Home / Browse projects / Mumbai Suburban, Maharashtra / Kamla Borivli Rajesh
Kamla Borivli Rajesh
By KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED
RG-MH-48476 · RERA P51800049969 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kamla Borivli Rajesh is a Others project by KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049969 on 6 Mar 2023. Possession is promised by 31 Mar 2027. 13 of the 86 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameKamla Borivli Rajesh
- TypeOthers
- Location
- EKSAR ROAD
- BORIVALI WEST
- Eksar
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- RERA no.P51800049969
- ReraGenie IDRG-MH-48476
Builder
- NameKAMLA HOMES AND LIFESTYLES PRIVATE LIMITED
- Entity typeCompany
- DirectorsDWARKESH SHETH, AJAYPAL RAWAL
- Other registrations3 more →
- Completed2 of 4
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Mar 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kamla Borivli Rajesh | NA | 21 | 17 | 66 | 20 | 86 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.
Kamla Borivli Rajesh: 95% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 93% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed294
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BORIVALI RAJESH CHS LTD | Eksar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kamla Borivli Rajesh | NA | Rs 47.80 cr | Rs 47.64 cr |
| - | NA | Rs 47.80 cr | Rs 47.64 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rasik P. Hingoo Associates |
| Architect | D4 Architects |
| Engineer | Paras Consultants |
| Engineer | Kirti gosalia |
| Chartered Accountant | N G JAIN AND CO |
| Chartered Accountant | shantilal jain |
| Partner | Role in project |
|---|---|
| KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Nov 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Rajesh.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Rajesh.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 KAMLA BORIVALI RAJESH.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: Rajesh - Form 1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Rajesh - Form 2.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: KAMLA BORIVALI RAJESH FORM 3.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Borivali Rajesh.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Rajesh.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 - KAMLA BORIVALI RAJESH.pdf | 15 Jan 2026 |
| Layout approvalFile: Amended full Plan-Rajesh_1-3.pdf | 27 Nov 2025 |
| Layout approvalFile: Amended full Plan-Rajesh_4-6.pdf | 27 Nov 2025 |
| Layout approvalFile: Amended full Plan-Rajesh_7-end.pdf | 27 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Rajesh.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Rajesh.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: BORIVALI RAJESH.pdf | 6 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Rajesh (1).pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rajesh.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Rajesh.pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rajesh.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Rajesh.pdf | 7 Jan 2025 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_1-1.pdf | 23 Nov 2024 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_2-3.pdf | 23 Nov 2024 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_4-4.pdf | 23 Nov 2024 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_5-5.pdf | 23 Nov 2024 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_6-6.pdf | 23 Nov 2024 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_7-7.pdf | 23 Nov 2024 |
| Layout approvalFile: Amended approved plan 22-05-2024-Rajesh_8-end.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_1-1.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_2-3.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_4-4.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_5-5.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_6-6.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_7-7.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Amended approved plan 22-05-2024-Rajesh_8-end.pdf | 23 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC till 19th floor-Rajesh.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rajesh.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KAMLA BORIVALI RAJESH Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Rajesh.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAJESH form 3.pdf | 13 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RAJESH.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rajesh Form 1.pdf | 8 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rajesh -Form 2.pdf | 8 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - RAJESH.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Rajesh.pdf | 11 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1- Rajesh.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RAJESH.pdf | 10 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Borivli Rajesh.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 RAJESH.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 -BORIVALI RAJESH.pdf | 11 Oct 2023 |
| Layout approvalFile: Amended plan dt18-07-2023-Borivli rajesh_1-1.pdf | 30 Aug 2023 |
| Layout approvalFile: Amended plan dt18-07-2023-Borivli rajesh_2-3.pdf | 30 Aug 2023 |
| Layout approvalFile: Amended plan dt18-07-2023-Borivli rajesh_4-end.pdf | 30 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Amended plan dt18-07-2023-Borivli rajesh_1-1.pdf | 30 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Amended plan dt18-07-2023-Borivli rajesh_2-3.pdf | 30 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Amended plan dt18-07-2023-Borivli rajesh_4-end.pdf | 30 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC till 8th floor- Borivli Rajesh.pdf | 30 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- RAJESH.pdf | 15 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - RAJESH.pdf | 15 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1- Borivli Rajesh.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Borivli Rajesh.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-BORIVALI RAJESH.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Borivli Rajesh.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Borivli Rajesh.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RAJESH.pdf | 18 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC- Borivli Rajesh.pdf | 17 Feb 2023 |
| Declaration about Commencement CertificateFile: CC DECLARATION.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance declaration.pdf | 4 Feb 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance declaration.pdf | 4 Feb 2023 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 4 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A disclosure.pdf | 4 Feb 2023 |
| Building plan approvalFile: IOD-Rajesh.pdf | 3 Feb 2023 |
| Layout approvalFile: Zero FSI IOD plan-Rajesh.pdf | 3 Feb 2023 |
| PAN CardFile: Company pan card.pdf | 3 Feb 2023 |
| Copy of the legal title reportFile: Legal Title Report-Borivli Rajesh.pdf | 3 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Zero FSI IOD plan-Rajesh.pdf | 3 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD-Rajesh.pdf | 3 Feb 2023 |
| Declaration in FORM BFile: Form-B.pdf | 3 Feb 2023 |
| Proforma of Agreement for saleFile: Revised Draft of Agreement for Sale for RERA.pdf | 3 Feb 2023 |
| Proforma of Allotment letterFile: REVISED ALLOTMENT LETTER.pdf | 3 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kamla Borivli Rajesh on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI WEST6,700+ in Mumbai Suburban
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED
KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED has 4 registrations on MahaRERA, including KAMLA VALEON and KAMLA AIRBUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Kamla Borivli Rajesh is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kamla Borivli Rajesh?
The registered promoter entity is KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kamla Borivli Rajesh?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kamla Borivli Rajesh?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kamla Borivli Rajesh?
The professionals named in the filing: Architect: Rasik P. Hingoo Associates; Architect: D4 Architects; Engineer: Paras Consultants; Engineer: Kirti gosalia; Chartered Accountant: N G JAIN AND CO; Chartered Accountant: shantilal jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kamla Borivli Rajesh?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback