KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B

By KPIN REAL ESTATE VENTURES

RG-MH-17566 · RERA P52000066554 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
78 of 187Construction stages doneacross 17 buildings; furthest along: Basement (if any), 0%
17 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B is a Others project by KPIN REAL ESTATE VENTURES in Raigarh, Maharashtra, registered with MahaRERA as P52000066554 on 11 Jun 2024. Possession is promised by 31 Dec 2026. 0 of the 17 units on this registration are recorded sold or booked, and 78 of 187 construction stages are filed complete.

At a glance

Project

  • NameKENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B
  • TypeOthers
  • Location
    • PAVSALWADI
    • SUDHAGAD
    • PAVSALWADI
    • Pawasalawadi
    • Sudhagad
    • Raigarh
    • 410205
  • Pincode410205
  • RERA no.P52000066554
  • ReraGenie IDRG-MH-17566

Builder

  • NameKPIN REAL ESTATE VENTURES
  • Entity typePartnership
  • PartnersKUNAL AVINASH KUMTHEKAR, PADMAJA KUNAL KUMTHEKAR
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings17 building records
  • Documents filed66 files

Current status

0%0 of 17 units booked
51.8%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
R12NA11101
R13NA11101
S1ANA11101
S1BNA11101
S2ANA11101
S2BNA11101
R1NA11101
R2NA11101
R3NA11101
R4NA11101
R5NA11101
R6NA11101
R7NA11101
R8NA11101
R9NA11101
R10NA11101
R11NA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building17

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

78 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Basement (if any), at 0%.

R1255%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R1355%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
S1A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
S1B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
S2A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
S2B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R155%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R255%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R355%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R455%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R555%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R655%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R755%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R855%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R955%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R1055%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R1155%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntYes35%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17
BuildingClosed/CoveredTotal
R1211
R1311
S1A11
S1B11
S2A11
S2B11
R111
R211
R311
R411
R511
R611
R711
R811
R911
R1011
R1111

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,984 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Dec 2025
LandownerVillageDistrict
KUNAL AVINASH KUMTHEKARGoregaonMumbai Suburban
PADMAJA KUNAL KUMTHEKARGoregaonMumbai Suburban

Approvals and building plan

Sanctioning authorityजिल्हाधिकारी व जिल्हादंडाधिकारी कार्यालय, रायगड - अलिबाग
Permissible FSI926.99
Proposed, not sanctioned927 sq m
Buildings approved17
Buildings sanctioned17

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSBI Pali Branch, Sudhagad, Oswal, Pali, Maharashtra 410205
Estimated costRs 2.78 cr
Cost incurredRs 1.44 cr
Work done51.82%
BuildingWingEstimatedIncurred
-NARs 49.80 lakhRs 34.86 lakh
S1ANARs 22.89 lakh-
S1BNARs 22.89 lakh-
S2ANARs 22.89 lakh-
S2BNARs 22.89 lakh-
R12NARs 10.48 lakhRs 8.38 lakh
R13NARs 10.48 lakhRs 8.38 lakh
R1NARs 10.48 lakhRs 8.38 lakh
R2NARs 10.48 lakhRs 8.38 lakh
R3NARs 10.48 lakhRs 8.38 lakh
R4NARs 10.48 lakhRs 8.38 lakh
R5NARs 10.48 lakhRs 8.38 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDSIGNATURE ARCHITECT
EngineerSanket Suresh Radi
Chartered AccountantMAITRA AND CHOPRA LLP
PartnerRole in project
KPIN REAL ESTATE VENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT.pdf21 May 2026
Withdrawal Update Form 1File: ARCHITECT.pdf21 May 2026
Withdrawal Update Form 1File: FORM 1.pdf21 May 2026
Withdrawal Update Form 2File: Engineer.pdf21 May 2026
Withdrawal Update Form 2File: Engineer.pdf21 May 2026
Withdrawal Update Form 2File: FORM 2.pdf21 May 2026
Withdrawal Update Form 3File: CA 1.pdf21 May 2026
Withdrawal Update Form 3File: CA 1.pdf21 May 2026
Withdrawal Update Form 3File: FORM 3 (1).pdf21 May 2026
Form 2A (FY 2025-2026)File: form 2A.pdf21 May 2026
Form 5 (FY 2025-2026)File: FORM 5.pdf21 May 2026
Withdrawal Update Form 1File: form 1.pdf8 May 2026
Withdrawal Update Form 2File: form 2.pdf8 May 2026
Withdrawal Update Form 3File: form 3.pdf8 May 2026
Withdrawal Update Form 1File: ARCHITECt.pdf7 May 2026
Withdrawal Update Form 2File: Engineer.pdf7 May 2026
Withdrawal Update Form 3File: CA certificate.pdf7 May 2026
Form 2A (FY 2024-2025)File: Engineer certificate- Form 2A R1-13 & S- Annual 2025.pdf27 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5 _R_Signed.pdf27 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (6).pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (2).pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventor.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Jul 2024
Other - LegalFile: Land agreement 64-1 compreess.pdf3 Jun 2024
Other - LegalFile: Land agreement 64-2 (2).pdf3 Jun 2024
Other - LegalFile: Land agreement 64-2-1 (3).pdf3 Jun 2024
Other - LegalFile: IMG-20240205-WA0025.pdf3 Jun 2024
Other - LegalFile: Sr No - 56.pdf3 Jun 2024
Other - LegalFile: Sr No - 54 (1).pdf3 Jun 2024
Layout approvalFile: Clarification for FSI.pdf21 May 2024
Copy of Layout Approval (in case of layout)File: Clarification for FSI.pdf21 May 2024
Other - LegalFile: Clarification for FSI.pdf14 May 2024
Other - TechnicalFile: Declaration cum Undertaking.pdf29 Apr 2024
Layout approvalFile: PLAN 1 HIGHLIGHTED.pdf1 Feb 2024
Layout approvalFile: PLAN 2.pdf1 Feb 2024
Layout approvalFile: PLAN 3 HIGHLIGHTED.pdf1 Feb 2024
Copy of the legal title reportFile: title.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: PLAN 1 HIGHLIGHTED.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: PLAN 2.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: PLAN 3 HIGHLIGHTED.pdf1 Feb 2024
Proforma of Agreement for saleFile: Agreement for sale (4) (1).pdf1 Feb 2024
Proforma of Allotment letterFile: Allotment Letter-Draft.pdf1 Feb 2024
Building plan approvalFile: Kumthekar Collector Order.pdf22 Jan 2024
PAN CardFile: kpin real estate ventures.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter- Letterhead.pdf22 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Letter- Letterhead.pdf22 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Kumthekar Collector Order.pdf22 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Kumthekar Collector Order.pdf22 Jan 2024
Declaration about Commencement CertificateFile: Declaration about CC- Letterhead.pdf22 Jan 2024
Declaration in FORM BFile: FORM B KPIN.pdf22 Jan 2024
CERSAI detailsFile: Cersai Certificate - Letterhead.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised CA Final.pdf22 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf22 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER-FINAL (3).pdf22 Jan 2024
Deviation Report with respect to Allotment letterFile: No Deviation Report- Allotment.pdf22 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale- letterhead.pdf22 Jan 2024

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KENISHA RESORT RESIDENCES - CLUSTER R1 TO R1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUDHAGAD,PAVSALWADI5,900+ in Raigarh

Builder: KPIN REAL ESTATE VENTURES

KPIN REAL ESTATE VENTURES has 2 registrations on MahaRERA, including KENISHA RESORT RESIDENCES and KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B?

The registered promoter entity is KPIN REAL ESTATE VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B?

The professionals named in the filing: Architect: DSIGNATURE ARCHITECT; Engineer: Sanket Suresh Radi; Chartered Accountant: MAITRA AND CHOPRA LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KENISHA RESORT RESIDENCES - CLUSTER R1 TO R1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.