3 - SEPTEMBER 2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - SEPTEMBER 2024.pdf1 Jul 2025
Form 1File: FORM 1 - JUNE 2024.pdf1 Jul 2025
Form 2File: FORM 2 - JUNE 2024.pdf1 Jul 2025
Form 3File: FORM 3 - JUNE 2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - JUNE 2024.pdf1 Jul 2025
Form 1File: FORM 1 - MARCH 2024.pdf1 Jul 2025
Form 2File: FORM 2 - MARCH 2024.pdf1 Jul 2025
Form 3File: FORM 3 - MARCH 2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - MARCH 2024.pdf1 Jul 2025
Form 1File: FORM 1 - DECEMBER 2023.pdf1 Jul 2025
Form 2File: FORM 2 - DECEMBER 2023.pdf1 Jul 2025
Form 3File: FORM 3 - DECEMBER 2023.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - DECEMBER 2023.pdf1 Jul 2025
Form 1File: FORM 1 - SEPTEMBER 2023.pdf1 Jul 2025
Form 2File: FORM 2 - SEPTEMBER 2023.pdf1 Jul 2025
Form 3File: FORM 3 - SEPTEMBER 2023_compressed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - SEPTEMBER 2023.pdf1 Jul 2025
Form 1File: FORM 1 - JUNE 2023.pdf1 Jul 2025
Form 2File: FORM 2 - JUNE 2023.pdf1 Jul 2025
Form 3File: FORM 3 - JUNE 2023.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - JUNE 2023.pdf1 Jul 2025
Form 1File: FORM 1 - MARCH 2023.pdf1 Jul 2025
Form 2File: FORM 2 - MARCH 2023.pdf1 Jul 2025
Form 3File: FORM 3 - MARCH 2023_compressed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE - MARCH 2023.pdf1 Jul 2025
Proforma of Agreement for saleFile: Draft AFS.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MB Town - Form 1 - December 2024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MB Town - Form 3 - December 2024_compressed.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MB Town - Form 2 - December 2024.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: MB Town - Disclosure - December 2024.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 2023.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPTEMBER 2023.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - DECEMBER 2023.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MARCH 2024.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 2024.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPTEMBER 2024.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - MARCH 2023_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SEPTEMBER 2024_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 2024_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - MARCH 2024_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - DECEMBER 2023_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SEPTEMBER 2023_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 2023_compressed.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SEPTEMBER 2024.pdf6 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MB Town IIIPlot no 42B Zingabai Takli Godhani Road Nagpur 44003046CompletedDec 2018Oct 2018

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 36 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MB Town 4 Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Zingabai Takli2,800+ in Nagpur

2 kmMB Town 4 Phase 1Completed 14Lapsed / revoked 2Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: MAHARANA AND BOSE ASSOCIATES

MAHARANA AND BOSE ASSOCIATES has 2 registrations on MahaRERA, including MB Town 4 Phase 1 and MB TOWN 4. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if MB Town 4 Phase 1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MB Town 4 Phase 1?

The registered promoter entity is MAHARANA AND BOSE ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAIFM8077H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MB Town 4 Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MB Town 4 Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MB Town 4 Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MB Town 4 Phase 1?

The professionals named in the filing: Architect: KISHOR CHIDDARWAR; Engineer: VILAS DESHMUKH; Chartered Accountant: Abhishek Munje; Chartered Accountant: Rishi Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MB Town 4 Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MB Town 4 Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MB Town 4 Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.