Home / Browse projects / Nagpur, Maharashtra / KASTURI HILLS
KASTURI HILLS
By SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED
RG-MH-03799 · RERA P50500031145 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KASTURI HILLS is a Plotted project by SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500031145 on 11 Oct 2021. Possession is promised by 1 Oct 2026. 79 of the 79 units on this registration are recorded sold or booked.
At a glance
Project
- NameKASTURI HILLS
- TypePlotted
- Location
- PH NO 46
- WAGHDARA
- TAHSIL HINGNA
- DISTRICT NAGPUR
- Wagdara (536084)
- Hingna
- Nagpur
- 441108
- Pincode441108
- RERA no.P50500031145
- ReraGenie IDRG-MH-03799
Builder
- NameSKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED
- Entity typeCompany
- DirectorsRABAB KHUZAIMA MAIMOON, RASHIDA SAIFUDDIN DAMA, TASNEEM Y BEHRAINWALA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Oct 2021
- Promised completion1 Oct 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed93 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 85% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Brayan Infra &Techno Legal Services |
| Architect | VISHWASH GUPTA |
| Engineer | SAMIR SANDE |
| Engineer | ASHFAQUE HUSAIN |
| Chartered Accountant | Ranjeet Mishra |
| Chartered Accountant | PARVEZ ALI |
| Chartered Accountant | Jayendra Chilate |
| Partner | Role in project |
|---|---|
| SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1 Jan-March26 Kasturi Hill.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Form2 Jan-March26 Kasturi Hill.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Form3 Jan-March2026 Kasturi Hills.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: form 1- kasturi hills.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: form 2- kasturi hills.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: form 3-kasturi hills.pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Form1 Kasturi Hills April-June25.pdf | 10 Dec 2025 |
| Withdrawal Update Form 1File: Form1 Kasturi Hills July-Sep25.pdf | 10 Dec 2025 |
| Withdrawal Update Form 2File: form 2 Kasturi Hills April-June25.pdf | 10 Dec 2025 |
| Withdrawal Update Form 2File: form 2- KAsturi Hills July-SEp25.pdf | 10 Dec 2025 |
| Withdrawal Update Form 3File: form 3- Kasturi Hills April-June25.pdf | 10 Dec 2025 |
| Withdrawal Update Form 3File: FORM-3 Kasturi Hills July-Sep25.pdf | 10 Dec 2025 |
| Form 1File: Form1 Kasturi Hills Jan-Mar25.pdf | 25 Nov 2025 |
| Form 2File: Form2 Kasturi Hills Jan-March25.pdf | 25 Nov 2025 |
| Form 3File: FORM 3 Kasturi Hills Jan-Mar25.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: KASTURI HILL JAN-MAR 25.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Form1 Kasturi Hills Jan-Mar25.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Form2 Kasturi Hills Jan-March25.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 Kasturi Hills Jan-Mar25.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Form1 Kasturi Hills Jan-Mar25.pdf | 20 Nov 2025 |
| Withdrawal Update Form 2File: Form2 Kasturi Hills Jan-March25.pdf | 20 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 Kasturi Hills Jan-Mar25.pdf | 20 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2022.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2024.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2024.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-24.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2023.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2023.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2023.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-022.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-22.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-022.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-21.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JULY TO SEP.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 OCT TO DEC 24.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A KASTURI HILLS 23-24.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 kasturi hill 23-24.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kasturi hill oct_compressed.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kasturi hill dec_compressed.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Kasturi Hills.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold inventory Kasturi Hill.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Kasturi Hills_compressed.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 dec21 (1).pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 March 22.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 june22.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 sep22.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 dec22 (1).pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 march23.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: gorm2 june23.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 sep23.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 dec23.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 march24.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf | 23 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory 2021.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold Inventory march22.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory june22.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory sep22.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory dec22.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory march23.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory june23.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory sep23.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory dec23.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory march24.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec2021_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march2022_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 June 22_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 sep22_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 dec22_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march23_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 june23_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 sep23_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 dec23_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march24_compressed.pdf | 14 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 2021-22.pdf | 14 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 22-23.pdf | 14 May 2024 |
| Building plan approval or NA orderFile: Layout Sanction Order.pdf | 4 Oct 2021 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 4 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KASTURI HILLS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAGHDARA, TAHSIL HINGNA, DISTRICT NAGPUR2,800+ in Nagpur
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED
SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED has 1 registration on MahaRERA, including KASTURI HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if KASTURI HILLS is delayed beyond 1 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KASTURI HILLS?
The registered promoter entity is SKY DEVELOPERS AND PROMOTERS )INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KASTURI HILLS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KASTURI HILLS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KASTURI HILLS?
The professionals named in the filing: Architect: Brayan Infra &Techno Legal Services; Architect: VISHWASH GUPTA; Engineer: SAMIR SANDE; Engineer: ASHFAQUE HUSAIN; Chartered Accountant: Ranjeet Mishra; Chartered Accountant: PARVEZ ALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KASTURI HILLS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback