  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 74 documents Report an error

Keerthana Pearls is a Residential/Group Housing project by Keerthana Developers in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/335/PR/190726/002734 on 26 Jul 2019. Possession is promised by 3 Sep 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameKeerthana Pearls
  • TypeResidential/Group Housing
  • Location
    • Puttur
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/335/PR/190726/002734
  • ReraGenie IDRG-KA-32710

Builder

  • NameKeerthana Developers
  • Entity typePartnership Firm
  • Authorized SignatoryVeena Kumari
  • Other registrations2 more →

Key dates

this monthRegisteredJul 2019First promiseDec 2020Revised toSep 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Jul 2019
  • Promised completion3 Sep 2021
  • Revised completionRevised to 3 Sep 2021 (originally 3 Dec 2020)
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Keerthana Pearls---27027

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 26 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,144 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.41 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAlva Assoicates
EngineerDesign Associates

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2020 → Sep 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed74

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/335/PR/190726/002734 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Source of FundFile: Fund Sourcce.pdf26 Sep 2025
Fund crediting declaration letterFile: Declaration lett.pdf26 Sep 2025
JDAFile: JDA KP B Block.pdf26 Sep 2025
Structural Stability CertificateFile: 1) Structural cert new.pdf26 Sep 2025
Consent letterFile: 2) Consent Lett.pdf26 Sep 2025
Partnership DeedFile: Partnership deed.pdf26 Sep 2025
Structural Stability CertificateFile: Structural certificateNEW.pdf30 Aug 2025
Modification ClarificationFile: A 1 Modi reason lett.pdf30 Jul 2025
Annual Audit reportFile: A 2 Form 7 Annual audit CA.pdf30 Jul 2025
Additional land Sale deedsFile: Additn Land Pur.pdf30 Jul 2025
KSPCBFile: KSPCB -Appr- KP.pdf30 Jul 2025
Approved building planFile: 1Aprovd building plan KP B block New 3.pdf30 Jul 2025
LicenseFile: 1 Appr Licensce.pdf30 Jul 2025
Structural Stability CertiifcateFile: 2 Structural stability.pdf30 Jul 2025
Approved Building plan 1File: Apprved buiding plan -1.pdf30 Jul 2025
Approved building Plan 2File: Appred buidling plan -2.pdf30 Jul 2025
Approved building plan 3File: 1Aprovd building plan KP B block New 3.pdf30 Jul 2025
Already registered project ongoing detailsFile: Compl Status KP-.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: Approved Plan_Licese.pdf-
Elevation, Sections, Specifications ( If changes are there )File: Specification.pdf-
Consent LetterFile: Consent Lett_compressed.pdf-
Chartered Accountant CertificateFile: From -4 CA.pdf-
Notarized AffidavitFile: Rera Affidavit.pdf-
Engineer CertificateFile: Form -6 Engg cert.pdf-
Architect CertificateFile: Form -5 Arch cert.pdf-
Structural Engineer Certificate for stability of structureFile: Structural certificateNEW.pdf-
Modification of Plan DetailsFile: Apprved buiding plan.pdf-
Modification of Plan DetailsFile: 1Aprovd building plan KP B block New 3.pdf-
Modification of Plan DetailsFile: 9 Commence cer.pdf-
Modification of Plan DetailsFile: Licensce.pdf-
Modification of Plan DetailsFile: No of Flats KP.pdf-
Modification of Plan DetailsFile: No of Flats.pdf-
Document 1File: KSPCB -Appr- KP.pdf-
Revised licenseFile: Licensce.pdf-
9 Commence cer-
Apprved buiding plan-
20 Proform Sal Deed KP-
12 Proforma agremnt sale-
13 Land Docs-
Apprved buiding plan-
11 Approved layout plan-
Allotment lett-
17 Brochure-
22 Project Speci-
8 EC-
affidavit section (3) voilation-
Khatha-
mou-ilovepdf-compressed-
RTC-
Convertion Certificate-
Keerthan developers CFE copy-
Unnamed document-
11 Approved layout plan-
Balance Sheet 2017 - 2018File: BS 2017.pdf-
Balance Sheet 2016 - 2017File: BS 2016.pdf-
Balance Sheet 2015 - 2016File: BS 2015.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P&L 2017.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P&L 2016.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L 2015.pdf-
Cash Flow Statement 2017 - 2018File: CF 2017.pdf-
Cash Flow Statement 2016 - 2017File: CF 2016.pdf-
Auditor's Report 2017 - 2018File: Aud rprt 2017.pdf-
Auditor's Report 2016 - 2017File: Aud rprt 2016.pdf-
Auditor's Report 2015 - 2016File: Aud rprt 2015.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR V 16-17.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR V-15-16.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR V-14-15.pdf-
19 Form B-
Prospectus/BrochureFile: 17 Brochure.pdf-
Advertisement Copy 1File: KP Advertisment.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1257_335_PR_190726_002734.xlsx-
Occupancy CertificateFile: Completion cetificate KP.jpg-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affida.pdf-
0File: Completion cetificate KP.jpg-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 9 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Keerthana Pearls on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmKeerthana PearlsOther 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Keerthana Developers

Keerthana Developers has 3 registrations on RERA Karnataka, including KEERTHANAS RADHA RESIDENCY and Keerthana Pearls City. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Keerthana Pearls is delayed beyond 3 Sep 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Keerthana Pearls?

The registered promoter entity is Keerthana Developers, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Keerthana Pearls?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Keerthana Pearls?

The professionals named in the filing: Architect: Alva Assoicates; Engineer: Design Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Keerthana Pearls?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Keerthana Pearls. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Keerthana Pearls to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.