Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
10 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 80%
160 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SHREE GAJANAN TOWERS is a Residential / Group Housing project by OSWAL DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000079467 on 7 Mar 2025. Possession is promised by 31 Dec 2028. 0 of the 160 units on this registration are recorded sold or booked, and 10 of 55 construction stages are filed complete.

At a glance

Project

  • NameSHREE GAJANAN TOWERS
  • TypeResidential / Group Housing
  • Location
    • PALI
    • Sudhagad
    • Raigarh
    • 410205
  • Pincode410205
  • RERA no.P52000079467
  • ReraGenie IDRG-MH-31133

Builder

  • NameOSWAL DEVELOPERS
  • Entity typePartnership
  • Representative Of Oswal Sanjay Subhash HufOSWAL SANJAY SUBHASH HUF -
  • PartnersKSHAMA SANJAY OSWAL, ANISH SANJAY OSWAL
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed70 files

Current status

0%0 of 160 units booked
34.1%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A WING A1NA7726632
BUILDING A WING A2NA7726632
BUILDING A WING A3NA7726632
BUILDING A WING A4NA7720222
BUILDING BNA8742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 80%.

BUILDING A WING A150%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
BUILDING A WING A250%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
BUILDING A WING A325%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A WING A425%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered5
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A WING A1101
BUILDING A WING A2101
BUILDING A WING A3101
BUILDING A WING A4101
BUILDING B112

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,570 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 May 2025
LandownerVillageDistrict
VIDHYADHAR DAMODAR DHARAPPali Raigarh
DHANANJAY DAMODAR DHARAPPali Raigarh
MANDAR MORESHWAR DHARAPPali Raigarh

Approvals and building plan

Sanctioning authorityPALI NAGAR PANCHAYAT
Permissible FSI10362.95
Proposed, not sanctioned10,363 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT PALI TAL-SUDHAGAD DIST-RAIGAD 410205
Estimated costRs 114.25 cr
Cost incurredRs 39.00 cr
Work done34.14%
BuildingWingEstimatedIncurred
BUILDING A WING A1NARs 22.80 crRs 7.80 cr
BUILDING A WING A2NARs 22.80 crRs 7.80 cr
BUILDING A WING A3NARs 22.80 crRs 7.80 cr
BUILDING A WING A4NARs 22.80 crRs 7.80 cr
BUILDING BNARs 22.80 crRs 7.80 cr
-NARs 25.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEKHAR NAHAR NAHAR
EngineerGANESH MEHENDALE GANESH MEHENDALE
Chartered AccountantMOHAMMED DESHMUKH
PartnerRole in project
OSWAL DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf30 Apr 2026
Withdrawal Update Form 1File: FROM 1.pdf10 Feb 2026
Withdrawal Update Form 2File: FROM 2.pdf10 Feb 2026
Withdrawal Update Form 3File: FROM 3.pdf10 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf15 Nov 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf15 Nov 2025
Withdrawal Update Form 3File: CA CERTIFICATE - converted.pdf15 Nov 2025
Form 1File: ARCHITECT CERTIFICATE.pdf1 Jul 2025
Form 2File: ENGINEER CERTIFICATE FOR 31 3 2025.pdf1 Jul 2025
Form 3File: CA CERTIFICATE - converted.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf1 Jul 2025
Declaration in FORM BFile: FORM B.pdf18 Feb 2025
Layout approvalFile: Renewal 1-5 - converted.pdf13 Feb 2025
Layout approvalFile: Renewal 2-5 - converted.pdf13 Feb 2025
Layout approvalFile: Renewal 3-5 - converted.pdf13 Feb 2025
Layout approvalFile: Renewal 4-5 - converted.pdf13 Feb 2025
Layout approvalFile: Renewal 5-5 - converted.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: Renewal 1-5 - converted.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: Renewal 2-5 - converted.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: Renewal 3-5 - converted.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: Renewal 4-5 - converted.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: Renewal 5-5 - converted.pdf13 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: APPENDIX D.pdf29 Jan 2025
Other - LegalFile: CORRECTION DEED (1TO 40).pdf11 Jan 2025
Other - LegalFile: CORRECTION DEED (40 TO 95).pdf11 Jan 2025
Other - LegalFile: CORRECTION DEED(95 TO 125).pdf11 Jan 2025
Layout approvalFile: PLAN 2.pdf8 Jan 2025
Layout approvalFile: PLAN 3.pdf8 Jan 2025
Layout approvalFile: PLAN 4.pdf8 Jan 2025
Layout approvalFile: PLAN 5.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: PLAN 2.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: PLAN 3.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: PLAN 4.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: PLAN 5.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: PERMISSION2022.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: PALI NAGARPANCHAYAT LETTER.pdf9 Dec 2024
Other - FinanceFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf18 Nov 2024
Declaration about Commencement CertificateFile: DECLARATION REGARDING CC NEW.pdf8 Nov 2024
Other - TechnicalFile: DECLARATION REGARDING AREA FOR RERA.pdf30 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CERTIFICATE ARCHITECT.pdf16 Aug 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf9 Aug 2024
Deviation Report with respect to Allotment letterFile: DECLARATION REGARDING DEVIATION.pdf9 Aug 2024
Foreclosure of the ProjectFile: ONE PLOT ONE REGISTRATION.pdf9 Aug 2024
Proforma of Agreement for saleFile: RERA AGREEMENT.pdf9 Aug 2024
Other - TechnicalFile: ANNAXURE A- OTHER TECHNICAL.pdf8 Aug 2024
Building plan approvalFile: PLAN 1 - converted.pdf7 Aug 2024
Building plan approvalFile: PLAN 2.pdf7 Aug 2024
Building plan approvalFile: PLAN 3.pdf7 Aug 2024
Building plan approvalFile: PLAN 4.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1 - converted.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 4.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf7 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION REGARDING BANK DETAILS NEW.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 NEW 1.pdf15 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_NEW (1).pdf15 Jun 2024
Copy of the legal title reportFile: SEARCH REPORT NEW.pdf6 Jun 2024
Other - LegalFile: DECLARATION REGARDING DEVELOPMENT OF LAND.pdf18 May 2024
PAN CardFile: PAN CARD OF FIRM.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf8 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FINACIAL ENCUMBRANCE (2 files merged).pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: PERMISSION.pdf3 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION FINACIAL ENCUMBRANCE (2 files merged).pdf3 May 2024
Deviation Report with respect to model copy of AgreementFile: DECLARATION REGARDING DEVIATION.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNAXURE A - SANJEEV OSWAL.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNAXURE A- KSHAMA OSWAL.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNAXURE A- ANISH OSWAL.pdf3 May 2024

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GAJANAN TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALI5,900+ in Raigarh

Builder: OSWAL DEVELOPERS

OSWAL DEVELOPERS has 2 registrations on MahaRERA, including JINENDRA ESTATE and SHREE GAJANAN TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHREE GAJANAN TOWERS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GAJANAN TOWERS?

The registered promoter entity is OSWAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GAJANAN TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GAJANAN TOWERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GAJANAN TOWERS?

The professionals named in the filing: Architect: SHEKHAR NAHAR NAHAR; Engineer: GANESH MEHENDALE GANESH MEHENDALE; Chartered Accountant: MOHAMMED DESHMUKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GAJANAN TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GAJANAN TOWERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GAJANAN TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.