ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / KAMTAM ICON WING B

Completed No litigation declared Residential / Group Housing project

KAMTAM ICON WING B

By VISHWA DEVELOPERS

RG-MH-98445 · RERA P52600053917 · Last updated on MahaRERA portal: 24 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

KAMTAM ICON WING B is a Residential / Group Housing project by VISHWA DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600053917 on 11 Dec 2023. The registration is recorded completed; possession was promised by 31 Mar 2027.

At a glance

Project

  • NameKAMTAM ICON WING B
  • TypeResidential / Group Housing
  • Location
    • AKKALKOT ROAD
    • VENKATESHNAGAR KASBE SOLAPUR NORTH
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413006
  • Pincode413006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600053917
  • ReraGenie IDRG-MH-98445

Builder

  • NameVISHWA DEVELOPERS
  • Entity typePartnership
  • PartnersBALAJI UDDHAV LANDAGE, BALASAHEB GURUDAS BARASKAR, RAMAKANT BHIMRAO GAMBHIRE, NOORMOHAMMED IBRAHIM SHAIKH, AMOL CHANDRAKANT MANE
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2023PromisedMar 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Dec 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAMTAM ICON WING B AT S NO 154/2/3 AT KASBE SOLAPURNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KAMTAM ICON WING B AT S NO 154/2/3 AT KASBE SOLAPUR: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Open Space48

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,331 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PRAKASH SHANKARRAO KAMTAMSolapur (M Corp.)Solapur

Approvals and building plan

Permissible FSI1697.89
Proposed, not sanctioned1,698 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch560/59 SHARAD CHAMBERS SOUTH SADAR BAZAR SOLAPUR 413003

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISHWAMBHAR B MAMDAYAL
EngineerMUKTAJI GAMBHIRE
EngineerSHARAD V KADAD
Chartered AccountantCA ABHIJIT KHADE AND ASSOCIATES
Chartered AccountantPGMJ AND ASSOCIATES
PartnerRole in project
VISHWA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Apr 2025

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: KAMTAM ICON WING B SOCIETY REG.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final 7th Architect Certificate Form 1 upload.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final 7th Form 3 CA Signed upload 180325.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2 Engineer Certificate.pdf20 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Full Project Completion Certificate SMC 180324.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory as on 18th March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6th Architect Form 1 (Oct-Dec-24) Signed.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6TH FORM 3 CA OCT TO DEC 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Both Signed.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct to Dec 23.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5th ARCHITECT CERTIFICATE FORM 1 Jul to Sep 24.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3rd CA CERTIFICATE FORM 3 Apr to Jun 24.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5th CA CERTIFICATE FORM 3 Jul 24 to 30 Sep 24.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5th ENGINEER CERTIFICATE FORM 2 Jul to Sep 24.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory as on 30th June 24.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory as on 30th Sep 24.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1 APR-JUN 24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 APR-JUN 24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2ND FORM 3 CA CERTIFICATE.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3RD FORM 3 CA CERTIFICATE.pdf17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd Architect Certificate FORM 1.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2nd Engineer Certificate FORM 2.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate FORM 2A FY 23-24.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: DETAILS OF SOLD UNSOLD INVENTORY.pdf1 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd Architect Certificate FORM 1.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ENGINEER CERTIFICATE.pdf20 Apr 2024
Other - TechnicalFile: LAYOUT SITE PLAN _ WITH marked bldg name.pdf8 Dec 2023
Other - TechnicalFile: Letter to Maharera regarding Area Specify.pdf30 Oct 2023
Other - TechnicalFile: Correction Letter from SMC to maharera.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3 CA CERTIFICATE VISHWA DEV.pdf19 Oct 2023
Layout approvalFile: LAYOUT SITE PLAN (1).pdf18 Oct 2023
Building plan approvalFile: BUILDING PLAN.pdf18 Oct 2023
Building plan approvalFile: BUILDING PLAN (SECTION).pdf18 Oct 2023
PAN CardFile: VISHWA NEW PAN.pdf18 Oct 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT KAMTAM ICON.pdf18 Oct 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE RELATED TO FINANCE AND LEGAL.pdf18 Oct 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE RELATED TO FINANCE AND LEGAL.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: LAYOUT SITE PLAN (1).pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN (SECTION).pdf18 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Oct 2023
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf18 Oct 2023
Declaration in FORM BFile: Declaration Form B PROMOTERS.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and booked inventory.pdf18 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_S NO 154 KAMTAM ICON SOLAPUR.pdf18 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Shaikh.pdf18 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_amol mane.pdf18 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_gambhire.pdf18 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_landge.pdf18 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_baraskar.pdf18 Oct 2023
Proforma of Agreement for saleFile: PROFORMA Agreement to Sale Draft Maharera Vishwa Dev.pdf18 Oct 2023
Proforma of Allotment letterFile: PROFORMA DRAFT Allotment Letter.pdf18 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account.pdf18 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation_allotment letter.pdf18 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation_agreement to sale.pdf18 Oct 2023

How this compares with Solapur

15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep KAMTAM ICON WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VENKATESHNAGAR KASBE SOLAPUR NORTH550+ in Solapur

2 kmKAMTAM ICON WING BCompleted 10Lapsed / revoked 4Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: VISHWA DEVELOPERS

Vishwa Developers has 7 registrations on MahaRERA, including MATRIX COMPLEX and SWAMI KRUPA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if KAMTAM ICON WING B is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAMTAM ICON WING B?

The registered promoter entity is VISHWA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAMTAM ICON WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAMTAM ICON WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAMTAM ICON WING B?

The professionals named in the filing: Architect: VISHWAMBHAR B MAMDAYAL; Engineer: MUKTAJI GAMBHIRE; Engineer: SHARAD V KADAD; Chartered Accountant: CA ABHIJIT KHADE AND ASSOCIATES; Chartered Accountant: PGMJ AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAMTAM ICON WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAMTAM ICON WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAMTAM ICON WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.