Home / Browse projects / Nagpur, Maharashtra / GULMOHAR GREENS
GULMOHAR GREENS
By BHARMAL BUILDERS & DEVELOPERS
RG-MH-03618 · RERA P50500028868 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GULMOHAR GREENS is a Residential / Group Housing project by BHARMAL BUILDERS & DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500028868 on 5 Apr 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 132 of the 160 units on this registration are recorded sold or booked, and 46 of 55 construction stages are filed complete.
At a glance
Project
- NameGULMOHAR GREENS
- TypeResidential / Group Housing
- Location
- GRAM PANCHAYAT ROAD
- BHILGAON
- Kamptee
- Nagpur
- 440026
- Pincode440026
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500028868
- ReraGenie IDRG-MH-03618
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Apr 2021
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings5 building records
- Documents filed91 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 27 | 8 | 32 | 0 | 32 |
| WING B | NA | 27 | 8 | 32 | 0 | 32 |
| WING C | NA | 27 | 8 | 32 | 0 | 32 |
| WING D | NA | 27 | 8 | 32 | 0 | 32 |
| WING E | NA | 27 | 8 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
46 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 90%.
WING A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
WING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 80% |
Parking filed186
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 9 | 28 | 37 |
| WING B | 9 | 28 | 37 |
| WING C | 9 | 28 | 37 |
| WING D | 9 | 28 | 37 |
| WING E | 9 | 29 | 38 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 100 | Rs 10 |
| WING B | NA | Rs 100 | Rs 10 |
| WING C | NA | Rs 100 | Rs 10 |
| WING D | NA | Rs 100 | Rs 10 |
| WING E | NA | Rs 100 | Rs 10 |
| - | NA | Rs 100 | Rs 10 |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ALOK LUNIA |
| Engineer | Ashfaque Husain |
| Chartered Accountant | NOORUDDIN HUSAIN |
| Partner | Role in project |
|---|---|
| BHARMAL BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2021-2022)File: Form 2A.pdf | 15 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A gulmohar greens.pdf | 15 Jun 2026 |
| Form 2A (FY 2022-2023)File: Form 2A (1).pdf | 15 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A (2).pdf | 15 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A (3).pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 21 May 2026 |
| Withdrawal Update Form 2 | 21 May 2026 |
| Withdrawal Update Form 3File: rera compressed.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 7 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 7 Apr 2026 |
| Withdrawal Update Form 2 | 7 Apr 2026 |
| Withdrawal Update Form 2 | 7 Apr 2026 |
| Withdrawal Update Form 3File: rera compressed.pdf | 7 Apr 2026 |
| Withdrawal Update Form 3File: rera compressed.pdf | 7 Apr 2026 |
| Withdrawal Update Form 1 | 12 Feb 2026 |
| Withdrawal Update Form 2 | 12 Feb 2026 |
| Withdrawal Update Form 3File: rera compressed.pdf | 12 Feb 2026 |
| Form 1File: form 1 quater 1 2024.pdf | 10 Sep 2025 |
| Form 2File: FORM 2 APR-JUN 2024.pdf | 10 Sep 2025 |
| Form 3File: form 3 apr-jun 2024_compressed (1).pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 24.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Jul-Sep 24.pdf | 10 Sep 2025 |
| Form 1File: Form1 quater 2 2024.pdf | 10 Sep 2025 |
| Form 2File: FORM 2 JUL-SEP 2024.pdf | 10 Sep 2025 |
| Form 3File: form 3 Jul-Sep 2024_compressed (3).pdf | 10 Sep 2025 |
| Form 1File: Form1 quarter 3 2024.pdf | 10 Sep 2025 |
| Form 2File: FORM 2 OCT-DEC 2024.pdf | 10 Sep 2025 |
| Form 3File: form 3 Oct-Dec 2024_compressed (4).pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct-Dec 24.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Jan-March 25.pdf | 10 Sep 2025 |
| Form 2File: FORM 2 JAN-MAR 2025.pdf | 10 Sep 2025 |
| Form 3File: form 3 Jan-march 2025_compressed (2).pdf | 10 Sep 2025 |
| Form 1File: form 1 quarter 4 2025.pdf | 10 Sep 2025 |
| Form 1File: form 1 quarter 4 2023.pdf | 9 Sep 2025 |
| Form 2File: form 2 jan-mar 2023.pdf | 9 Sep 2025 |
| Form 3File: form 3 jan-mar 2023_compressed.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Jan -March 2023.pdf | 9 Sep 2025 |
| Form 1File: form 1 quarter 1 2023.pdf | 9 Sep 2025 |
| Form 2File: FORM 2 APR-JUN 2023.pdf | 9 Sep 2025 |
| Form 3File: form 3 apr-jun 2023_compressed.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 23.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Jul-Sep 23.pdf | 9 Sep 2025 |
| Form 1File: form 1 quarter2 2023.pdf | 9 Sep 2025 |
| Form 2File: FORM 2 JUL-SEP 2023.pdf | 9 Sep 2025 |
| Form 3File: form 3 jul-sep 2023_compressed.pdf | 9 Sep 2025 |
| Form 3File: form 3 oct-dec 2023_compressed.pdf | 9 Sep 2025 |
| Form 1File: form 1 quater 3 2023.pdf | 9 Sep 2025 |
| Form 2File: FORM 2 OCT-DEC 2023.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct - Dec 23.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Jan-March 24.pdf | 9 Sep 2025 |
| Form 1File: form 3 jan-mar 2024_compressed.pdf | 9 Sep 2025 |
| Form 2File: FORM 2 JAN-MAR 2024.pdf | 9 Sep 2025 |
| Form 3File: form 3 jan-mar 2024_compressed.pdf | 9 Sep 2025 |
| Form 1File: form 1 quater1 2022.pdf | 8 Sep 2025 |
| Form 2File: FORM2 APR-JUN 2022.pdf | 8 Sep 2025 |
| Form 3File: FORM 3 Apr- Jun 2022_compressed (2).pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 2022.pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: July - Sep 22.pdf | 8 Sep 2025 |
| Form 2File: FORM 2 JUL-SEP 2022.pdf | 8 Sep 2025 |
| Form 3File: FORM 3 Jul-Sep 2022_compressed (4).pdf | 8 Sep 2025 |
| Form 1File: form-1 quater-2 2022.pdf | 8 Sep 2025 |
| Form 1File: FORM1 quarter 3 2022.pdf | 8 Sep 2025 |
| Form 2File: FORM 2 OCT-DEC 2022.pdf | 8 Sep 2025 |
| Form 3File: FORM 3 OCT-DEC 2022_compressed (1).pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct - Dec 22.pdf | 8 Sep 2025 |
| Form 1File: Form 1 qaurter 1 2021.pdf | 4 Sep 2025 |
| Form 2File: FORM2 APR-JUN 2021.pdf | 4 Sep 2025 |
| Form 3File: FORM 3 APR-JUN 2021_compressed.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 2021.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: July - Sep 21.pdf | 4 Sep 2025 |
| Form 1File: form1 quater-2 2021.pdf | 4 Sep 2025 |
| Form 2File: FORM 2 JUL-SEP 2021.pdf | 4 Sep 2025 |
| Form 3File: FORM 3 JUL-SEP 2021_compressed.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct - Dec 21.pdf | 4 Sep 2025 |
| Form 1File: form 2 quarter-3 2021.pdf | 4 Sep 2025 |
| Form 2File: FORM 2 OCT-DEC 2021.pdf | 4 Sep 2025 |
| Form 3File: FORM 3 OCT-DEC 2021_compressed.pdf | 4 Sep 2025 |
| Form 3File: FORM 3 JAN-MAR 2022_compressed.pdf | 4 Sep 2025 |
| Form 1File: form 1 quarter 4 2022.pdf | 4 Sep 2025 |
| Form 2File: FORM 2 JAN-MAR 2022.pdf | 4 Sep 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GULMOHAR GREENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHILGAON2,800+ in Nagpur
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Swapnapurtee - A Project by NMC
SANDEEP DWELLERS PVT. LTD.
KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE
KARAN KOTHARI BUSINESS PARK PRIVATE LIMITE
HBA PARK PHASE-I
HBA CONSTRUCTION COMPANY PVT.LTD
OAK SHANTINIKETAN
OAK Constructions
RAI CREST
RAI UDYOG UNITY MEDISCIENCE PRIVATE LIMITE
BHIL CITY 3
MOHAN BAPURAO MAKDE
See every Nagpur project, with the district possession charts
Builder: BHARMAL BUILDERS & DEVELOPERS
BHARMAL BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including GULMOHAR PLAZA and GULMOHAR GREENS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that GULMOHAR GREENS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GULMOHAR GREENS is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GULMOHAR GREENS?
The registered promoter entity is BHARMAL BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GULMOHAR GREENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GULMOHAR GREENS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GULMOHAR GREENS?
The professionals named in the filing: Architect: ALOK LUNIA; Engineer: Ashfaque Husain; Chartered Accountant: NOORUDDIN HUSAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GULMOHAR GREENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback