Home / Browse projects / Nagpur, Maharashtra / KALINDI VIHAR
KALINDI VIHAR
By KALINDI VENTURES PRIVATE LIMITED
RG-MH-69271 · RERA P50500022949 · Last updated on MahaRERA portal: 17 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 19 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KALINDI VIHAR is a Residential / Group Housing project by KALINDI VENTURES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500022949 on 5 Nov 2019. Possession was promised by 29 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing. 23 of the 39 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameKALINDI VIHAR
- TypeResidential / Group Housing
- Location
- Nari Road
- Sahare Layout
- Near Baba Balaknath Mandir
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440026
- Pincode440026
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500022949
- ReraGenie IDRG-MH-69271
Builder
- NameKALINDI VENTURES PRIVATE LIMITED
- Entity typeCompany
- DirectorsBHARATI ATUL DISAWAL, PREETI KISHAN VERMA
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Nov 2019
- Promised completion29 Mar 2025
- Revised completionRevised to 29 Mar 2025 (originally 30 Mar 2024)
- Buildings1 building record
- Documents filed50 files
Current status
Figures as on 17 May 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KALINDI VIHAR | NA | 7 | 7 | 36 | 3 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
KALINDI VIHAR: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KALINDI VENTURES PRIVATE LIMITED | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOGENDRA YADAV |
| Engineer | S B MALODE ASSOCIATES |
| Chartered Accountant | CA OMESH KUMAR PATEL |
| Partner | Role in project |
|---|---|
| KALINDI VENTURES PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was acquired in March 2023, and following thorough due diligence, development commenced. Currently, approximately 70% of the project has been completed, encompassing the installation of all slabs, completion of brickwork up to the fourth floor, and the installation of the transformer. However, to add the finishing touches, including sanitary installations, tiles, and plastering, we require additional time.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Oct 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed50
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: OC - NIT.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024 25 3rd arch.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 25 3rd Qtr CA certificate.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024 25 3rd Qtr Engr Certificate.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Oct 2024 |
| Declaration in FORM BFile: Form B.pdf | 10 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 10 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: doc_seminar_2018_05_24_certification.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: foRM 3-compressed.pdf | 5 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 4.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed Upload_compressed.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 FY 23-24 upload.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineers Certificate 4th Qtr 2023-24.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Dec 23.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 March 24.pdf | 13 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 4th qtr 2024.pdf | 12 Apr 2024 |
| Other - LegalFile: dod imp page_compressed.pdf | 14 Feb 2024 |
| Copy of the legal title reportFile: Legal Title report_compressed.pdf | 13 Feb 2024 |
| Details of encumbrancesFile: FORM B affidavid.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anx B Engr Cert.pdf | 13 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Anx c Engr Cert.pdf | 13 Feb 2024 |
| PAN CardFile: epan.pdf | 4 Jan 2024 |
| Copy of the legal title reportFile: Legal Title report_compressed.pdf | 4 Jan 2024 |
| Declaration in FORM BFile: FORM B affidavid.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalindi Vihar Architect Report - 1.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalindi Vihar Engineers Report - 1.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA.pdf | 4 Jan 2024 |
| Other - LegalFile: APPROVAL FROM AUTHORITY.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Report 19-20 FORM 5.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Report 20-21 FROM 5.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report 21-22 FROM 5.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Report 22-23 FROM 5.pdf | 5 Oct 2023 |
| Copy of the legal title reportFile: legal title report.pdf | 26 Oct 2019 |
| Layout approvalFile: LAYOUT APPROVAL UPLOAD.pdf | 8 Oct 2019 |
| Building plan approvalFile: BUILDING PLAN APPROVAL.pdf | 8 Oct 2019 |
| PAN CardFile: PAN.pdf | 8 Oct 2019 |
| Details of encumbrancesFile: Details of Encumbraces.pdf | 8 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL UPLOAD.pdf | 8 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVAL.pdf | 8 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMMENCEMENT CERTIFICATE.pdf | 8 Oct 2019 |
| Declaration in FORM BFile: declaration in form b.pdf | 8 Oct 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA.pdf | 8 Oct 2019 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER AND AGGREMENT TO SELL.pdf | 8 Oct 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: GUMASTA.pdf | 8 Oct 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| KALINDI VATIKAP50500046467 | JAI HIND CO-COPERATIVE SOCIETY RAMNA MAROTI NAGAR MOUZA HARPUR, Nagpur | 17 | Aug 2022 | Completed | Dec 2023 | Jan 1970 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 50 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KALINDI VIHAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sahare Layout, Near Baba Balaknath Mandir2,800+ in Nagpur
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
Swapnapurtee - A Project by NMC
SANDEEP DWELLERS PVT. LTD.
KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE
KARAN KOTHARI BUSINESS PARK PRIVATE LIMITE
HBA PARK PHASE-I
HBA CONSTRUCTION COMPANY PVT.LTD
OAK SHANTINIKETAN
OAK Constructions
RAI CREST
RAI UDYOG UNITY MEDISCIENCE PRIVATE LIMITE
BHIL CITY 3
MOHAN BAPURAO MAKDE
See every Nagpur project, with the district possession charts
Builder: KALINDI VENTURES PRIVATE LIMITED
KALINDI VENTURES PRIVATE LIMITED has 1 registration on MahaRERA, including KALINDI VIHAR. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that KALINDI VIHAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KALINDI VIHAR is delayed beyond 29 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KALINDI VIHAR?
The registered promoter entity is KALINDI VENTURES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KALINDI VIHAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KALINDI VIHAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KALINDI VIHAR?
The professionals named in the filing: Architect: YOGENDRA YADAV; Engineer: S B MALODE ASSOCIATES; Chartered Accountant: CA OMESH KUMAR PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KALINDI VIHAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback