Home / Browse projects / Mumbai Suburban, Maharashtra / KAVYA SHREE LAXMI

Registration lapsed No litigation declared Others project

KAVYA SHREE LAXMI

By KAVYA KCD DEVELOPERS

RG-MH-12052 · RERA P51800006272 · Last updated on MahaRERA portal: 9 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 54 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
3 of 11Construction stages donefurthest along: Stilt Floor, 90%
3Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

KAVYA SHREE LAXMI is a Others project by KAVYA KCD DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006272 on 14 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 54 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameKAVYA SHREE LAXMI
  • TypeOthers
  • Location
    • CHARKOP
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006272
  • ReraGenie IDRG-MH-12052

Builder

  • NameKAVYA KCD DEVELOPERS
  • Entity typePartnership
  • PartnersMANSUKHLAL CHATRABHUJ VORA, JIGNESH MANSUKHLAL VORA
  • Declared earlier projects4 →

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAVYA SHREE LAXMI CHSLNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

KAVYA SHREE LAXMI CHSL: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered28
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area751 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBMC
Permissible FSI2999.16
Proposed, not sanctioned769 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, VENUS APARTMENT, GROUND FLOOR WADIA STREET, TARDEO, MUMBAI-400034

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
KAVYA KCD DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010443Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51800013465Jun 2021 → Dec 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/12/2024

EXT51800027861Jun 2021 → Dec 2025

Reason as filed by the promoter1 with reference to the allegations and concerns raised in connection with the "Kavya Shree Laxmi" registered with MahaRERA on 14.08.2017 bearing registration No. P51800006272 (hereinafter referred to as the "said Project") which are stated hereinbelow 2 Dispute Regarding Unit allotment and subsequent Complaints: The said Project encountered an unforeseen impediment when one of the tenants, Mr Rajesh Raut, expressed dissatisfaction with the allotment of his unit in the project and subsequently lodged complaints with multiple authorities, including the local police, NGOs, and MHADA These compla

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000396835DINESH LAXMAN SINGHM/S KAVYA KCD DEVELOPERS THROUGH ITS PARTNER MR. NIMISH VORA05/08/2023
CC12500063Prakash Ratanlal JainKAVYA KCD DEVELOPERS07/01/2025
CC12502261Kiran Tryambak BagaleKAVYA KCD DEVELOPERS05/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: form 3 march 25.pdf9 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 march 25.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: KKD-KAVYA SHREELAXMI-INVENTORY OF SOLD AND UNSOLD (1) (1).pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARCHITECT CERTIFICATE KAVYA SHREE LAXMI 31-03-2025.pdf11 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KKD-KAVYA SHREELAXMI-FORM-2.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 24.pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 19-20.pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 20-21.pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: inventory disclosure.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: KKD-DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf13 Mar 2025
Certificates of CA (Form 3)File: form 3 revised.pdf12 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 24.pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf10 Mar 2025
Declaration in FORM BFile: KAVYA SHREELAXMI-FORM-B.pdf8 Mar 2025
Certificates of CA (Form 3)File: KCD-FORM 3-30-09-2024.pdf17 Feb 2025
Certificates of CA (Form 3)File: KCD-FORM 3 31-12-2024.pdf17 Feb 2025
Certificates of CA (Form 3)File: july to sep 24 form 3 (2).pdf5 Feb 2025
Certificates of CA (Form 3)File: oct to dec 24 form 3 (2).pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf30 Dec 2024
Certificates of CA (Form 3)File: KCD-FORM-3 12 23.pdf28 Dec 2024
Certificates of CA (Form 3)File: KCD-FORM-3 03 24.pdf28 Dec 2024
Certificates of CA (Form 3)File: KCD-FORM-3 06 24.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KCD-FORM-2-31-12-2023.pdf26 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KCD-FORM-2-31-03-2024.pdf26 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KCD-FORM-2-30-06-2024.pdf26 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 06 24.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 09 24.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 24.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 31-12-23.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Kavya Shreelaxmi-inventory disclosure format.pdf22 Dec 2023
Disclosure of sold/ booked inventoryFile: KAVYA SHREELAXMI INVENTORY-31032023.pdf29 Nov 2023
Declaration in FORM BFile: FORM B AFFIDAVI CUM DECLARATION KCD.pdf24 Nov 2023
CERSAI detailsFile: KAVYA SHREELAXMI-CERSAI DECLARATION.pdf3 Nov 2023
Disclosure of sold/ booked inventoryFile: KAVYA SHREELAXMI INVENTORY.pdf3 Nov 2023
Certificates of CA (Form 3)File: 7 Certificates of CA (Form 3) (1).pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-KCD-06 23.pdf5 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-KCD-09 23.pdf5 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Kavya Shree Laxmii-06 23.pdf3 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Kavya Shree Laxmii-09 23.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form-3 KCC 2020.pdf21 Aug 2023
Certificates of CA (Form 3)File: Form-3 KCD 2021.pdf21 Aug 2023
Certificates of CA (Form 3)File: Form-3 KCD 2022.pdf21 Aug 2023
Certificates of CA (Form 3)File: Form-3 KCD 2023.pdf21 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 KCD 21-22.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 KCD 22-23.pdf18 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 20.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 21.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 22.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 KCD 03 23.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM -2A KCD 03 22.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM -2A KCD 03 23.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 12 2022.pdf10 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 03 2023.pdf10 May 2023
Certificates of CA (Form 3)File: CA form 3 09 19.pdf4 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Kavya KCD Developers 20-21.pdf5 Jan 2023
Certificates of CA (Form 5)File: KAVYA_KCD 17-18.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KAVYA_KCD 18-19.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KAVYA_KCD 19-20.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 KCD 19-20 SHREE LAXMI.pdf26 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A KCD DEVELOPER 2020.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A KCD DEVELOPER 2021.pdf28 Jul 2021
Declaration about Commencement CertificateFile: CC COVERING LETTER CHARKOP.pdf21 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf17 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A Kavya 19-20.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf14 Jul 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DISLCOSURE.pdf14 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf14 Jul 2021
Certificates of CA (Form 3)File: Updated CA Certifcate.pdf10 Oct 2018
Certificates of CA (Form 5)File: KAVYA SHREE LAXMI compressed.pdf9 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: charkop kcd architect cert.pdf11 Sep 2018
Layout approvalFile: Layout Plan.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate.pdf29 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KAVYA HILL VIEWTHANE107CompletedJan 2012Late, Mar 2012
Atlas, ThaneTHANE45CompletedMar 2011Late, May 2011
Atlantis, ThaneTHANE84CompletedMar 2010Late, Jul 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 54 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAVYA SHREE LAXMI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARKOP6,700+ in Mumbai Suburban

2 kmKAVYA SHREE LAXMICompleted 112Lapsed / revoked 69Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: KAVYA KCD DEVELOPERS

KAVYA KCD DEVELOPERS has 1 registration on MahaRERA, including KAVYA SHREE LAXMI. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that KAVYA SHREE LAXMI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KAVYA SHREE LAXMI is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAVYA SHREE LAXMI?

The registered promoter entity is KAVYA KCD DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAVYA SHREE LAXMI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAVYA SHREE LAXMI?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAVYA SHREE LAXMI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in KAVYA SHREE LAXMI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAVYA SHREE LAXMI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAVYA SHREE LAXMI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.