KAVYA KCD PRESTINE

By KAVYA KCD BUILDCON LLP

RG-MH-90418 · RERA P51800011252 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 103 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedmoved 103 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 70%
33 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

KAVYA KCD PRESTINE is a Residential / Group Housing project by KAVYA KCD BUILDCON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011252 on 31 Aug 2017. Possession is promised by 30 Sep 2028. The completion date has moved by 103 months from the original filing. 3 of the 36 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameKAVYA KCD PRESTINE
  • TypeResidential / Group Housing
  • Location
    • SAMEER CHANAVARKAR LANE
    • KANDIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011252
  • ReraGenie IDRG-MH-90418

Builder

  • NameKAVYA KCD BUILDCON LLP
  • Entity typePartnership
  • GSTIN27AAMFK6095K2ZL
  • PartnerNIMISH MANSUKHLAL VORA

Key dates

this monthRegisteredAug 2017First promiseFeb 2020Revised toSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion30 Sep 2028
  • Revised completionRevised to 30 Sep 2028 (originally 29 Feb 2020)
  • Buildings1 building record
  • Documents filed81 files

Current status

8%3 of 36 units booked
25.0%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAVYA KCD PRESTINENA121236036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

KAVYA KCD PRESTINE: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure64%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes15%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area727 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1961.82
Proposed, not sanctioned1,212 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI EAST
Estimated costRs 7.00 cr
Cost incurredRs 1.75 cr
Work done24.99%
BuildingWingEstimatedIncurred
KAVYA KCD PRESTINENARs 7.00 crRs 1.75 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH. ASHISH SOLANKI
EngineerMR. R. D. MAGDUM
EngineerRUPESH CHOWDHARY
EngineerBHAVESH PARMAR
Chartered AccountantCA PIYUSH JAIN
Chartered AccountantNEHALI DOSHI
Chartered AccountantJIMIT B SHAH CO
PartnerRole in project
KAVYA KCD BUILDCON LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009786Feb 2020 → Dec 2022

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR TILL 29TH DEC 2022

EA20062621460Feb 2020 → Sep 2028

Reason as filed by the promoterWe, [Kavya KCD Buildcon LLP], are the promoters of the real estate project known as "Kavya KCD Prestine" bearing Maha RERA Registration No. P51800011252 The delay in completion of the aforesaid project was primarily on account of internal disputes between the partners of the promoter entity, namely Kavya KCD Buildcon LLP. Owing to such disputes, the development and construction activities at the project site had come to a standstill for a considerable period, thereby impacting the project timelines and resulting in inability to adhere to the previously stipulated Maha RERA completion date. It

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Quality Assurance Certificate Kavya KCD 2025-26.pdf8 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf8 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A Certificate (1).pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 of RERA Q1 FY 25-26 April to June signed.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 of RERA Q2 FY 25-26 July to Sep signed.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 of RERA Q3 FY 25-26 October to December signed.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 of RERA Q1 FY 26-27 April to June signed.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q1 Apr 25 to June 25.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q2 July 25 to Sept 25.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q3 Oct 25 to Dec 25.pdf6 Jul 2026
Withdrawal Update Form 2File: form 2 Engineer Certificate.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q1 Apr 26 to June 26.pdf6 Jul 2026
Withdrawal Update Form 3File: form 3 CA Certificate_KCD kavya Q1 Apr 25 to June 25.pdf6 Jul 2026
Withdrawal Update Form 3File: form 3 CA Certificate_KCD kavya Q2 July 25 to Sept 25.pdf6 Jul 2026
Withdrawal Update Form 3File: form 3 CA Certificate_KCD kavya Q3 Oct 25 to Dec 25.pdf6 Jul 2026
Withdrawal Update Form 3File: form 3 Resigned CA Certificate_KCD kavya m26.pdf6 Jul 2026
Withdrawal Update Form 3File: form 3 CA Certificate_KCD kavya Q1 Apr 26 to June 26.pdf6 Jul 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf7 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KKBLLP-FORM-2-31-12-2023.pdf2 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KKBLLP-FORM-2-31-03-2024.pdf2 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KKBLLP-FORM-2-30-06-2024.pdf2 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KKBLLP-FORM-2-30-09-2024.pdf2 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KAVYA KCD BUILDCON LLP 01-04-2024.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KAVYA KCD BUILDCON LLP 30-06-2024.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KAVYA KCD BUILDCON LLP 30-09-2024.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch cert - Kavya KCD Prestine - Dec 2023.pdf29 May 2024
CERSAI detailsFile: Cersai Declaration - Kavya KCD Prestine.pdf29 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf7 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf7 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf7 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch cert - Kavya KCD Prestine - Dec 2023.pdf8 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch - Kavya KCD Prestine - Sep 2023.pdf19 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - KAVYA KCD PRESTINE - MARCH 2023.pdf24 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - KAVYA KCD PRESTINE - JUNE 2023.pdf24 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - KAVYA KCD PRESTINE - FY 2021-22.pdf24 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - KAVYA KCD PRESTINE - FY 2022-23.pdf24 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch cert KVYA.pdf21 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate form 2 (2).pdf27 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf27 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2a (5).pdf27 Sep 2021
Certificates of CA (Form 3)File: Form 3 - Shubhshanti.pdf27 Sep 2021
Declaration about Commencement CertificateFile: CC covering letter.pdf8 Jul 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18- 19.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf28 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf23 Apr 2019
Form 2AFile: FORM 2A.pdf23 Apr 2019
Certificates of CA (Form 3)File: CA Certificate.pdf23 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH COMP.pdf31 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG COMP.pdf31 Jan 2019
Certificates of CA (Form 3)File: CA COMP.pdf31 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf1 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Structural Engineer Certificate.pdf1 Nov 2018
Certificates of CA (Form 3)File: CA.pdf1 Nov 2018
Certificates of CA (Form 5)File: pristine form5.pdf29 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH COMP.pdf31 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG COMP.pdf31 Jul 2018
Certificates of CA (Form 3)File: CA COMP.pdf31 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC PRISTINE.pdf11 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form PRISTINE compressed.pdf30 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER PRISTINE.pdf30 Apr 2018
Certificates of CA (Form 3)File: CA PRISTIN compressed.pdf30 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Kavya KCD Pristine CC.pdf29 Mar 2018
Certificates of CA (Form 3)File: Shubshanti CA.pdf27 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shubshanti architect certificate Compressed.pdf26 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: shubshanti engiener certificate.pdf26 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: preastin architect.pdf27 Oct 2017
Certificates of CA (Form 3)File: preastin CA.pdf27 Oct 2017
Building plan approvalFile: kcd p iod.pdf30 Jul 2017
Layout approvalFile: kcd layoud.pdf30 Jul 2017
PAN CardFile: p pan.pdf30 Jul 2017
Copy of the legal title reportFile: p title.pdf30 Jul 2017
Details of encumbrancesFile: p encum.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: kcd layoud.pdf30 Jul 2017
Building Plan Approval (IOD)File: kcd p iod.pdf30 Jul 2017
Declaration in FORM BFile: p form b.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: p archi.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: kcd eng.pdf30 Jul 2017
Certificates of CA (Form 3)File: p ca.pdf30 Jul 2017

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 103 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAVYA KCD PRESTINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

2 kmKAVYA KCD PRESTINECompleted 127Lapsed / revoked 79Other 164Dot size: filed unitsN

Filed coordinates, straight-line distance. 370 registered projects within 2 km.

Builder: KAVYA KCD BUILDCON LLP

KAVYA KCD BUILDCON LLP has 1 registration on MahaRERA, including KAVYA KCD PRESTINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KAVYA KCD PRESTINE is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAVYA KCD PRESTINE?

The registered promoter entity is KAVYA KCD BUILDCON LLP, a partnership as per the filing. Its GSTIN 27AAMFK6095K2ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAVYA KCD PRESTINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAVYA KCD PRESTINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAVYA KCD PRESTINE?

The professionals named in the filing: Architect: ARCH. ASHISH SOLANKI; Engineer: MR. R. D. MAGDUM; Engineer: RUPESH CHOWDHARY; Engineer: BHAVESH PARMAR; Chartered Accountant: CA PIYUSH JAIN; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAVYA KCD PRESTINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAVYA KCD PRESTINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAVYA KCD PRESTINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.