Registered No litigation declared Plotted project

KASTURI HILLS

By SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED

RG-MH-03799 · RERA P50500031145 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
0 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

KASTURI HILLS is a Plotted project by SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500031145 on 11 Oct 2021. Possession is promised by 1 Oct 2026. 79 of the 79 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKASTURI HILLS
  • TypePlotted
  • Location
    • PH NO 46
    • WAGHDARA
    • TAHSIL HINGNA
    • DISTRICT NAGPUR
    • Wagdara (536084)
    • Hingna
    • Nagpur
    • 441108
  • Pincode441108
  • RERA no.P50500031145
  • ReraGenie IDRG-MH-03799

Builder

  • NameSKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRABAB KHUZAIMA MAIMOON, RASHIDA SAIFUDDIN DAMA, TASNEEM Y BEHRAINWALA

Key dates

this monthRegisteredOct 2021PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2021
  • Promised completion1 Oct 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed93 files

Current status

100%79 of 79 units booked

Figures as on 12 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes55%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,242 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Oct 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI14483.34
Proposed, not sanctioned14,483 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAL NAGPUR 440032

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBrayan Infra &Techno Legal Services
ArchitectVISHWASH GUPTA
EngineerSAMIR SANDE
EngineerASHFAQUE HUSAIN
Chartered AccountantRanjeet Mishra
Chartered AccountantPARVEZ ALI
Chartered AccountantJayendra Chilate
PartnerRole in project
SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Jan-March26 Kasturi Hill.pdf12 May 2026
Withdrawal Update Form 2File: Form2 Jan-March26 Kasturi Hill.pdf12 May 2026
Withdrawal Update Form 3File: Form3 Jan-March2026 Kasturi Hills.pdf12 May 2026
Withdrawal Update Form 1File: form 1- kasturi hills.pdf18 Jan 2026
Withdrawal Update Form 2File: form 2- kasturi hills.pdf18 Jan 2026
Withdrawal Update Form 3File: form 3-kasturi hills.pdf18 Jan 2026
Withdrawal Update Form 1File: Form1 Kasturi Hills April-June25.pdf10 Dec 2025
Withdrawal Update Form 1File: Form1 Kasturi Hills July-Sep25.pdf10 Dec 2025
Withdrawal Update Form 2File: form 2 Kasturi Hills April-June25.pdf10 Dec 2025
Withdrawal Update Form 2File: form 2- KAsturi Hills July-SEp25.pdf10 Dec 2025
Withdrawal Update Form 3File: form 3- Kasturi Hills April-June25.pdf10 Dec 2025
Withdrawal Update Form 3File: FORM-3 Kasturi Hills July-Sep25.pdf10 Dec 2025
Form 1File: Form1 Kasturi Hills Jan-Mar25.pdf25 Nov 2025
Form 2File: Form2 Kasturi Hills Jan-March25.pdf25 Nov 2025
Form 3File: FORM 3 Kasturi Hills Jan-Mar25.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: KASTURI HILL JAN-MAR 25.pdf25 Nov 2025
Withdrawal Update Form 1File: Form1 Kasturi Hills Jan-Mar25.pdf25 Nov 2025
Withdrawal Update Form 2File: Form2 Kasturi Hills Jan-March25.pdf25 Nov 2025
Withdrawal Update Form 3File: FORM 3 Kasturi Hills Jan-Mar25.pdf25 Nov 2025
Withdrawal Update Form 1File: Form1 Kasturi Hills Jan-Mar25.pdf20 Nov 2025
Withdrawal Update Form 2File: Form2 Kasturi Hills Jan-March25.pdf20 Nov 2025
Withdrawal Update Form 3File: FORM 3 Kasturi Hills Jan-Mar25.pdf20 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2022.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-24.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2023.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2023.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2023.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-022.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-22.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-022.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-21.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JULY TO SEP.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 OCT TO DEC 24.pdf5 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A KASTURI HILLS 23-24.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 kasturi hill 23-24.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kasturi hill oct_compressed.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kasturi hill dec_compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Kasturi Hills.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold inventory Kasturi Hill.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kasturi Hills_compressed.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 dec21 (1).pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 March 22.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 june22.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 sep22.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 dec22 (1).pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 march23.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: gorm2 june23.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 sep23.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 dec23.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 march24.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory 2021.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold Inventory march22.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory june22.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory sep22.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory dec22.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory march23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory june23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory sep23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory dec23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory march24.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec2021_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march2022_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 June 22_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 sep22_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 dec22_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march23_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 june23_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 sep23_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 dec23_compressed.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march24_compressed.pdf14 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 2021-22.pdf14 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 22-23.pdf14 May 2024
Building plan approval or NA orderFile: Layout Sanction Order.pdf4 Oct 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf4 Oct 2021

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KASTURI HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHDARA, TAHSIL HINGNA, DISTRICT NAGPUR2,800+ in Nagpur

Builder: SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED

SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED has 1 registration on MahaRERA, including KASTURI HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KASTURI HILLS is delayed beyond 1 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KASTURI HILLS?

The registered promoter entity is SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KASTURI HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KASTURI HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KASTURI HILLS?

The professionals named in the filing: Architect: Brayan Infra &Techno Legal Services; Architect: VISHWASH GUPTA; Engineer: SAMIR SANDE; Engineer: ASHFAQUE HUSAIN; Chartered Accountant: Ranjeet Mishra; Chartered Accountant: PARVEZ ALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KASTURI HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KASTURI HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KASTURI HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.