Home / Browse projects / Kolhapur, Maharashtra / Karveer Nivasini Residency

Registered No litigation declared Residential / Group Housing project

Karveer Nivasini Residency

By S R Real Estate Developers

RG-MH-10657 · RERA P53000002511 · Last updated on MahaRERA portal: 23 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
22 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 30%
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Karveer Nivasini Residency is a Residential / Group Housing project by S R Real Estate Developers in Kolhapur, Maharashtra, registered with MahaRERA as P53000002511 on 1 Aug 2017. Possession is promised by 10 Nov 2026.

At a glance

Project

  • NameKarveer Nivasini Residency
  • TypeResidential / Group Housing
  • Location
    • Off Phulewadi Ring Road
    • Satyai Nagar
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416012
  • Pincode416012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000002511
  • ReraGenie IDRG-MH-10657

Builder

  • NameS R Real Estate Developers
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Aug 2017
  • Promised completion10 Nov 2026
  • Revised completionNone
  • Buildings7 building records
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Phase 1 karveer nivasini residencyNA30000
Phase 4 Karveer Nivasini residencyNA30000
Phase 5 Karveer Nivasini residencyNA30000
Phase 6 Karveer Nivasini ResidencyNA40000
Phase 2 Karveer Nivasini residencyNA30000
Phase 3 Karveer Nivasini ResidencyNA30000
Phase 7 Karveer Nivasini ResidencyNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 23 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 30%.

Phase 1 karveer nivasini residency91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Phase 4 Karveer Nivasini residency0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 5 Karveer Nivasini residency0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 6 Karveer Nivasini Residency0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 2 Karveer Nivasini residency12%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 3 Karveer Nivasini Residency0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 7 Karveer Nivasini Residency100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes33%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes5%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes99%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered1
Open Space71
BuildingClosed/CoveredOpen SpaceTotal
Phase 1 karveer nivasini residency066
Phase 4 Karveer Nivasini residency055
Phase 5 Karveer Nivasini residency077
Phase 2 Karveer Nivasini residency066
Phase 3 Karveer Nivasini Residency055
Phase 7 Karveer Nivasini Residency14243

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5744.0
Proposed, not sanctioned4,673 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShri Balgopal Talim Mandal Building, Near Khasbag Maidan, Kolhapur 416012

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Vishwasrao Ggatge
EngineerPrashant subhash hadkar
PartnerRole in project
S R Real Estate Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Feb 2025

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2023.pdf23 Feb 2025
Certificates of CA (Form 3)File: DEC 2020.pdf23 Feb 2025
Certificates of CA (Form 3)File: 31-03-2024.pdf23 Feb 2025
Certificates of CA (Form 3)File: 30-09-2023.pdf23 Feb 2025
Certificates of CA (Form 3)File: 30-06-2023.pdf23 Feb 2025
Certificates of CA (Form 3)File: 31-03-2023.pdf23 Feb 2025
Certificates of CA (Form 3)File: 31-03-2023.pdf23 Feb 2025
Certificates of CA (Form 3)File: 31-12-2022.pdf23 Feb 2025
Certificates of CA (Form 3)File: 30-09-2022.pdf23 Feb 2025
Certificates of CA (Form 3)File: 30-06-2022.pdf23 Feb 2025
Certificates of CA (Form 3)File: 30-06-2022.pdf23 Feb 2025
Certificates of CA (Form 3)File: 31-03-2022.pdf23 Feb 2025
Certificates of CA (Form 3)File: 31-12-2021.pdf23 Feb 2025
Certificates of CA (Form 3)File: 30-09-2021.pdf23 Feb 2025
Certificates of CA (Form 3)File: JUNE 21.pdf23 Feb 2025
Certificates of CA (Form 3)File: sep 20.pdf23 Feb 2025
Certificates of CA (Form 3)File: March 21.pdf23 Feb 2025
Certificates of CA (Form 3)File: SEP 2017.pdf23 Feb 2025
Certificates of CA (Form 3)File: DEC 2017.pdf23 Feb 2025
Certificates of CA (Form 3)File: March 18.pdf23 Feb 2025
Certificates of CA (Form 3)File: JUNE 2018.pdf23 Feb 2025
Certificates of CA (Form 3)File: SEP 2018.pdf23 Feb 2025
Certificates of CA (Form 3)File: DEC 18.pdf23 Feb 2025
Certificates of CA (Form 3)File: Dec 2019_.pdf23 Feb 2025
Certificates of CA (Form 3)File: June 2019.pdf23 Feb 2025
Certificates of CA (Form 3)File: Sep 2019.pdf23 Feb 2025
Certificates of CA (Form 3)File: Dec 2019_.pdf23 Feb 2025
Certificates of CA (Form 3)File: MARCH 2020.pdf23 Feb 2025
Certificates of CA (Form 3)File: June 2020.pdf23 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2023.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2017.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2023.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2023.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2023.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2022.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2022 (1).pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2022.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2022.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2021.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2021.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2018.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MARCH 2018.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2021.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2017.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2018.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2018.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MARCH 2019.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2019.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2019.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2021.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2020.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2020.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2020.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2019.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2020.pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA March 2019.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA March 2019.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA Dec 2018.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA Sep 2018.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA June 2018.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA March 18.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA Dec 2017.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07-RERA Sep 2017.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 07-RERA June 2019.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 07-RERA March 2020.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 07-RERA Sep 2019.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 07-RERA Dec 2019.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 07-RERA June 2020.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 07-RERA Sep 2020.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 07-RERA Dec 2020.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 07-RERA March 2021.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 07-RERA Dec 2021.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 07-RERA March 2022.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 07-RERA Sep 2021.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 07-RERA June 2021.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 07-RERA June 2022.pdf15 Feb 2025

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Karveer Nivasini Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satyai Nagar880+ in Kolhapur

2 kmKarveer Nivasini ResidenCompleted 28Lapsed / revoked 17Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: S R Real Estate Developers

S R Real Estate Developers has 2 registrations on MahaRERA, including Karveer Nivasini Complex and Karveer Nivasini Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Karveer Nivasini Residency is delayed beyond 10 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Karveer Nivasini Residency?

The registered promoter entity is S R Real Estate Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Karveer Nivasini Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Karveer Nivasini Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Karveer Nivasini Residency?

The professionals named in the filing: Architect: Anil Vishwasrao Ggatge; Engineer: Prashant subhash hadkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Karveer Nivasini Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Karveer Nivasini Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Karveer Nivasini Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.