ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Kavya Hills

Registered No litigation declared Others project

Kavya Hills

By B N DEVELOPERS

RG-MH-06953 · RERA P52000053543 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
150 of 209Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Kavya Hills is a Others project by B N DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000053543 on 10 Nov 2023. Possession is promised by 31 Dec 2029. 59 of the 209 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameKavya Hills
  • TypeOthers
  • Location
    • Pushpak Node
    • Dapoli-Pushpak
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053543
  • ReraGenie IDRG-MH-06953

Builder

  • NameB N DEVELOPERS
  • Entity typePartnership
  • PartnersNanji Damji Patel Chaudhari, Bharat Karman Arethia, BHARAT KANJI GOTHI
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

28%59 of 209 units booked

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and BNA7718128209

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Wing A and B: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed130

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots130
Closed/Covered60
Open Space70

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,429 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024
LandownerVillageDistrict
Smt. Ashwini Ananta TarekarUlaweRaigarh
Shri. Dnyaneshwar Mahadev TarekarUlaweRaigarh
Shri. Namdev Mahadev TarekarUlaweRaigarh
Smt. Parvatibai Anant TarekarUlaweRaigarh
Smt. Meghna Ananta TarekarUlaweRaigarh
Smt. Mamata Hemant DakiUlaweRaigarh
Shri. Rahul Ananta TarekarUlaweRaigarh
Smt. Suman Anant TarekarUlaweRaigarh
Smt. Seetabai Sakharam BhoirUlaweRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra (CIDCO)
Permissible FSI14000.0
Proposed, not sanctioned6,496 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 25 - 28, Vashi Sector-7, Navi Mumbai

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerSK Consultants & Engineers
EngineerPAWAR VITTHAL DHONDIBA
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
B N DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf9 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf9 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 FY-24-25.pdf29 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 FY 25-26.pdf29 Jun 2026
Form 1File: Form 1 - Kavya Hills as on Dec 2025.pdf27 May 2026
Form 2File: Form 2 - Kavya Hills as on 31-12-2025.pdf27 May 2026
Form 3File: Form 3 - Kavya Hills as on 30-06-2025.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Kavya Hills as on 30-09-2025.pdf27 May 2026
Form 1File: Form 1 - Kavya Hills as on Sep 2025.pdf27 May 2026
Form 2File: Form 2 - Kavya Hills as on 30-09-2025.pdf27 May 2026
Form 3File: Form 3 - Kavya Hills as on 30-09-2025.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Kavya Hills as on 30-09-2025.pdf27 May 2026
Form 1File: Form 1 - Kavya Hills as on Dec 2025.pdf27 May 2026
Form 2File: Form 2 - Kavya Hills as on 31-12-2025.pdf27 May 2026
Form 3File: Form 3 - Kavya Hills as on 31-12-2025.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Kavya Hills as on 31-12-2025.pdf27 May 2026
Form 1File: Form 1 - Kavya Hills as on March 2026.pdf27 May 2026
Form 2File: Form 2 - Kavya Hills as on 31-03-2026.pdf27 May 2026
Form 3File: Form 3 - Kavya Hills as on 31-03-2026.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Kavya Hills as on 31-03-2026.pdf27 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kavya Hills as on March 2025.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Kavya Hills for FY 2023-24.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kavya Hills Sep 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kavya Hills - 30-09-2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kavya Hills - 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kavya Hills as on Sept 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kavya Hills as on 31-12-2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kavya Hills Sep 24.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kavya Hills Sep 24.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kavya Hills as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kavya Hills - 30-06-24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kavya Hills as on March 2024.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kavya Hills as on March 2024.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kavya Hills as on December 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kavya Hills as on December 2023.pdf19 Jan 2024
Building plan approvalFile: Plan Kavya HIlls-Copy-3-5-compressed.pdf2 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Kavya HIlls-Copy-3-5-compressed.pdf2 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Kavya Hills.pdf2 Nov 2023
Other - TechnicalFile: CC Verification- Kavya Hills.pdf2 Nov 2023
Layout approvalFile: copy layout.pdf25 Oct 2023
Building plan approvalFile: copy layout.pdf25 Oct 2023
Building plan approvalFile: Plan Kavya HIlls-Copy-2-compressed_1.pdf25 Oct 2023
PAN CardFile: B n pancard.pdf25 Oct 2023
Copy of the legal title reportFile: SHORT TITLE_KAVYA HILLS_26102023_11zon.pdf25 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance- Finance.pdf25 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance- Legal.pdf25 Oct 2023
Details of encumbrances concerned to LegalFile: No Encumbrance- Finance.pdf25 Oct 2023
Details of encumbrances concerned to LegalFile: No Encumbrance- Legal.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: copy layout.pdf25 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: copy layout.pdf25 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Kavya HIlls-Copy-2-compressed_1.pdf25 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC COPY -1.pdf25 Oct 2023
Declaration about Commencement CertificateFile: Format D.pdf25 Oct 2023
Declaration in FORM BFile: Form B Promoter- Kavya Hills.pdf25 Oct 2023
CERSAI detailsFile: Cersai Declaration.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final First Form 3 - Kavya Hills.pdf25 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (27)_11zon.pdf25 Oct 2023
Proforma of Agreement for saleFile: AFS_KAVYA HILLS.pdf25 Oct 2023
Proforma of Allotment letterFile: Allotment Letter_KAVYA HILLS.pdf25 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf25 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment letter_11zon.pdf25 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS_11zon.pdf25 Oct 2023
Other - LegalFile: Declaration on Release rights of landowner.pdf25 Oct 2023
Other - LegalFile: Release Deed- Kavya Hills-1-32_11zon.pdf25 Oct 2023
Other - LegalFile: Release Deed- Kavya Hills-33-64_11zon.pdf25 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shiv EmpireP52000054607Uran Dronagiri, Raigarh20Jan 2024OngoingDec 2027Not due yet
ZENISHA RESIDENCYP52000023580Dronagiri, Raigarh30Dec 2019OngoingOct 2023Not delivered

How this compares with Raigarh

28%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kavya Hills on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dapoli-Pushpak5,900+ in Raigarh

2 kmKavya HillsCompleted 16Lapsed / revoked 17Other 115Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: B N DEVELOPERS

B N DEVELOPERS has 3 registrations on MahaRERA, including ZENISHA RESIDENCY and Kavya Hills. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Kavya Hills is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kavya Hills?

The registered promoter entity is B N DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kavya Hills?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kavya Hills?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kavya Hills?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: SK Consultants & Engineers; Engineer: PAWAR VITTHAL DHONDIBA; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kavya Hills?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kavya Hills. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kavya Hills to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.