KESAR GARDEN 2
RG-MH-88778 · RERA P50500053961 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KESAR GARDEN 2 is a Plotted project by KESAR INDIA LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500053961 on 18 Dec 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 46 of the 46 units on this registration are recorded sold or booked.
At a glance
Project
- NameKESAR GARDEN 2
- TypePlotted
- Location
- Kamptee Road
- Mouza Bhilgaon
- Bhilgaon
- Kamptee
- Nagpur
- 440026
- Pincode440026
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500053961
- ReraGenie IDRG-MH-88778
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Dec 2023
- Promised completion31 Mar 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed91 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 10.00 lakh | Rs 9.73 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pawan Gupta |
| Engineer | M I Ahmad |
| Engineer | Pramod Bankar |
| Chartered Accountant | M C Asawa & Co |
| Partner | Role in project |
|---|---|
| KESAR INDIA LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 May 2026
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Completion CertificateFile: Completion Cert.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate March 2026.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: 30-03-2026_Architect Cert_Oct to Dec 2025_Garden 2.pdf | 3 Apr 2026 |
| Withdrawal Update Form 2File: 09-03-2026_Engineer Certificate_Kesar Garden 2.pdf | 3 Apr 2026 |
| Withdrawal Update Form 3File: 23-03-2026_CA_Certificate_Oct-Dec_2025_Garden2_compressed.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: 09-07-2025_Kesar Garden 2_Architect Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.PDF | 13 Jan 2026 |
| Withdrawal Update Form 3File: Garden 2- CA Certificate April to Jun 2025_compressed.pdf | 13 Jan 2026 |
| Form 2A (FY 2023-2024)File: Kesar Garden 2 Form 2A - 2023-24.pdf | 5 Aug 2025 |
| Form 2A (FY 2024-2025)File: Kesar Garden 2 Form 2A - 2024-25.pdf | 5 Aug 2025 |
| Form 1File: KESAR GARDEN 2 - ARCHITECTS CERTIFICATE - 02-05-2025.pdf | 19 Jun 2025 |
| Form 2File: KESAR GARDEN 2 - ENGINEERS CERTIFICATE - 02-05-2025.pdf | 19 Jun 2025 |
| Form 3File: KESAR GARDEN 2 - CA CERTIFICATE_compressed.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: KESAR GARDEN 2 - DISCLOSURE.PDF | 19 Jun 2025 |
| Form 1File: FORM 1 - ARCHITECT'S CERTIFICATE - 31ST DEC 2023 - KESAR GARDEN 2.pdf | 13 Jun 2025 |
| Form 2File: FORM 2 - Engineer Certificate - 31th dec 2023 - garden 2.pdf | 13 Jun 2025 |
| Form 3File: Kesar Garden 2 - Form 3 - December 2024.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 31th december 2023.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self declaration of quarterly progress.pdf | 13 Jun 2025 |
| Form 1File: FORM 1 - ARCHITECT'S CERTIFICATE - 31ST MARCH 2024 - KESAR GARDEN 2.pdf | 13 Jun 2025 |
| Form 2File: FORM 2 - Engineer Certificate - 31th march 2024 - garden 2.pdf | 13 Jun 2025 |
| Form 3File: Kesar Garden 2 - Form 3 - March 2024.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 31th march 2024.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self_declaration_for_submission_for_quarterly_progress_31stMarch2024.pdf | 13 Jun 2025 |
| Form 1File: FORM 1 - ARCHITECT'S CERTIFICATE - 30TH JUNE 2024 - KESAR GARDEN 2.pdf | 13 Jun 2025 |
| Form 2File: FORM 2 - Engineer Certificate - 30th june 2024 - garden 2.pdf | 13 Jun 2025 |
| Form 3File: Kesar Garden 2 - Form 3 - June 2024.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 30th june 2024.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration for submission for quarterly progress 30thJune2024 pdf.pdf | 13 Jun 2025 |
| Form 1File: FORM 1 - ARCHITECT'S CERTIFICATE - 30TH SEP 2024 - KESAR GARDEN 2.pdf | 13 Jun 2025 |
| Form 2File: FORM 2 - Engineer Certificate - 30th sept 2024 - garden 2.pdf | 13 Jun 2025 |
| Form 3File: Kesar Garden 2 - Form 3 - September 2024.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 30th september 2024.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self_declaration_for_submission_for_quarterly_progress_30thSep2024.pdf | 13 Jun 2025 |
| Form 1File: KESAR GARDEN 2 - ARCHITECTS CERTIFICATE - 10-02-2025 (1).pdf | 13 Jun 2025 |
| Form 2File: KESAR GARDEN 2 - ENGINEERS CERTIFICATE - 10-02-2025.pdf | 13 Jun 2025 |
| Form 3File: KESAR GARDEN 2 - CA CERTIFICATE - MC ASAWA CO - 31ST DEC 2024 compressed.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: KESAR GARDEN 2 - DISCLOSURE OF SOLD BOOKED INNVENTRY - 10-02-2025.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration for submission for quarterly progress 31stDec2024 pdf.pdf | 13 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KESAR GARDEN 2 - ARCHITECTS CERTIFICATE - 10-02-2025 (1).pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KESAR GARDEN 2 - CA CERTIFICATE - MC ASAWA CO - 31ST DEC 2024 compressed.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KESAR GARDEN 2 - ENGINEERS CERTIFICATE - 10-02-2025.pdf | 21 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: KESAR GARDEN 2 - DISCLOSURE OF SOLD BOOKED INNVENTRY - 10-02-2025.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE - 31ST DEC 2023 - KESAR GARDEN 2.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE - 31ST MARCH 2024 - KESAR GARDEN 2.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE - 30TH JUNE 2024 - KESAR GARDEN 2.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE - 30TH SEP 2024 - KESAR GARDEN 2.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kesar Garden 2 - Form 3 - December 2024_compressed.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kesar Garden 2 - Form 3 - March 2024_compressed.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kesar Garden 2 - Form 3 - June 2024_compressed.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kesar Garden 2 - Form 3 - September 2024_compressed.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - 31th dec 2023 - garden 2.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - 31th march 2024 - garden 2.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - 30th june 2024 - garden 2.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - 30th sept 2024 - garden 2.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 31th december 2023.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 31th march 2024.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 30th june 2024.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Kesar Garden 2 - Disclosure of Sold Inventory - 30th september 2024.pdf | 20 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NMRDA Commencement Letter.pdf | 5 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates NA Order.pdf | 4 Dec 2023 |
| Copy of the legal title reportFile: Kesar Graden 2 - MAHARERA - Clarification to RERA Queries.pdf | 22 Nov 2023 |
| Other - LegalFile: Kesar Graden 2 - MAHARERA - Clarification to RERA Queries.pdf | 22 Nov 2023 |
| Other - TechnicalFile: FROM B - Kesar Garden 2 - Revised - Nov 2023 - MAHARERA-compressed.pdf | 22 Nov 2023 |
| Other - TechnicalFile: NMRDA 2nd Email to MAHARERA - Kesar Garden 2 - Nov 2023.pdf | 22 Nov 2023 |
| Copy of the legal title reportFile: title Report 3.pdf | 31 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 31 Oct 2023 |
| Layout approvalFile: Sanction Map.pdf | 6 Sep 2023 |
| Building plan approval or NA orderFile: Sanction Map.pdf | 6 Sep 2023 |
| PAN CardFile: Kesar India Limited PAN.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Finance.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: legal.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Finance.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to LegalFile: legal.pdf | 6 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Map.pdf | 6 Sep 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KESAR GATEWAY | Jagat Plaza F-101 1st Floor Low college Square Amravati Road Nagpur 440010 | 352 | Ongoing | Oct 2022 | Late, Mar 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
Keep KESAR GARDEN 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mouza Bhilgaon2,800+ in Nagpur
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Swapnapurtee - A Project by NMC
SANDEEP DWELLERS PVT. LTD.
KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE
KARAN KOTHARI BUSINESS PARK PRIVATE LIMITE
HBA PARK PHASE-I
HBA CONSTRUCTION COMPANY PVT.LTD
OAK SHANTINIKETAN
OAK Constructions
RAI CREST
RAI UDYOG UNITY MEDISCIENCE PRIVATE LIMITE
BHIL CITY 3
MOHAN BAPURAO MAKDE
See every Nagpur project, with the district possession charts
Builder: KESAR INDIA LIMITED
KESAR INDIA LIMITED has 5 registrations on MahaRERA, including KESAR GARDEN 2 and KESAR GOLD. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if KESAR GARDEN 2 is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KESAR GARDEN 2?
The registered promoter entity is KESAR INDIA LIMITED, a company as per the filing. Its CIN L51220MH2003PLC142989 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KESAR GARDEN 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KESAR GARDEN 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KESAR GARDEN 2?
The professionals named in the filing: Architect: Pawan Gupta; Engineer: M I Ahmad; Engineer: Pramod Bankar; Chartered Accountant: M C Asawa & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KESAR GARDEN 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback