Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 99%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Kalpataru Imperia is a Residential / Group Housing project by Kalpataru Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800020203 on 29 Mar 2019. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameKalpataru Imperia
  • TypeResidential / Group Housing
  • Location
    • Phiroz Shah Road
    • Santacruz West
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • RERA no.P51800020203
  • ReraGenie IDRG-MH-02987

Builder

  • NameKalpataru Limited
  • Entity typeCompany
  • CINU45200MH1988PLC050144
  • Managing DirectorParag Mofatraj Munot
  • ChairpersonMofatraj Pukhraj Munot
  • Other registrations8 more →
  • Completed3 of 9
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2019PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Mar 2019
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

95.8%Work done, per cost certificate

Figures as on 11 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kalpataru ImperiaNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

Kalpataru Imperia: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84%

Progress on shared amenities16

As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes81%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes99%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Fitness CentreYes100%

Parking filed136

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots136
Closed/Covered135
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,007 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6309.0
Proposed, not sanctioned5,957 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo C-2, West Core area, Ground floor, Tower No 3, Bharat Diamond Bourse Complex, G Block, Bandra Kur
Estimated costRs 47.08 cr
Cost incurredRs 45.13 cr
Work done95.85%
BuildingWingEstimatedIncurred
Kalpataru ImperiaNARs 30.37 crRs 29.02 cr
-NARs 16.71 crRs 16.11 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S Entech Consultant (Form 1 & Form 4)
EngineerMilind Naik
EngineerSuresh Shinde
Chartered AccountantC R Mohnot & Co (Form 3)
Chartered AccountantKhimji Kunverji & Co (Statutory Auditor - Form 5)
PartnerRole in project
Kalpataru Limited-

Litigation declared1

CaseCourtStatus
236/2018Debt Recovery Tribunal IIDisposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jun 2024

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Imperia.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Imperia.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Imperia.pdf14 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Letter - Sanjog.pdf13 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Imperia.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: Imperia.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Imperia.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Imperia.pdf20 Apr 2024
Certificates of CA (Form 3)File: CA Certificate Sanjog Mar24.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Imperia.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Imperia.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: K Imperia.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Imperia_.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Imperia_.pdf20 Jan 2024
Certificates of CA (Form 3)File: CA Certificate Imperia Dec 23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: K Imperia.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Imperia_.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Imperia.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA Certificate Imperia Sep 23.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Imperia.pdf29 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: K Imperia.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Imperia.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Imperia.pdf25 Jul 2023
Certificates of CA (Form 3)File: CA Certificate Imperia June 23.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Imperia.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Matru Ashish.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Imperia.pdf22 Jun 2023
Disclosure of sold/ booked inventoryFile: K Imperia.pdf7 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Imperia.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Imperia.pdf23 Feb 2023
Certificates of CA (Form 3)File: Sanjog Dec 22.pdf23 Feb 2023
Layout approvalFile: SANJOG APPROVAL 11-01-2023 1ST SHEET (1) (1).pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: SANJOG APPROVAL 11-01-2023 1ST SHEET (1) (1).pdf8 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC top of 9th Floor.pdf8 Feb 2023
Declaration about Commencement CertificateFile: Imperia 4.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (10).pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalpataru Imperia.pdf30 Sep 2022
CERSAI detailsFile: CERSAI Imperia.pdf8 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Imperia CC.pdf12 Jul 2022
Declaration about Commencement CertificateFile: Imperia 3.pdf12 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Imperia.pdf21 Apr 2022
Layout approvalFile: Imperia layout.pdf19 Nov 2021
Copy of Layout Approval (in case of layout)File: Imperia layout.pdf19 Nov 2021
Declaration about Commencement CertificateFile: Imperia 2.pdf19 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: imperia.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Imperia Sold unit.pdf5 Oct 2021
Declaration about Commencement CertificateFile: imperia.pdf4 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5Sanjog.pdf4 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Imperia CC.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: K Imperia.pdf20 Jul 2021
Form 2AFile: Imperia.pdf7 May 2021
Form 2AFile: Imperia.pdf9 Feb 2021
Form 2AFile: Imperia_compressed.pdf29 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_Imperia.pdf9 Oct 2020
Form 2AFile: Imperia March -20_compressed.pdf18 Sep 2020
Form 2AFile: Imperia June-20_compressed.pdf18 Sep 2020
OtherFile: Other statement Imperia.pdf3 Mar 2020
Layout approvalFile: Latest Approved Plan 1.pdf29 Feb 2020
Building plan approvalFile: 3311 Amendletter_signed.pdf29 Feb 2020
Copy of Layout Approval (in case of layout)File: Latest Approved Plan 1.pdf29 Feb 2020
Building Plan Approval (IOD)File: 3311 Amendletter_signed.pdf29 Feb 2020
Form 2AFile: Imperia.pdf16 Jan 2020
Form 2AFile: Imperia.pdf16 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Kalpataru Imperia.pdf30 Sep 2019
Form 2AFile: imperia.pdf19 Aug 2019
Form 2AFile: imperia.pdf29 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: CC PLinth 17519.pdf18 Jun 2019
Details of encumbrancesFile: EC Imperia.pdf17 Jun 2019
Layout approvalFile: Sanjog Layout final.pdf27 Mar 2019
Copy of Layout Approval (in case of layout)File: Sanjog Layout final.pdf27 Mar 2019
Declaration in FORM BFile: Form B Sanjog (Kalpataru Imperia).pdf27 Mar 2019
Certificates of CA (Form 3)File: CA Certificate Kalpatru ImperiaFeb 2019.pdf27 Mar 2019
Proforma of Allotment letterFile: LOI.pdf27 Mar 2019
OtherFile: Other.pdf27 Mar 2019
Building plan approvalFile: ISSUE LETTER .pdf26 Mar 2019
Copy of the legal title reportFile: Sanjog -Final TC.pdf26 Mar 2019
Details of encumbrancesFile: Sanjog -Final EC.pdf26 Mar 2019
Building Plan Approval (IOD)File: ISSUE LETTER .pdf26 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: Sanjog_FirstCC.pdf26 Mar 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kalpataru SolitaireJVPD Scheme Vile Parle West57CompletedDec 2019Mar 2019
Kalpataru InspireOpposite Grand Hyatt Hotel Santacruz East Mumbai 40005530CompletedApr 2015Apr 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Imperia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Santacruz West6,700+ in Mumbai Suburban

Builder: Kalpataru Limited

Kalpataru Limited has 9 registrations on MahaRERA, including Kalpataru Avana and Kalpataru Solitaire. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kalpataru Imperia is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Imperia?

The registered promoter entity is Kalpataru Limited, a company as per the filing. Its CIN U45200MH1988PLC050144 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Imperia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpataru Imperia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Imperia?

The professionals named in the filing: Architect: M/S Entech Consultant (Form 1 & Form 4); Engineer: Milind Naik; Engineer: Suresh Shinde; Chartered Accountant: C R Mohnot & Co (Form 3); Chartered Accountant: Khimji Kunverji & Co (Statutory Auditor - Form 5). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Imperia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Imperia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Imperia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.