SHUBHAM RESIDENCY

By G D JAIN INFRA PROJECTS

RG-MH-25520 · RERA P52000009136 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 82 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 82 months from the original
44 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 20%
67 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 197 documents Report an error

SHUBHAM RESIDENCY is a Others project by G D JAIN INFRA PROJECTS in Raigarh, Maharashtra, registered with MahaRERA as P52000009136 on 19 Aug 2017. Possession is promised by 31 Oct 2026. The completion date has moved by 82 months from the original filing. 85 of the 152 units on this registration are recorded sold or booked, and 44 of 66 construction stages are filed complete.

At a glance

Project

  • NameSHUBHAM RESIDENCY
  • TypeOthers
  • Location
    • SURVEY NO 156/3
    • 156/5
    • 163/1 AND 163/2
    • KHOPOLI PALI ROAD
    • Pali
    • Sudhagad
    • Raigarh
    • 410205
  • Pincode410205
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000009136
  • ReraGenie IDRG-MH-25520

Builder

  • NameG D JAIN INFRA PROJECTS
  • Entity typePartnership

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2019)
  • Buildings6 building records
  • Documents filed197 files

Current status

56%85 of 152 units booked
72.5%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE- 1 WING ANA6524832
TYPE 1 WING BNA6524630
TYPE 5 WING JNA6518018
TYPE 4 WING KNA6528028
TYPE 5 WING LNA6518018
TYPE 6 WING MNA6526026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 20%.

TYPE- 1 WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE 1 WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE 5 WING J30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%
TYPE 4 WING K91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE 5 WING L91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE 6 WING M12%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
TYPE- 1 WING A11
TYPE 1 WING B11
TYPE 5 WING J11
TYPE 4 WING K11
TYPE 5 WING L11
TYPE 6 WING M11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,972 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Dec 2025

Approvals and building plan

Sanctioning authorityCOLLECTOR ALIBAUG
Permissible FSI5904.0
Proposed, not sanctioned5,904 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 14 B GROHITAM BUILDING 1ST FLOOR SECTOR 19 VASHI, NAVI MUMBAI-400703
Estimated costRs 11.87 cr
Cost incurredRs 8.60 cr
Work done72.5%
BuildingWingEstimatedIncurred
TYPE- 1 WING ANARs 2.18 crRs 2.18 cr
TYPE 1 WING BNARs 2.18 crRs 2.18 cr
TYPE 4 WING KNARs 2.09 crRs 2.09 cr
TYPE 6 WING MNARs 2.09 crRs 29.63 lakh
TYPE 5 WING JNARs 1.33 crRs 12.44 lakh
TYPE 5 WING LNARs 1.33 crRs 1.33 cr
-NARs 66.33 lakhRs 40.50 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTURE INTERIOR DESIGNS
ArchitectHARSHAD K HATKAMKAR
EngineerKAMLESH PATEL
EngineerROHIT SURESH AMBEKAR
EngineerSACHIN V PATEL
Chartered AccountantMITESH RAMESH JAIN
Chartered AccountantGAJANAN SUNIL SAKLA
Chartered AccountantGANESH I KONAR
PartnerRole in project
G D JAIN INFRA PROJECTS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000012971Dec 2019 → Oct 2023

Reason as filed by the promoterWe have completed the project within time and applied for the Occupancy Certificate dated 19-05-2021 at the office of Collector, Raigad-Alibagh, and the Collector transfer our case to Nagar Panchayat, Pali to proceed as Pali Gram Panchayat become Nagar Panchayat and as instruction/letter from Collector office to follow up with Nagar panchayat Pali, we have applied fresh application dated 19/6/2022 to issue occupancy certificate at Nagar Panchayat Pali (both application letter and reply from collector letter attached herewith). Now we are followin at Pali but they have not issued Occupancy Cert

EXT52000011100Dec 2019 → Jun 2022

Reason as filed by the promoterWe have completed the project withing time , and in process of handover of possession to the respective buyers, and we have already applied for the Occupency Certificate at the office of Collector of Raigad-Alibagh, and we are in following up the matter for the same. The reason for applying to get extension of RERA registration, as we have fresh sale agreement to register at Sub-Registrar office sudhagad pali but office of Sub-registrar of sudhagad pali, is not ready to register any document without either rera extension certificate or Occupency Certificate. So we applied for extension of RERA

EXT52000003808Dec 2019 → Nov 2020

Reason as filed by the promoterDUE TO HEAVY RAIN DURING THE YEAR COMPARE FROM LAST SO MANY YEAR SO CONSTRUCTION ACTIVITY COMPLETELY STOPPED DURING THIS PERIOD. EXTENSION TIME REQUIRED TO COMPLETE PENDING WORK OF 5% AND OTHER GROUND WORK TO BE COMPLETED.

EA20122518862Dec 2019 → Oct 2026

Reason as filed by the promoterWe have registered project with RERA as project PHASE-I, containing 6 (six) wing, but due to market condition we have constructed 4 (FOUR) wing out of six wing and according applied for occupancy certificate on 17/06/2022 and finally received occupancy certificate on 23/01/2025 as PART OCCUPANCY CERTIFICATE of four completed wing. further we are not going to construct remaining 2 (TWO) wings as market condition of local area is not favourable. Further, due to our RERA registration status is Inactive, we are not able to register the documents with respective buyers at sub-registrar office pali.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed197

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 197 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: PLAN 1.pdf6 Aug 2026
Layout approvalFile: PLAN 2.pdf6 Aug 2026
Layout approvalFile: PLAN 3.pdf6 Aug 2026
Layout approvalFile: PLAN 7.pdf6 Aug 2026
Layout approvalFile: PLAN 8.pdf6 Aug 2026
Withdrawal Update Form 1File: FORM 1 ARC.pdf6 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Aug 2026
Withdrawal Update Form 3File: FORM 3 CA.pdf6 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf6 Aug 2026
Building plan approvalFile: PLAN 1 APPROVED SCAN.pdf20 May 2026
Building plan approval or NA orderFile: NA ORDER 19-05-2015.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2023-24.pdf6 Apr 2026
Form 3File: FORM-3-2023-24.pdf6 Apr 2026
Form 2File: ENG CERTIFICATE.pdf6 Apr 2026
Form 1File: Form 1 Arc cert.pdf6 Apr 2026
Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Form 2File: FORM 2.pdf6 Apr 2026
Form 3File: FORM-3-2024-25.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2024-25.pdf6 Apr 2026
Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Form 2File: FORM 2.pdf6 Apr 2026
Form 3File: FORM-3-2024-25.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2024-25.pdf6 Apr 2026
Form 2File: FORM 2.pdf6 Apr 2026
Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Form 3File: FORM-3-2024-25.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2024-25.pdf6 Apr 2026
Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Form 2File: FORM 2.pdf6 Apr 2026
Form 3File: FORM-3-2024-25.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2024-25.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARC CERT.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 2024-25 DEC (2).pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 2024-25 DEC (2).pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 2024-25 DEC (2).pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 2024-25 DEC (2).pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 2024-25 DEC (2).pdf6 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf6 Apr 2026
Form 5 (FY 2024-2025)File: Form -5 2024-25.pdf6 Apr 2026
Form 2A (FY 2017-2018)File: Form 2A 17-18.pdf13 Dec 2025
Form 2A (FY 2018-2019)File: Form 2A 18-19.pdf13 Dec 2025
Form 2A (FY 2019-2020)File: Form 2A 19-20.pdf13 Dec 2025
Form 2A (FY 2020-2021)File: Form 2A 20-21.pdf13 Dec 2025
Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf13 Dec 2025
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf13 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf13 Dec 2025
Form 5 (FY 2018-2019)File: form-5 2018-19.pdf12 Dec 2025
Form 5 (FY 2019-2020)File: Form-5 2019-20.pdf12 Dec 2025
Form 5 (FY 2020-2021)File: Form-5 2020-21.pdf12 Dec 2025
Form 5 (FY 2021-2022)File: Form-5 2021-22.pdf12 Dec 2025
Form 5 (FY 2022-2023)File: Form -5 2022-23.pdf12 Dec 2025
Form 5 (FY 2023-2024)File: Form-5 2023-24.pdf12 Dec 2025
Form 1File: Form 1.pdf10 Dec 2025
Form 2File: ENG CERT.pdf10 Dec 2025
Form 3File: CA Certificate.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2017-18.pdf10 Dec 2025
Form 1File: Form 1.pdf10 Dec 2025
Form 2File: ENG CERT.pdf10 Dec 2025
Form 3File: CA Certificate.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2017-18.pdf10 Dec 2025
Form 1File: Form 1.pdf10 Dec 2025
Form 2File: ENG CERT.pdf10 Dec 2025
Form 3File: CA Certificate.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2017-18.pdf10 Dec 2025
Form 1File: architect certificate.pdf10 Dec 2025
Form 2File: ENG CERTIFICATE.pdf10 Dec 2025
Form 3File: CA CERTIFICATE.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: DOSUSI FY 2018-19.pdf10 Dec 2025
Form 1File: architect certificate.pdf10 Dec 2025
Form 2File: ENG CERTIFICATE.pdf10 Dec 2025
Form 3File: CA CERTIFICATE.pdf10 Dec 2025

How this compares with Raigarh

56%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 82 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUBHAM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHOPOLI PALI ROAD5,900+ in Raigarh

2 kmSHUBHAM RESIDENCYCompleted 1Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: G D JAIN INFRA PROJECTS

G D JAIN INFRA PROJECTS has 1 registration on MahaRERA, including SHUBHAM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHUBHAM RESIDENCY is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBHAM RESIDENCY?

The registered promoter entity is G D JAIN INFRA PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBHAM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUBHAM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBHAM RESIDENCY?

The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Architect: HARSHAD K HATKAMKAR; Engineer: KAMLESH PATEL; Engineer: ROHIT SURESH AMBEKAR; Engineer: SACHIN V PATEL; Chartered Accountant: MITESH RAMESH JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBHAM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBHAM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBHAM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.