ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Kaveri Tower

Completed No litigation declared Others project

Kaveri Tower

By Gnanesh Virendra Lakhia

RG-MH-05558 · RERA P51800051955 · Last updated on MahaRERA portal: 21 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Staircases, 95%
24 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Kaveri Tower is a Others project by Gnanesh Virendra Lakhia in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051955 on 13 Jul 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 17 of the 41 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameKaveri Tower
  • TypeOthers
  • Location
    • J P Road
    • Andheri West
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051955
  • ReraGenie IDRG-MH-05558

Builder

  • NameGnanesh Virendra Lakhia
  • Entity typeIndividual

Key dates

this monthRegisteredJul 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

41%17 of 41 units booked
89.2%Work done, per cost certificate

Figures as on 21 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kaveri TowerNA14034741

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Kaveri Tower: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 21 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area654 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2106.44
Proposed, not sanctioned2,106 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 2,3,4 Fantasy Apt, Fantasy premises Co operative society ltd, J P Road, Andheri West
Estimated costRs 14.50 cr
Cost incurredRs 12.94 cr
Work done89.21%
BuildingWingEstimatedIncurred
Kaveri TowerNARs 13.00 crRs 12.87 cr
-NARs 1.50 crRs 6.54 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAUMIL ASHWIN JHAVERI M/s H.M.Jhaveri & Sons. ASHWIN JHAVERI
EngineerMr. Abhijit V. Phatarpekar of AVP Structural Consultants
Chartered AccountantGADA & CO
Chartered AccountantTODI TULSYAN & CO
Chartered AccountantManish B Ranpariya
PartnerRole in project
Gnanesh Virendra Lakhia-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 June 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: FORM_2 June 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 June 2025 final.pdf21 Nov 2025
Occupational CertificateFile: FULL OC KAVERI TOWER.pdf21 Nov 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf11 Nov 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf11 Nov 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf10 Nov 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf10 Nov 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf10 Nov 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf10 Nov 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf10 Nov 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf10 Nov 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf10 Nov 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf10 Nov 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf10 Nov 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf31 Oct 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf31 Oct 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf29 Oct 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf29 Oct 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf29 Oct 2025
Withdrawal Update Form 1File: FORM1_September 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM2_September 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form3 September 2025.pdf17 Oct 2025
Form 5 (FY 2023-2024)File: Form 5_2024.pdf7 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_2025 (1).pdf7 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ 31_03_2024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 _31_12_2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_as on 31_12_2024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31_12_2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_as on 30_09_2024.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_Engineer' s certificate.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_as on 30_6_24_signed.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_as on 30_6_24.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_as on 30_06_2024.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ 12_04_2024.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_31_3_24.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31_03_2024.pdf9 May 2024
Commencement Certificates / NA Order for plotted developmentFile: FULL_CC_2381190_FurtherCC_signed.pdf22 Mar 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 _as on 31_12_23.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_as on 31_12_23.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31_12_2023_signed.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate for Rera 27_10_2023.PDF9 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 30_09_2023_signed.pdf6 Nov 2023
Other - LegalFile: DEED OF FAMILT AGRMT_0001.pdf3 Jul 2023
Deviation Report with respect to model copy of AgreementFile: RERA_AFS_L S Construction_FINAL_13_6_23.pdf13 Jun 2023
CERSAI detailsFile: undertaking of no cersai 01062023.pdf2 Jun 2023
Other - LegalFile: Declaration of Finacial Status 01062023.pdf2 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_ per Order 34 dt 27 July 2022_RERA Degsignate Acct.pdf1 Jun 2023
Proforma of Agreement for saleFile: AFS_L S Concstruction_RERA_28_06_2023.pdf31 May 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT 31052023.pdf31 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AFS 31052023.pdf31 May 2023
Layout approvalFile: clarification plot area.pdf12 May 2023
Details of encumbrances concerned to FinanceFile: no encumbrance.pdf12 May 2023
Details of encumbrances concerned to LegalFile: no encumbrance.pdf12 May 2023
Copy of Layout Approval (in case of layout)File: clarification plot area.pdf12 May 2023
Declaration in FORM BFile: FORM B UPDATED.pdf8 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200268112391_For_Asset_Based_Search_08_05_2023_15_21_45_838 (1).pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPDATED_compressed.pdf8 May 2023
Building plan approvalFile: AMENDED PLAN __2MB.pdf5 May 2023
Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMBRANCE OR FREE FROM ALL ENCUMBRANCES (1).pdf5 May 2023
Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCE OR FREE FROM ALL ENCUMBRANCES (1).pdf5 May 2023
Building Plan Approval / NA Order for plotted developmentFile: AMENDED PLAN __2MB.pdf5 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_rera designate account.pdf5 May 2023
Copy of the legal title reportFile: Title Report - Lakhia - For RERA.pdf2 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER - LS Constructions.pdf2 May 2023
Layout approvalFile: 2311196_IOD_signed.pdf29 Apr 2023
Copy of Layout Approval (in case of layout)File: 2311196_IOD_signed.pdf29 Apr 2023
PAN CardFile: pan card.pdf28 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 2350006_FirstCC_signed.pdf28 Apr 2023

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kaveri Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri West6,700+ in Mumbai Suburban

2 kmKaveri TowerCompleted 43Lapsed / revoked 22Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: Gnanesh Virendra Lakhia

Gnanesh Virendra Lakhia has 1 registration on MahaRERA, including Kaveri Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kaveri Tower is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kaveri Tower?

The registered promoter entity is Gnanesh Virendra Lakhia, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kaveri Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kaveri Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kaveri Tower?

The professionals named in the filing: Architect: SAUMIL ASHWIN JHAVERI M/s H.M.Jhaveri & Sons. ASHWIN JHAVERI; Engineer: Mr. Abhijit V. Phatarpekar of AVP Structural Consultants; Chartered Accountant: GADA & CO; Chartered Accountant: TODI TULSYAN & CO; Chartered Accountant: Manish B Ranpariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kaveri Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kaveri Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kaveri Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.