ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Kalpavruksh Garden III

Registration lapsed No litigation declared Residential / Group Housing project

Kalpavruksh Garden III

By Mahendra J Vora & Others

RG-MH-99893 · RERA P51800007112 · Last updated on MahaRERA portal: 4 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 64 months past the filed date
  • 17 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2021Possession promised64 months past this date
10 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 75%
17Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Kalpavruksh Garden III is a Residential / Group Housing project by Mahendra J Vora & Others in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007112 on 17 Aug 2017. Possession was promised by 30 Jun 2021 and is now 64 months past that date. 17 complaints are on record with the regulator.

At a glance

Project

  • NameKalpavruksh Garden III
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007112
  • ReraGenie IDRG-MH-99893

Builder

  • NameMahendra J Vora & Others
  • Entity typeOthers
  • Named personsHemang Vora, Chirag Vora, Mahendra Vora

Key dates

64 months past promisethis monthRegisteredAug 2017PromisedJun 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings3 building records
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA250000
B WingNA250000
C WingNA300000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

A Wing85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
B Wing86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
C Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered100
BuildingClosed/CoveredTotal
A Wing4040
B Wing6060

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area567 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sadguru AssociatesAndheriMumbai Suburban
Mahendra J Vora & OthersBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI13017.0
Proposed, not sanctioned5,517 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNand Dham, MG Cross Road, Mumbai 400067

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhijit A Mehta
ArchitectP R Consultants
ArchitectAr Atit Mistry
ArchitectSapre and Associates
EngineerHiren Tanna
PartnerRole in project
Mahendra J Vora & Others-

Litigation declared1

CaseCourtStatus
355/2014CONSUMER COURTCASE PENDING

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000194516Harish BhattHemang Vora17/10/2020
CC006000000194568Manish R. SanganiMahendra Jayantilal Vora19/10/2020
CC006000000194575Ankita SalviMahendra Jayantilal Vora19/10/2020
CC006000000194603Shripal D. ShahMahendra Jayantilal Vora21/10/2020
CC006000000194595Trupti VoraMahendra Jayantilal Vora20/10/2020
CC006000000194629Usha R. ModhaMahendra Jayantilal Vora22/10/2020
CC006000000194645Kamlesh Amrutlal PadaliyaMahendra Jayantilal Vora23/10/2020
CC006000000194730Nimesh ThakerMahendra Jayantilal Vora03/11/2020
CC006000000194765Uttam MulikMahendra Vora02/11/2020
CC006000000194749Sharadkumar LashkariMahendra Vora03/11/2020
CC006000000194763Viraj BorichaMahendra Jayantilal Vora02/11/2020
CC006000000194790Rasai Properties Private LimitedMahendra Vora03/11/2020
CC006000000194789Kiran GawandeMahendra Jayantilal Vora04/11/2020
CC006000000194795Kanthi ShettigarMahendra Jayantilal Vora03/11/2020
CC006000000194797Nileshkumar BavaliyaMahendra Vora03/11/2020
CC006000000194805Shivananad ShettigarMahendra Jayantilal Vora04/11/2020
CC006000000195170Divya RathodMahendra Jayantilal Vora08/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Apr 2021

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form - 3 MJV Others - Q1 2023-24_small.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5 MJV Others - 2022-23.pdf4 Dec 2024
Certificates of CA (Form 3)File: From - 3 MJV Others - Q2 2023-24.pdf3 Dec 2024
Certificates of CA (Form 3)File: Form - 3 MJV Others - Q3 2023-24.pdf3 Dec 2024
Certificates of CA (Form 3)File: From - 3 MJV Others - Q4 2023-24.pdf3 Dec 2024
Certificates of CA (Form 3)File: Form - 3 MJV Others - Q1 2024-25.pdf3 Dec 2024
Certificates of CA (Form 3)File: From - 3 MJV Others - Q2 2024-25.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KG III Sold-Unsold - 06-06-2023.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KG III Sold-Unsold - 06-09-2023.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KG III Sold-Unsold - 06-12-2023.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KG III Sold-Unsold - 06-03-2024.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KG III Sold-Unsold - 06-06-2024.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KG III Sold-Unsold - 06-09-2024.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5 MJV Others - 2023-24.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: KALPAVRUKSH GARDEN III SOLD UNSOLD LIST 06032023.pdf6 Mar 2023
Certificates of CA (Form 3)File: KG III RERA CA CERTIFICATE 01102021 TO 31122021.pdf6 Feb 2023
Certificates of CA (Form 3)File: KG III RERA CA CERTIFICATE 01012022 31032022.pdf6 Feb 2023
Certificates of CA (Form 3)File: KG III RERA CA CERTIFICATE 01042022 30062022.pdf6 Feb 2023
Certificates of CA (Form 3)File: KG III RERA CA CERTIFICATE 01072022 30092022.pdf6 Feb 2023
Certificates of CA (Form 3)File: KG III RERA CA CERTIFICATE 01102022 31122022.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KG III RERA CA CERTIFICATE 04022023.pdf6 Feb 2023
Certificates of CA (Form 3)File: Certificate - MJV - As Promoter 30-09-2021.pdf23 Aug 2022
Certificates of CA (Form 3)File: Certificate - MJV - As Promoter 31-12-2021.pdf23 Aug 2022
Certificates of CA (Form 3)File: Certificate - MJV - As Promoter 31-03-2022.pdf23 Aug 2022
OtherFile: KG3 Proposed Plan - Part 1.pdf28 Jul 2022
OtherFile: KG3 Proposed Plan - Part 2.pdf28 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KG3 RERA Architect Certificate 16-07-2022.pdf26 Jul 2022
Disclosure of sold/ booked inventoryFile: KG3 Sold-Unsold List 15-07-2022.pdf26 Jul 2022
OtherFile: KG3 MahaRERA Project Update 26-07-2022.pdf26 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf7 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KG3 RERA FORM 5 2018-2019.PDF5 Jan 2022
Declaration about Commencement CertificateFile: KG3 Co-Promoter Submissions 15-12-2021 small.pdf18 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KG3 Co-Promoter Submissions 15-12-2021 small.pdf18 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KG3 Co-Promoter Submissions 15-12-2021 small.pdf18 Dec 2021
Disclosure of sold/ booked inventoryFile: KG3 Sold-Unsold List 15-12-2021 small.pdf18 Dec 2021
Disclosure of sold/ booked inventoryFile: KG3 - Sold-Unsold List.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KG3 - CA Certificate Form 5 - Joint 31-03-2020.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KG3 - CA Certificate Form 5 - Joint 30-06-2020.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KG3 - CA Certificate Form 5 - Joint 30-09-2020.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KG3 - CA Certificate Form 5 - Joint 31-03-2020.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KG3 - CA Certificate Form 5 - Joint 31-12-2020.pdf21 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KG3 - Part 2 OCC - Certificate 15-01-2021.pdf8 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KG3 - Part 2 OCC - Architect Clarification 20-01-2021.pdf8 Apr 2021
Copy of the legal title reportFile: title certificate of yatin shah.pdf10 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ca certificate kgiii 30-06-2020.pdf10 Sep 2020
Certificates of CA (Form 3)File: ca certificate KGIII 30-06-2019.pdf10 Sep 2020
Certificates of CA (Form 3)File: ca certificate kgiii 30-09-2019.pdf10 Sep 2020
Certificates of CA (Form 3)File: ca certificate kgiii 30-12-2019.pdf10 Sep 2020
Certificates of CA (Form 3)File: ca certificate kgiii 31-03-2020.pdf10 Sep 2020
Certificates of CA (Form 3)File: CA CERT-KGIII 30-06-2019.pdf10 Sep 2020
Certificates of CA (Form 3)File: CA CERT-KGIII 30-09-2019.pdf10 Sep 2020
Certificates of CA (Form 3)File: CA CERT-KGIII 31-12-2019.pdf10 Sep 2020
Details of Restarting of Construction work post lockdownFile: MAHA RERA LETTER with ANNEXURE A TO H WITH PLANS-compressed.pdf10 Sep 2020
OtherFile: POSSESSION LETTERS WITH PLAN.pdf10 Sep 2020
OtherFile: MAHA RERA LETTER with ANNEXURE A TO H WITH PLANS-compressed.pdf10 Sep 2020
OtherFile: MAHA RERA BANK ACCOUNT LETTER.pdf18 Mar 2020
Certificates of CA (Form 3)File: CA3.pdf5 Sep 2019
Certificates of CA (Form 3)File: CA4_.pdf5 Sep 2019
Annual Audit Report of Statutory CA (Form 5)File: CA5.pdf5 Sep 2019
Annual Audit Report of Statutory CA (Form 5)File: Audit Report Form - 5.pdf2 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KG3 Engg Certificate 162018 to 30112018.pdf12 Jan 2019
Certificates of CA (Form 3)File: CA certificate for sadguru-compressed.pdf12 Jan 2019
Certificates of CA (Form 3)File: CA Certificate Kalpavruksh Garden III.pdf12 Jan 2019
Certificates of CA (Form 3)File: CA Kalpavruksh GardenIII.pdf12 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: letter of Engineer.pdf19 Jun 2018
Certificates of CA (Form 3)File: ca certificate kg 3 joint_Compressed.pdf19 Jun 2018
Details of encumbrancesFile: Letter of encumbrance 140618.pdf16 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 310518.pdf16 Jun 2018
Certificates of CA (Form 3)File: CA Certificate 31518.pdf16 Jun 2018
Certificates of CA (Form 3)File: Scan Certificate_MJV-Promoter-ilovepdf-compressed (1).pdf16 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate of KG3.pdf19 Feb 2018
Certificates of CA (Form 3)File: CA Certificate - Sadguru.pdf19 Feb 2018
Certificates of CA (Form 3)File: CA_Certificate_MJV_Ors.pdf19 Feb 2018
Certificates of CA (Form 3)File: CA_Certificate_-_Joint.pdf19 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-min.pdf7 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf7 Nov 2017
Certificates of CA (Form 3)File: CA_Certificate_by_Kadhi_Asso_of_Tofal_KG_III-min-i (1).pdf7 Nov 2017
Certificates of CA (Form 3)File: Sadguru CA Certificate-min.pdf7 Nov 2017
Certificates of CA (Form 3)File: CA_Certificate_by_Kadhi_Asso_of_KG_III.pdf7 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate 311017.pdf31 Oct 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpavruksh Garden III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmKalpavruksh Garden IIICompleted 125Lapsed / revoked 81Other 173Dot size: filed unitsN

Filed coordinates, straight-line distance. 379 registered projects within 2 km.

Builder: Mahendra J Vora & Others

Mahendra J Vora & Others has 1 registration on MahaRERA, including Kalpavruksh Garden III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Kalpavruksh Garden III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Kalpavruksh Garden III is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpavruksh Garden III?

The registered promoter entity is Mahendra J Vora & Others, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpavruksh Garden III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kalpavruksh Garden III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kalpavruksh Garden III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpavruksh Garden III?

The professionals named in the filing: Architect: Abhijit A Mehta; Architect: P R Consultants; Architect: Ar Atit Mistry; Architect: Sapre and Associates; Engineer: Hiren Tanna. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpavruksh Garden III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpavruksh Garden III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpavruksh Garden III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.