ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Kalpavruksha A

Registered Litigation declared Residential / Group Housing project

Kalpavruksha A

By Vaichal Constructions Pvt Ltd

RG-MH-18792 · RERA P52100077603 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 20%
62 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 185 documents Report an error

Kalpavruksha A is a Residential / Group Housing project by Vaichal Constructions Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100077603 on 15 Oct 2024. Possession is promised by 31 Dec 2027. 0 of the 62 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKalpavruksha A
  • TypeResidential / Group Housing
  • Location
    • Gat No 577 P
    • -
    • Kasar Amboli
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100077603
  • ReraGenie IDRG-MH-18792

Builder

  • NameVaichal Constructions Pvt Ltd
  • Entity typeCompany
  • Managing DirectorsSanjay Vasant Vaichal, Sanjay Vasant Vaichal
  • DirectorsShantanu Sanjay Vaichal, Shantanu Sanjay Vaichal
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed185 files

Current status

0%0 of 62 units booked

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kalpavruksha ANA8862062

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 20%.

Kalpavruksha A: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,080 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI2843.7
Proposed, not sanctioned2,844 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1732, SADASHIV PETH,OPP. PARIJAT DEPARTMENTAL STORE,TILAK ROAD, PUNE - 411030,E-MAIL : [email protected]

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish D. Satbhai
EngineerDhananjay Utpat
Chartered AccountantDevendra Darekar
Chartered AccountantJ D Thorat
PartnerRole in project
Vaichal Constructions Pvt Ltd-

Litigation declared1

CaseCourtStatus
1426/2012Addl Small Causes Court and Jt CJSD PunePending for Defense Evidence

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed185

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 185 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: architect certificate-Vaichal.pdf9 May 2026
Form 2File: Form 2.pdf9 May 2026
Form 3File: Form 3.pdf9 May 2026
Disclosure of Sold and Booked InventoryFile: sold Unsold.pdf9 May 2026
Form 1File: FORM 1.pdf12 Feb 2026
Form 2File: FORM 2.pdf12 Feb 2026
Form 3File: FORM 3.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Ssold unsold.pdf12 Feb 2026
Form 1File: RERA NO P52100077603 30 JUN 2025.pdf18 Oct 2025
Form 2File: ENG CERTIFICATE 14072025.pdf18 Oct 2025
Form 3File: RERA FORM 3 1 April 25 to 30 June 25.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE INFO 30 06 2025.pdf18 Oct 2025
Form 1File: RERA P52100077603 30 SEP 2025.pdf18 Oct 2025
Form 2File: ENG CERTIFICATE 15102025.pdf18 Oct 2025
Form 3File: Rera certificate A bldg.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE INFO 30 09 2025.pdf18 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QPR Form 1 March 2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KV FORM 3 QTR4.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QPR Form 2 Engineer Certificate March 2025.pdf15 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: QPR Disclosure of Sold Unsold Inventory March 2025.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORMATIONS KALPAVRUKSHA.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: D S DAREKAR 25 01 2025_compressed.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FOR MAHARERA_compressed.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD INVENTORY.pdf25 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC verification.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC verification.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC verification.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC verification.pdf9 Oct 2024
Building plan approvalFile: Plan2_11zon.pdf6 Oct 2024
Building plan approvalFile: Plan2_11zon.pdf6 Oct 2024
Building plan approvalFile: Plan2_11zon.pdf6 Oct 2024
Building plan approvalFile: Plan2_11zon.pdf6 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan2_11zon.pdf6 Oct 2024
Other - LegalFile: CC verification.pdf6 Oct 2024
Other - LegalFile: Authority Letter.pdf6 Oct 2024
Other - LegalFile: 7-12.pdf6 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_11zon.pdf6 Oct 2024
Other - TechnicalFile: Authority Letter.pdf6 Oct 2024
Other - TechnicalFile: DP Remarks.pdf6 Oct 2024
Other - TechnicalFile: CC verification.pdf6 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf6 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan2_11zon.pdf6 Oct 2024
Other - LegalFile: CC verification.pdf6 Oct 2024
Other - LegalFile: Authority Letter.pdf6 Oct 2024
Other - LegalFile: 7-12.pdf6 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_11zon.pdf6 Oct 2024
Other - TechnicalFile: Authority Letter.pdf6 Oct 2024
Other - TechnicalFile: DP Remarks.pdf6 Oct 2024
Other - TechnicalFile: CC verification.pdf6 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf6 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan2_11zon.pdf6 Oct 2024
Other - LegalFile: CC verification.pdf6 Oct 2024
Other - LegalFile: Authority Letter.pdf6 Oct 2024
Other - LegalFile: 7-12.pdf6 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_11zon.pdf6 Oct 2024
Other - TechnicalFile: Authority Letter.pdf6 Oct 2024
Other - TechnicalFile: DP Remarks.pdf6 Oct 2024
Other - TechnicalFile: CC verification.pdf6 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf6 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan2_11zon.pdf6 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_11zon.pdf6 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf6 Oct 2024
Other - LegalFile: CC verification.pdf6 Oct 2024
Other - LegalFile: Authority Letter.pdf6 Oct 2024
Other - TechnicalFile: CC verification.pdf6 Oct 2024
Other - TechnicalFile: DP Remarks.pdf6 Oct 2024
Other - TechnicalFile: Authority Letter.pdf6 Oct 2024
Other - LegalFile: 7-12.pdf6 Oct 2024
PAN CardFile: VCPL E PANCARD.pdf13 Aug 2024
Copy of the legal title reportFile: Title and Search Report 2_11zon.pdf13 Aug 2024
Copy of the legal title reportFile: Title and Search Report 1_organized.pdf13 Aug 2024
Other - LegalFile: KV Land Documents 2012 (1)_11zon-21-40_11zon.pdf13 Aug 2024
Other - LegalFile: KV Land Documents 2012 (1)_11zon-1-20_11zon.pdf13 Aug 2024
Other - LegalFile: KV Land Documents 2012 (1)_11zon-41-57_11zon.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A SVV Corrected.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A SSV Corrected.pdf13 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Unsecured Finances - Kalpavruksha A.pdf13 Aug 2024
PAN CardFile: VCPL E PANCARD.pdf13 Aug 2024
Copy of the legal title reportFile: Title and Search Report 2_11zon.pdf13 Aug 2024
Copy of the legal title reportFile: Title and Search Report 1_organized.pdf13 Aug 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KalpaVruksha CP52100019364-, Pune-Jan 2019CompletedDec 2023Dec 2023
KalpaVruksha BP52100004001Kasar Amboli, Pune52Aug 2017CompletedDec 2019Registered original: Dec 2018Dec 2019

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpavruksha A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: Vaichal Constructions Pvt Ltd

Vaichal Constructions Pvt Ltd has 3 registrations on MahaRERA, including KalpaVruksha B and KalpaVruksha C. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kalpavruksha A is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpavruksha A?

The registered promoter entity is Vaichal Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpavruksha A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpavruksha A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpavruksha A?

The professionals named in the filing: Architect: Shirish D. Satbhai; Engineer: Dhananjay Utpat; Chartered Accountant: Devendra Darekar; Chartered Accountant: J D Thorat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpavruksha A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpavruksha A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpavruksha A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.