Home / Browse projects / Mumbai Suburban, Maharashtra / KAVYA SHREE LAXMI
KAVYA SHREE LAXMI
RG-MH-12052 · RERA P51800006272 · Last updated on MahaRERA portal: 9 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 54 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KAVYA SHREE LAXMI is a Others project by KAVYA KCD DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006272 on 14 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 54 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameKAVYA SHREE LAXMI
- TypeOthers
- Location
- CHARKOP
- Borivali
- Mumbai Suburban
- 400067
- Pincode400067
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800006272
- ReraGenie IDRG-MH-12052
Builder
- NameKAVYA KCD DEVELOPERS
- Entity typePartnership
- PartnersMANSUKHLAL CHATRABHUJ VORA, JIGNESH MANSUKHLAL VORA
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KAVYA SHREE LAXMI CHSL | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.
KAVYA SHREE LAXMI CHSL: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| KAVYA KCD DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS
Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/12/2024
Reason as filed by the promoter1 with reference to the allegations and concerns raised in connection with the "Kavya Shree Laxmi" registered with MahaRERA on 14.08.2017 bearing registration No. P51800006272 (hereinafter referred to as the "said Project") which are stated hereinbelow 2 Dispute Regarding Unit allotment and subsequent Complaints: The said Project encountered an unforeseen impediment when one of the tenants, Mr Rajesh Raut, expressed dissatisfaction with the allotment of his unit in the project and subsequently lodged complaints with multiple authorities, including the local police, NGOs, and MHADA These compla
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000396835 | DINESH LAXMAN SINGH | M/S KAVYA KCD DEVELOPERS THROUGH ITS PARTNER MR. NIMISH VORA | 05/08/2023 |
| CC12500063 | Prakash Ratanlal Jain | KAVYA KCD DEVELOPERS | 07/01/2025 |
| CC12502261 | Kiran Tryambak Bagale | KAVYA KCD DEVELOPERS | 05/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: form 3 march 25.pdf | 9 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 march 25.pdf | 9 May 2025 |
| Disclosure of sold/ booked inventoryFile: KKD-KAVYA SHREELAXMI-INVENTORY OF SOLD AND UNSOLD (1) (1).pdf | 9 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARCHITECT CERTIFICATE KAVYA SHREE LAXMI 31-03-2025.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KKD-KAVYA SHREELAXMI-FORM-2.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf | 3 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 24.pdf | 29 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 19-20.pdf | 29 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 20-21.pdf | 29 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf | 29 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf | 29 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: inventory disclosure.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: KKD-DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf | 13 Mar 2025 |
| Certificates of CA (Form 3)File: form 3 revised.pdf | 12 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 24.pdf | 10 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 10 Mar 2025 |
| Declaration in FORM BFile: KAVYA SHREELAXMI-FORM-B.pdf | 8 Mar 2025 |
| Certificates of CA (Form 3)File: KCD-FORM 3-30-09-2024.pdf | 17 Feb 2025 |
| Certificates of CA (Form 3)File: KCD-FORM 3 31-12-2024.pdf | 17 Feb 2025 |
| Certificates of CA (Form 3)File: july to sep 24 form 3 (2).pdf | 5 Feb 2025 |
| Certificates of CA (Form 3)File: oct to dec 24 form 3 (2).pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf | 30 Dec 2024 |
| Certificates of CA (Form 3)File: KCD-FORM-3 12 23.pdf | 28 Dec 2024 |
| Certificates of CA (Form 3)File: KCD-FORM-3 03 24.pdf | 28 Dec 2024 |
| Certificates of CA (Form 3)File: KCD-FORM-3 06 24.pdf | 28 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KCD-FORM-2-31-12-2023.pdf | 26 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KCD-FORM-2-31-03-2024.pdf | 26 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KCD-FORM-2-30-06-2024.pdf | 26 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 06 24.pdf | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 09 24.pdf | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 24.pdf | 21 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf | 18 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 31-12-23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Kavya Shreelaxmi-inventory disclosure format.pdf | 22 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: KAVYA SHREELAXMI INVENTORY-31032023.pdf | 29 Nov 2023 |
| Declaration in FORM BFile: FORM B AFFIDAVI CUM DECLARATION KCD.pdf | 24 Nov 2023 |
| CERSAI detailsFile: KAVYA SHREELAXMI-CERSAI DECLARATION.pdf | 3 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: KAVYA SHREELAXMI INVENTORY.pdf | 3 Nov 2023 |
| Certificates of CA (Form 3)File: 7 Certificates of CA (Form 3) (1).pdf | 3 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-KCD-06 23.pdf | 5 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-KCD-09 23.pdf | 5 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Kavya Shree Laxmii-06 23.pdf | 3 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Kavya Shree Laxmii-09 23.pdf | 3 Oct 2023 |
| Certificates of CA (Form 3)File: Form-3 KCC 2020.pdf | 21 Aug 2023 |
| Certificates of CA (Form 3)File: Form-3 KCD 2021.pdf | 21 Aug 2023 |
| Certificates of CA (Form 3)File: Form-3 KCD 2022.pdf | 21 Aug 2023 |
| Certificates of CA (Form 3)File: Form-3 KCD 2023.pdf | 21 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 KCD 21-22.pdf | 18 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 KCD 22-23.pdf | 18 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 20.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 21.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 22.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 23.pdf | 17 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM -2A KCD 03 22.pdf | 17 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM -2A KCD 03 23.pdf | 17 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 12 2022.pdf | 10 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 03 2023.pdf | 10 May 2023 |
| Certificates of CA (Form 3)File: CA form 3 09 19.pdf | 4 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Kavya KCD Developers 20-21.pdf | 5 Jan 2023 |
| Certificates of CA (Form 5)File: KAVYA_KCD 17-18.pdf | 6 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KAVYA_KCD 18-19.pdf | 6 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KAVYA_KCD 19-20.pdf | 6 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 KCD 19-20 SHREE LAXMI.pdf | 26 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A KCD DEVELOPER 2020.pdf | 28 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A KCD DEVELOPER 2021.pdf | 28 Jul 2021 |
| Declaration about Commencement CertificateFile: CC COVERING LETTER CHARKOP.pdf | 21 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf | 17 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A Kavya 19-20.pdf | 14 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 14 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DISLCOSURE.pdf | 14 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf | 14 Jul 2021 |
| Certificates of CA (Form 3)File: Updated CA Certifcate.pdf | 10 Oct 2018 |
| Certificates of CA (Form 5)File: KAVYA SHREE LAXMI compressed.pdf | 9 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: charkop kcd architect cert.pdf | 11 Sep 2018 |
| Layout approvalFile: Layout Plan.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate.pdf | 29 Jul 2017 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KAVYA HILL VIEW | THANE | 107 | Completed | Jan 2012 | Late, Mar 2012 |
| Atlas, Thane | THANE | 45 | Completed | Mar 2011 | Late, May 2011 |
| Atlantis, Thane | THANE | 84 | Completed | Mar 2010 | Late, Jul 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KAVYA SHREE LAXMI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARKOP6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 331 registered projects within 2 km.
Ruparel Optima Ph I
Ruparel Infra & Realty Pvt Ltd
"SALE BLDG NO. 6 (A & B) WING KNOWN AS NORTHER
N.ROSE DEVELOPERS PVT LTD
JP Commerz
Metallica Industries Limited
Ruparel Skygreens I
Shree Siddhivinayak Infrastructure & Realt
ShreejiAikyam
Rushabh Developers
Shiv Vardaan
NAVKARMIK HOMES LLP, URVI CONSTRUCTION
See every Mumbai Suburban project, with the district possession charts
Builder: KAVYA KCD DEVELOPERS
KAVYA KCD DEVELOPERS has 1 registration on MahaRERA, including KAVYA SHREE LAXMI. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that KAVYA SHREE LAXMI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KAVYA SHREE LAXMI is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KAVYA SHREE LAXMI?
The registered promoter entity is KAVYA KCD DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KAVYA SHREE LAXMI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KAVYA SHREE LAXMI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KAVYA SHREE LAXMI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in KAVYA SHREE LAXMI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback