Home / Browse projects / Solapur, Maharashtra / KAMTAM ICON WING B
KAMTAM ICON WING B
RG-MH-98445 · RERA P52600053917 · Last updated on MahaRERA portal: 24 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KAMTAM ICON WING B is a Residential / Group Housing project by VISHWA DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600053917 on 11 Dec 2023. The registration is recorded completed; possession was promised by 31 Mar 2027.
At a glance
Project
- NameKAMTAM ICON WING B
- TypeResidential / Group Housing
- Location
- AKKALKOT ROAD
- VENKATESHNAGAR KASBE SOLAPUR NORTH
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413006
- Pincode413006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600053917
- ReraGenie IDRG-MH-98445
Builder
- NameVISHWA DEVELOPERS
- Entity typePartnership
- PartnersBALAJI UDDHAV LANDAGE, BALASAHEB GURUDAS BARASKAR, RAMAKANT BHIMRAO GAMBHIRE, NOORMOHAMMED IBRAHIM SHAIKH, AMOL CHANDRAKANT MANE
- Other registrations6 more →
- Completed4 of 7
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Dec 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KAMTAM ICON WING B AT S NO 154/2/3 AT KASBE SOLAPUR | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
KAMTAM ICON WING B AT S NO 154/2/3 AT KASBE SOLAPUR: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRAKASH SHANKARRAO KAMTAM | Solapur (M Corp.) | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VISHWAMBHAR B MAMDAYAL |
| Engineer | MUKTAJI GAMBHIRE |
| Engineer | SHARAD V KADAD |
| Chartered Accountant | CA ABHIJIT KHADE AND ASSOCIATES |
| Chartered Accountant | PGMJ AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| VISHWA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Apr 2025
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: KAMTAM ICON WING B SOCIETY REG.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final 7th Architect Certificate Form 1 upload.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final 7th Form 3 CA Signed upload 180325.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2 Engineer Certificate.pdf | 20 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Full Project Completion Certificate SMC 180324.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory as on 18th March 2025.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6th Architect Form 1 (Oct-Dec-24) Signed.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6TH FORM 3 CA OCT TO DEC 24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Both Signed.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct to Dec 23.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5th ARCHITECT CERTIFICATE FORM 1 Jul to Sep 24.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3rd CA CERTIFICATE FORM 3 Apr to Jun 24.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5th CA CERTIFICATE FORM 3 Jul 24 to 30 Sep 24.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5th ENGINEER CERTIFICATE FORM 2 Jul to Sep 24.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory as on 30th June 24.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory as on 30th Sep 24.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1 APR-JUN 24.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 APR-JUN 24.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2ND FORM 3 CA CERTIFICATE.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3RD FORM 3 CA CERTIFICATE.pdf | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd Architect Certificate FORM 1.pdf | 1 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2nd Engineer Certificate FORM 2.pdf | 1 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate FORM 2A FY 23-24.pdf | 1 May 2024 |
| Disclosure of sold/ booked inventoryFile: DETAILS OF SOLD UNSOLD INVENTORY.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd Architect Certificate FORM 1.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ENGINEER CERTIFICATE.pdf | 20 Apr 2024 |
| Other - TechnicalFile: LAYOUT SITE PLAN _ WITH marked bldg name.pdf | 8 Dec 2023 |
| Other - TechnicalFile: Letter to Maharera regarding Area Specify.pdf | 30 Oct 2023 |
| Other - TechnicalFile: Correction Letter from SMC to maharera.pdf | 30 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3 CA CERTIFICATE VISHWA DEV.pdf | 19 Oct 2023 |
| Layout approvalFile: LAYOUT SITE PLAN (1).pdf | 18 Oct 2023 |
| Building plan approvalFile: BUILDING PLAN.pdf | 18 Oct 2023 |
| Building plan approvalFile: BUILDING PLAN (SECTION).pdf | 18 Oct 2023 |
| PAN CardFile: VISHWA NEW PAN.pdf | 18 Oct 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT KAMTAM ICON.pdf | 18 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE RELATED TO FINANCE AND LEGAL.pdf | 18 Oct 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE RELATED TO FINANCE AND LEGAL.pdf | 18 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT SITE PLAN (1).pdf | 18 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 18 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN (SECTION).pdf | 18 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 18 Oct 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 18 Oct 2023 |
| Declaration in FORM BFile: Declaration Form B PROMOTERS.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and booked inventory.pdf | 18 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_S NO 154 KAMTAM ICON SOLAPUR.pdf | 18 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Shaikh.pdf | 18 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_amol mane.pdf | 18 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_gambhire.pdf | 18 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_landge.pdf | 18 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_baraskar.pdf | 18 Oct 2023 |
| Proforma of Agreement for saleFile: PROFORMA Agreement to Sale Draft Maharera Vishwa Dev.pdf | 18 Oct 2023 |
| Proforma of Allotment letterFile: PROFORMA DRAFT Allotment Letter.pdf | 18 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account.pdf | 18 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation_allotment letter.pdf | 18 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation_agreement to sale.pdf | 18 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
Keep KAMTAM ICON WING B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VENKATESHNAGAR KASBE SOLAPUR NORTH550+ in Solapur
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
Shhraddha Emrald
Shhraddha Buildcons
Mahanandi Heights
Sneharika Vijayshree Developers
HMEMPIRE210211
HERIYTAGE MANIYDHARI EMPIRE
BRAMHA GALAXY
BRAMHA BUILDCON
Shree Vasundhara Heights
Kishor Rajendra Sanjekar
Panchganga Bramhaputra Heights
HANMANTU KOMARAYYA BURA
See every Solapur project, with the district possession charts
Builder: VISHWA DEVELOPERS
Vishwa Developers has 7 registrations on MahaRERA, including MATRIX COMPLEX and SWAMI KRUPA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if KAMTAM ICON WING B is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KAMTAM ICON WING B?
The registered promoter entity is VISHWA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KAMTAM ICON WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KAMTAM ICON WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KAMTAM ICON WING B?
The professionals named in the filing: Architect: VISHWAMBHAR B MAMDAYAL; Engineer: MUKTAJI GAMBHIRE; Engineer: SHARAD V KADAD; Chartered Accountant: CA ABHIJIT KHADE AND ASSOCIATES; Chartered Accountant: PGMJ AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KAMTAM ICON WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback