Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Litigation declared, 3 cases
- 4 complaints at MahaRERA
- Rs 4.35 crore secured on the land, in favour of Crest Ventures Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kalpataru Park Riviera - Wing C and D is a Residential / Group Housing project by Kalpataru Plus Sharyans in Raigarh, Maharashtra, registered with MahaRERA as P52000027454 on 10 Dec 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 149 of the 156 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameKalpataru Park Riviera - Wing C and D
- TypeResidential / Group Housing
- Location
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000027454
- ReraGenie IDRG-MH-28966
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Dec 2020
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings2 building records
- Documents filed85 files
Current status
Figures as on 22 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing C - Aqua | NA | 27 | 27 | 78 | 0 | 78 |
| Wing D - Azure | NA | 27 | 27 | 78 | 0 | 78 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 67%.
Wing C - Aqua66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 67% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 59% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 11% |
Wing D - Azure63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 67% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 59% |
| Sanitary Fittings within the flats / premises | 3% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 41% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 13% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities18
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 48% |
| Storm Water Drains | Yes | 38% |
| Landscaping & Tree Planting | Yes | 15% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Club House other Recreational Areas and Swimming Pool | Yes | 0% |
| 2 Nos of Common Podium | Yes | 0% |
| 2 No. of Common Basement | Yes | 0% |
Parking filed716
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing C - Aqua | 349 | 9 | 358 |
| Wing D - Azure | 349 | 9 | 358 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/S Entech Consultant (Form 1 & Form 4) |
| Architect | Keyur Rajnikant Geeta Chanchad |
| Engineer | Prashant Palande |
| Chartered Accountant | kkc & associates llp |
| Partner | Role in project |
|---|---|
| Kalpataru Plus Sharyans | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 207/2007 | Civil Judge JD Panvel | Pending |
| 238/2008 | JMFC Panvel | Pending However Promoter is not a Party |
| 743/2011 | Bombay High Court | Pending However Promoter is not a Party |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000354310 | Sanjay Rajaram Sonawane | Kalpataru and Shreyans | 19/02/2023 |
| CC12501978 | PRATHAMESH PRAKASH CHACHAR | Kalpataru Plus Sharyans | 17/06/2025 |
| CC12502179 | Sandip Shamrao Jadhav | Kalpataru Plus Sharyans | 01/07/2025 |
| CC12603731 | Dadabhau Baburao Gadge | Kalpataru Plus Sharyans | 17/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A Park Riviera Wing CD.pdf | 22 Jun 2026 |
| Form 1File: Park Riviera CD AC.pdf | 17 Apr 2026 |
| Form 2File: Park Riviera CD EC.pdf | 17 Apr 2026 |
| Form 3File: Park Riviera C and D CA.pdf | 17 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Park Riviera C and D.pdf | 17 Apr 2026 |
| Form 1File: Park Riviera CD AC.pdf | 19 Jan 2026 |
| Form 2File: Park Riviera CD EC.pdf | 19 Jan 2026 |
| Form 3File: Kalpataru Park Riviera CD.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Park Riviera-CD.pdf | 19 Jan 2026 |
| Form 1File: Park Riviera CD AC.pdf | 18 Oct 2025 |
| Form 2File: Park Riviera CD EC.pdf | 18 Oct 2025 |
| Form 3File: CA Certificate_Kalpataru Park Riviera C&D - 30-09-2025.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Kalpataru Park Riviera Wing C and D.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Riviera Wing C and D March 2025.pdf | 29 Sep 2025 |
| Form 2A (FY 2024-2025)File: Park Riviera Wing C and D.pdf | 12 Aug 2025 |
| Form 1File: Park Riviera CD.pdf | 19 Jul 2025 |
| Form 2File: Park Riviera CD.pdf | 19 Jul 2025 |
| Form 3File: Kalpataru Park Riviera C&D.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Riviera CD.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera CD AC.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Kalpataru Park Riviera C-D.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Riviera CD EC.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera CD AC.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Riviera CD.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Riviera CD EC.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Park Riviera - Wing CD.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Riviera CD.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera CD.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Riviera CD.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Riviera Wing C and D.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Park Riviera CD.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera C and D.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Park Riviera CD.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Park wing CD.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: K Park Wing CD.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera c and d.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Park CD.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Kalpataru Park Riviera CD.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: K Park Riviera Wing CD.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera c and d.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Park Riviera Wing CD.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Kalpataru Park Riviera CD.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Park Riviera CD.pdf | 20 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera c and d.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Rivera CD.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CertificateKalpataru Park Riviera CD.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Riviera CD.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: K Park CD.pdf | 6 Sep 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: k Park Riviera.pdf | 14 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Park Riviera CD.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Park Riviera CD.pdf | 26 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Kalpataru Park Riviera CD.pdf | 26 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Park Riveria CD.pdf | 23 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Park Riviera CD.pdf | 23 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: K P Riviera CD.pdf | 14 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Riviera W C D.pdf | 27 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Riviera W C D.pdf | 27 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalpataru Park Riviera CD Dec22.pdf | 27 Feb 2023 |
| Layout approvalFile: Sheet .pdf | 19 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Sheet .pdf | 19 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: ParkRiviera_AmendedCC.pdf | 19 Nov 2022 |
| Declaration about Commencement CertificateFile: Park rivera CD 1.pdf | 19 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalpataru Part Riveria C and D.pdf | 30 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Park Riveria CD.pdf | 21 Apr 2022 |
| Layout approvalFile: Park Riviera Layout .pdf | 18 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Park Riviera Layout .pdf | 18 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Park Riviera CC.pdf | 18 Feb 2022 |
| Declaration about Commencement CertificateFile: Park Riviera C and D.pdf | 18 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Park Riviera.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Kalpataru Park Riviera-Mar'21_compressed.pdf | 6 Oct 2021 |
| Declaration about Commencement CertificateFile: park riviera.pdf | 4 Oct 2021 |
| Details of encumbrancesFile: Encumbrance Letter final.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Park riviera.pdf | 20 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: park riviera.pdf | 27 May 2021 |
| Details of encumbrancesFile: EC.pdf | 8 Dec 2020 |
| Layout approvalFile: layout_compressed.pdf | 2 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: layout_compressed.pdf | 2 Dec 2020 |
| Building plan approvalFile: Amended Permission.pdf | 1 Dec 2020 |
| PAN CardFile: Kalptaru and Sharyans.pdf | 1 Dec 2020 |
| Copy of the legal title reportFile: Title Certificate.pdf | 1 Dec 2020 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kalpataru Waterfront | Old Mumbai Pune Expy opp Panchmukhi Hanuman Temple Old Panvel Panvel Navi Mumbai Maharashtra 410206 | 88 | Completed | Dec 2020 | Feb 2019 |
| Kalpataru Riverside | Kalpataru Riverside Opp Panchmukhi Hanuman Temple Off Old Mumbai Pune Highway Panvel - 410206 | 714 | Completed | Mar 2013 | Mar 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kalpataru Park Riviera - Wing C and D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
Filed coordinates, straight-line distance. 402 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Kalpataru Plus Sharyans
Kalpataru Plus Sharyans has 4 registrations on MahaRERA, including Kalpataru Woodsville and Kalpataru Waterfront. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Kalpataru Park Riviera - Wing C and D shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Kalpataru Park Riviera - Wing C and D is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kalpataru Park Riviera - Wing C and D?
The registered promoter entity is Kalpataru Plus Sharyans, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kalpataru Park Riviera - Wing C and D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kalpataru Park Riviera - Wing C and D?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kalpataru Park Riviera - Wing C and D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kalpataru Park Riviera - Wing C and D?
The professionals named in the filing: Architect: M/S Entech Consultant (Form 1 & Form 4); Architect: Keyur Rajnikant Geeta Chanchad; Engineer: Prashant Palande; Chartered Accountant: kkc & associates llp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kalpataru Park Riviera - Wing C and D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback