Registered No litigation declared Residential / Group Housing project

Kasturi Vandana Empire

By Tirupati Estate Developers LLP

RG-MH-18047 · RERA P51700077143 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 50%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Kasturi Vandana Empire is a Residential / Group Housing project by Tirupati Estate Developers LLP in Thane, Maharashtra, registered with MahaRERA as P51700077143 on 23 Jul 2024. Possession is promised by 31 Dec 2029.

At a glance

Project

  • NameKasturi Vandana Empire
  • TypeResidential / Group Housing
  • Location
    • Phatak Road
    • Narmada Nagar
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077143
  • ReraGenie IDRG-MH-18047

Builder

  • NameTirupati Estate Developers LLP
  • Entity typePartnership
  • PartnersHarish Babulal Agrawal, Rajiv Kumar Ramshankar Pathak

Key dates

this monthRegisteredJul 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
kasturi vandana empire Building No 1NA140000
Kasturi Vandana Empire Building No 2NA00000
Kasturi Vandana Empire Building No 3NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

kasturi vandana empire Building No 121%
ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Kasturi Vandana Empire Building No 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Kasturi Vandana Empire Building No 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed138

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots138
Closed/Covered50
Open Space88
BuildingClosed/CoveredOpen SpaceTotal
kasturi vandana empire Building No 1504797
Kasturi Vandana Empire Building No 201717
Kasturi Vandana Empire Building No 302424

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,260 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation (MBMC)
Permissible FSI14088.43
Proposed, not sanctioned10,536 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor, Sheetal Shopping Center, BP Road, Venkateshwar Nagar, Bhayandar East, Thane - 401105

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDN Patel & Associates
Architectar dinanath deshpande
Engineerpawan associate
EngineerPawan Mahesh Pathak
Chartered AccountantKomal K Patel & Associates
PartnerRole in project
Tirupati Estate Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form1.pdf29 May 2026
Form 2File: FORM2.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory (1).pdf29 May 2026
Form 3File: form3.pdf29 May 2026
Form 1File: Form1.pdf17 May 2026
Form 2File: Form2.pdf17 May 2026
Form 3File: form3.pdf17 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf17 May 2026
Form 1File: FORM 1.pdf30 Dec 2025
Form 3File: Form -3 .pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISSCLOSURE.pdf30 Dec 2025
Form 2File: Form2.pdf30 Dec 2025
Form 1File: Form 1 Architect Certificate (30-08-2025).pdf23 Oct 2025
Form 2File: Form - 2 Building 1, 2, 3_compressed.pdf23 Oct 2025
Form 3File: FORM 3 2025-26 QPR 1.pdf23 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold and Booked Inventory.pdf23 Oct 2025
Form 1File: form 1-1,2.pdf26 Sep 2025
Form 2File: estate developer SEPTEMBER 2024 building 2.pdf26 Sep 2025
Form 3File: Form 3 - QPR 1.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 1 - 05_10_24.pdf26 Sep 2025
Form 1File: form 1 of 1 & 2.pdf26 Sep 2025
Form 2File: form 2-1-combined.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 2 - 05_01_25.pdf26 Sep 2025
Form 1File: Form 1 - QPR.pdf26 Sep 2025
Form 2File: Form 2 Merged - QPR 3.pdf26 Sep 2025
Form 3File: Form 3 - QPR 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 3- 05_04_25.pdf26 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-1,2.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-3.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-3.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-1.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-2.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-3.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-1.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-2.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-3.pdf2 Apr 2025
Other - FinanceFile: ENCUMBRANCES.pdf25 Oct 2024
Other - FinanceFile: ENCUMBRANCES.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03.pdf7 Jul 2024
Copy of the legal title reportFile: Legal Title Report.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 bldg 01.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 bldg 03.pdf25 Jun 2024
Proforma of Agreement for saleFile: sale aggrement.pdf25 Jun 2024
Proforma of Allotment letterFile: Rera Allotment Letter.pdf25 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other realestate organization.pdf24 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organization.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, Building No 2.pdf3 Jun 2024
Other - TechnicalFile: Annexure A.pdf3 Jun 2024
Layout approvalFile: LAYOUT 2.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: LAYOUT 2.pdf18 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf18 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation in copy of aggrement.pdf18 May 2024
Declaration in FORM BFile: Form B.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 bldg1.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 bldg2.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 bldg3.pdf17 May 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment letter.pdf17 May 2024
Building plan approvalFile: Approve plan 1-2.pdf16 May 2024
Building plan approvalFile: Approve Plan 2-2.pdf16 May 2024
Building plan approvalFile: NA order.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: Detail of ecumbrance concerning finance.pdf16 May 2024
Details of encumbrances concerned to LegalFile: Detail of ecumbrance concerning finance.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approve plan 1-2.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approve Plan 2-2.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: NA order.pdf16 May 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf16 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200309242551_For_Asset_Based_Search_04_06_2024_13_30_40_251.pdf15 May 2024
Layout approvalFile: Layout Plan.pdf19 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: NA order.pdf19 Apr 2024
PAN CardFile: pancard.pdf17 Apr 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kasturi Vandana Empire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Narmada Nagar7,600+ in Thane

2 kmKasturi Vandana EmpireCompleted 52Lapsed / revoked 32Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 159 registered projects within 2 km.

Builder: Tirupati Estate Developers LLP

Tirupati Estate Developers LLP has 1 registration on MahaRERA, including Kasturi Vandana Empire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Kasturi Vandana Empire is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kasturi Vandana Empire?

The registered promoter entity is Tirupati Estate Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kasturi Vandana Empire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kasturi Vandana Empire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kasturi Vandana Empire?

The professionals named in the filing: Architect: DN Patel & Associates; Architect: ar dinanath deshpande; Engineer: pawan associate; Engineer: Pawan Mahesh Pathak; Chartered Accountant: Komal K Patel & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kasturi Vandana Empire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kasturi Vandana Empire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kasturi Vandana Empire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.