Registered Litigation declared Residential / Group Housing project

Kalpataru Azuro

By Kalpataru Properties Limited

RG-MH-64734 · RERA P51900045295 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Rs 1,750.00 crore secured on the land, in favour of GSS India Opportunities AIF Scheme I

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 87%
7 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Kalpataru Azuro is a Residential / Group Housing project by Kalpataru Properties Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900045295 on 12 May 2022. Possession is promised by 31 Dec 2027. 7 of the 14 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameKalpataru Azuro
  • TypeResidential / Group Housing
  • Location
    • Nepean Sea Road
    • Mumbai City
    • 400006
  • Pincode400006
  • RERA no.P51900045295
  • ReraGenie IDRG-MH-64734

Builder

  • NameKalpataru Properties Limited
  • Entity typeCompany
  • CINU41000MH1975PTC018371
  • GSTIN27AAACK1975H1ZG
  • DirectorImtiaz Kanga
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 May 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

50%7 of 14 units booked
47.6%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kalpataru AzuroNA311614014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 87%.

Kalpataru Azuro: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure87%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered49

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,008 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofGSS India Opportunities AIF Scheme I
Secured amountRs 1,750.00 crore
CERSAI search filedYes
Declared on3 Jun 2026

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI4584.26
Proposed, not sanctioned4,079 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Jehangir Building, MG Road, Fort, Mumbai - 400023
Estimated costRs 90.41 cr
Cost incurredRs 43.00 cr
Work done47.56%
BuildingWingEstimatedIncurred
Kalpataru AzuroNARs 63.46 crRs 32.22 cr
-NARs 26.95 crRs 10.78 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S Entech Consultant (Form 1 & Form 4)
EngineerAnis Shaikh
EngineerAnil Bhardwaj
EngineerSharad Ghule
EngineerSharad Ghule (Form 2 & Form 2A)
Chartered Accountantkkc & associates llp
Chartered AccountantC.R Mohnot & Co.
Chartered AccountantC R Mohnot & Co (Form 3)
PartnerRole in project
Kalpataru Properties Limited-

Litigation declared1

CaseCourtStatus
27301/2016Bombay High CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Azuro.pdf22 Jun 2026
Withdrawal Update Form 1File: Azuro AC.pdf20 Apr 2026
Withdrawal Update Form 1File: Azuro AC.pdf20 Apr 2026
Withdrawal Update Form 2File: Azuro EC.pdf20 Apr 2026
Withdrawal Update Form 2File: Azuro EC.pdf20 Apr 2026
Withdrawal Update Form 3File: Azuro CA.pdf20 Apr 2026
Withdrawal Update Form 3File: Azuro CA.pdf20 Apr 2026
Withdrawal Update Form 1File: Azuro AC.pdf11 Feb 2026
Withdrawal Update Form 2File: Azuro EC.pdf11 Feb 2026
Withdrawal Update Form 3File: CA Certificate Azuro Dec 2025.pdf11 Feb 2026
Withdrawal Update Form 1File: Azuro AC.pdf23 Oct 2025
Withdrawal Update Form 2File: Azuro EC.pdf23 Oct 2025
Withdrawal Update Form 3File: CA Certificate Azuro Sept 2025.pdf23 Oct 2025
Form 5 (FY 2024-2025)File: Kalpataru Azuro.pdf23 Sep 2025
Form 1File: AC AZURO.pdf24 Jul 2025
Form 2File: Azuro EC.pdf24 Jul 2025
Form 3File: KPPL- Azuro.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Azuro.pdf24 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Azuro.pdf2 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Azuro AC.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Azuro March 2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Azuro EC.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Azuro AC.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Azuro.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Azuro EC.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Azuro.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Azuro.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Azuro.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Azuro September 24.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Azuro.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Azuro.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Azuro.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Azuro.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Azuro.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Azuro June 24.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Azuro.pdf14 Jun 2024
CERSAI detailsFile: CERSAI report.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Azuro.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Azuro.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Azuro.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalpataru Azuro.pdf20 Apr 2024
Details of encumbrancesFile: Azuro.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: K Azuro.pdf30 Jan 2024
Details of encumbrancesFile: EC Finance Azuro.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Azuro.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Azuro.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certifiate Azuro Dec 23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: K Magnus.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: K Azuro.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Azuro_.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Azuro_.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Azuro.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: K Azuro.pdf12 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Azuro Revalidate 14_06_2024.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Azuro.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Azuro.pdf26 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Kalpataru Azuro June 2023.pdf26 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Azuro CC.pdf26 Jun 2023
Declaration about Commencement CertificateFile: K Azuro 1.pdf26 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: K Azuro.pdf22 Jun 2023
Disclosure of sold/ booked inventoryFile: K Azuro.pdf7 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Azuro.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Azuro.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K-Azuro-Dec 22.pdf23 Feb 2023
Layout approvalFile: Azuro layout.pdf12 Jul 2022
Layout approvalFile: Azuro layout.pdf12 Jul 2022
Copy of Layout Approval (in case of layout)File: Azuro layout.pdf12 Jul 2022
Copy of Layout Approval (in case of layout)File: Azuro layout.pdf12 Jul 2022
CERSAI detailsFile: Cersai Asset Based.pdf10 May 2022
Details of encumbrancesFile: EC with Amount_merged.pdf9 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC With Revalidate.pdf9 May 2022
Layout approvalFile: 01_LAYOUT_CONC_03-03-2022-Model_compressed (1).pdf4 May 2022
Layout approvalFile: ExtractPage1_compressed.pdf4 May 2022
Copy of Layout Approval (in case of layout)File: ExtractPage1_compressed.pdf4 May 2022
Copy of Layout Approval (in case of layout)File: 01_LAYOUT_CONC_03-03-2022-Model_compressed (1).pdf4 May 2022
Declaration about Commencement CertificateFile: CC Dec.pdf4 May 2022
Proforma of Allotment letterFile: Letter of Intent Kalpataru Azuro.pdf4 May 2022
Building plan approvalFile: Amend letter.pdf3 May 2022
PAN CardFile: Kalpataru Properties Pvt Ltd.pdf3 May 2022
Copy of the legal title reportFile: Final Maharera Title Report.pdf3 May 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kalpataru Splendour Wing A, B, C, D, E, F, G, H, IVillage Wakad Tal Mulshi Near Datta Mandir Dist Pune 411057297CompletedDec 2015Late, Jul 2016

How this compares with Mumbai City

50%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Azuro on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nepean Sea Road780+ in Mumbai City

Builder: Kalpataru Properties Limited

Kalpataru Properties Limited has 3 registrations on MahaRERA, including Kalpataru Azuro and Kalpataru One - Wing A. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Kalpataru Azuro is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Azuro?

The registered promoter entity is Kalpataru Properties Limited, a company as per the filing. Its CIN U41000MH1975PTC018371 and GSTIN 27AAACK1975H1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Azuro?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpataru Azuro?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Azuro?

The professionals named in the filing: Architect: M/S Entech Consultant (Form 1 & Form 4); Engineer: Anis Shaikh; Engineer: Anil Bhardwaj; Engineer: Sharad Ghule; Engineer: Sharad Ghule (Form 2 & Form 2A); Chartered Accountant: kkc & associates llp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Azuro?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Azuro. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Azuro to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.