Home / Browse projects / Pune, Maharashtra / Kaleidoscope R5 Misty greens Phase 3B

Registered No litigation declared Plotted project

Kaleidoscope R5 Misty greens Phase 3B

By KALEIDOSCOPE DEVELOPERS PVT. LTD.

RG-MH-91397 · RERA P52100080947 · Last updated on MahaRERA portal: 23 Aug 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2030Possession promisedno revision filed
2Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Kaleidoscope R5 Misty greens Phase 3B is a Plotted project by KALEIDOSCOPE DEVELOPERS PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100080947 on 26 Aug 2025. Possession is promised by 31 Jan 2030. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKaleidoscope R5 Misty greens Phase 3B
  • TypePlotted
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080947
  • ReraGenie IDRG-MH-91397

Builder

  • NameKALEIDOSCOPE DEVELOPERS PVT. LTD.
  • Entity typeCompany
  • CINU45202MH2010PTC204617
  • GSTIN27AAECK0069L1ZC
  • DirectorsPushkar Pramod Apte, Sarang Sudhakar Kale, Shrikant Puroshottam Paranjape
  • Other registrations3 more →

Key dates

this monthRegisteredAug 2025PromisedJan 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Aug 2025
  • Promised completion31 Jan 2030
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed59 files

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Progress on shared amenities15

As on 23 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership37

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,116 sq m
Land owned byThe promoter, with other names on the file
Named landowners37
LandownerVillageDistrict
Baban Tukaram ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Santosh Baban ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Smruti Santosh ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Omkar Rajendra ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Rohidas Baban ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Dhanshree Rohidas ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Prathamesh Rohidas ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Rambhau Sopan ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Vijay Ankush ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Manali Vijay ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Radhika Vijay ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Bhagwan Rambhau ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Rani Bhagwan ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Bhakti Bhagwan ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Surekha Ankush ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sonali Ankush ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Shivaji Baban ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Mainabai Dilip SanasGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Savitrabai Balasaheb GawaliGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sanjabai Sopan MarneGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Nanda ShivajI ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Dhanshree Shivaji ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Tejashree Shivaji ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Tanmay Shivaji ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Kalpana Rajendra ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sudynaka Santosh ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sankalap Santosh ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Rajendra @ Raju Baban ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Akasah Rajendra ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Rakhamabai Rambhau ChondheGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Seetabai Rambhau ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Shon Bhagwan ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Gouri @ Manjiri Ankush ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sakhubai Baban ShedgeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Surekha Haribhau ChondheGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Anusaya Nivrutti GhogreGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
LUCIFER ENGINEERING PRIVATE LIMITEDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR Floor Industry House branch HT parekh marg churchgate Mumbai 400020

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Land Architect PVT Ltd
ArchitectArchland Architect Pvt Ltd
EngineerDeepali Desai
Chartered AccountantKapure and Kapure
Chartered AccountantKapure and Kapure Chartered Accountant
PartnerRole in project
KALEIDOSCOPE DEVELOPERS PVT. LTD.-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601225Prashant Rameshchandra GametiKALEIDOSCOPE DEVELOPERS PVT. LTD.06/03/2026
CC12601224Ashish KumarKALEIDOSCOPE DEVELOPERS PVT. LTD.06/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2030

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: KDPL PLU 24-1-25_-Model with highlight_23082025_1.pdf23 Aug 2025
Copy of Layout Approval (in case of layout)File: KDPL PLU 24-1-25_-Model with highlight_23082025_1.pdf23 Aug 2025
Other - TechnicalFile: Declaration Architect_page-0001.pdf23 Aug 2025
Other - TechnicalFile: Declaration promoter_page-230825.pdf23 Aug 2025
Other - TechnicalFile: 3B Plots.pdf20 Aug 2025
Other - TechnicalFile: R5 Misty Green Phase 3 B -9-12-24 FOR sale_8-8-25.pdf13 Aug 2025
Other - TechnicalFile: Declaration for planKDPL R5.pdf13 Aug 2025
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate_306025.pdf2 Jul 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report -AFS_ 3B.pdf2 Jul 2025
Proforma of Agreement for saleFile: 4 3 AGREEMENT R5 -3b - revise area_020725.pdf2 Jul 2025
Other - TechnicalFile: Declaration for not opening bank accoun.pdf17 Jun 2025
Other - FinanceFile: 10735.pdf13 Jun 2025
Other - FinanceFile: 12461.pdf13 Jun 2025
Other - FinanceFile: 12458.pdf13 Jun 2025
Other - FinanceFile: 4448.pdf13 Jun 2025
Other - FinanceFile: 7826-3_compressed.pdf13 Jun 2025
Other - FinanceFile: 7826-1_compressed.pdf13 Jun 2025
Other - FinanceFile: 18719_compressed.pdf13 Jun 2025
Other - FinanceFile: 7826-2_compressed.pdf13 Jun 2025
Copy of the legal title reportFile: Title Report_210525.pdf21 May 2025
Other - LegalFile: DA_Highlghted.pdf20 May 2025
Other - TechnicalFile: Declaration for CC_1.pdf20 May 2025
Other - LegalFile: 7-12.pdf15 May 2025
Other - TechnicalFile: Declaration for Survey No-May25.pdf15 May 2025
Other - FinanceFile: Declaration for Land cost bifurcation-R5 Phase 3B.pdf23 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance - legal-revised.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 KDPL R5 3B Final.pdf17 Apr 2025
Other - LegalFile: Non negotiable clauses.pdf17 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance - legal-revised.pdf17 Apr 2025
Other - FinanceFile: ilovepdf_merged.pdf17 Apr 2025
Other - TechnicalFile: Declaration Cum Undertaking-KDPL-Phase 3B_page-0001.pdf17 Apr 2025
Other - TechnicalFile: Declaration abour Area in the project.pdf17 Apr 2025
Other - LegalFile: 12362_compressed-2.pdf16 Apr 2025
Other - LegalFile: 12362_compressed-3.pdf16 Apr 2025
Other - LegalFile: 12362_compressed-1.pdf16 Apr 2025
Other - LegalFile: 12361-3.pdf16 Apr 2025
Other - LegalFile: 12361-2.pdf16 Apr 2025
Other - LegalFile: 12361-1.pdf16 Apr 2025
Other - FinanceFile: KDPL R5 3B Secured Loans declaration.pdf16 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured_unsecured with annexures.pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: Finance Encumbrance with declaration.pdf15 Apr 2025
CERSAI detailsFile: CERSAI Declaration.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Finance Encumbrance with declaration.pdf15 Apr 2025
Building plan approval or NA orderFile: PLU sheet no1.pdf12 Apr 2025
Building plan approval or NA orderFile: PLU sheet no 2.pdf12 Apr 2025
Proforma of Allotment letterFile: Allotment Letter.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLU sheet no1.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLU sheet no 2.pdf12 Apr 2025
PAN CardFile: PAN Card.pdf10 Apr 2025
Declaration in FORM BFile: FORM B-Affidavit of Promoter-KDPL R5 Phase 3B.pdf10 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-regn-KDPL R5 Phase 3B_compressed.pdf10 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-KDPL R5-Phase 3B-Regn.pdf10 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate R5-3b.PDF10 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - KDPL Misty Green R5 Phase 3B.pdf10 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report - Letter of allotment-KDPL PHASE 3B.pdf10 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Pushkar Pramod Apte-Disclosure of Interest-KDPL-Phase 3B.pdf10 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Shrikant Paranjape-Disclosure -KDPL-Phase 3B.pdf10 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Sarang Kale-Disclosure-KDPL-Phase 3B.pdf10 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B-Bank Account Declaration on BANK Letterhead-KDPL-R5.pdf10 Apr 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kaleidoscope R5 Misty greens Phase 3B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmKaleidoscope R5 Misty grCompleted 2Lapsed / revoked 4Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: KALEIDOSCOPE DEVELOPERS PVT. LTD.

KALEIDOSCOPE DEVELOPERS PVT. LTD. has 4 registrations on MahaRERA, including Kaleidoscope-R4-MISTY GREENS and Kaleidoscope R3 Misty Greens Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kaleidoscope R5 Misty greens Phase 3B is delayed beyond 31 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kaleidoscope R5 Misty greens Phase 3B?

The registered promoter entity is KALEIDOSCOPE DEVELOPERS PVT. LTD., a company as per the filing. Its CIN U45202MH2010PTC204617 and GSTIN 27AAECK0069L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kaleidoscope R5 Misty greens Phase 3B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kaleidoscope R5 Misty greens Phase 3B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kaleidoscope R5 Misty greens Phase 3B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kaleidoscope R5 Misty greens Phase 3B?

The professionals named in the filing: Architect: Arch Land Architect PVT Ltd; Architect: Archland Architect Pvt Ltd; Engineer: Deepali Desai; Chartered Accountant: Kapure and Kapure; Chartered Accountant: Kapure and Kapure Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kaleidoscope R5 Misty greens Phase 3B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kaleidoscope R5 Misty greens Phase 3B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kaleidoscope R5 Misty greens Phase 3B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.