Home / Browse projects / Pune, Maharashtra / Kaleidoscope R3 Misty Greens Phase 2

Registered Litigation declared Plotted project

Kaleidoscope R3 Misty Greens Phase 2

By KALEIDOSCOPE DEVELOPERS PVT. LTD.

RG-MH-60632 · RERA P52100053834 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
19 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Kaleidoscope R3 Misty Greens Phase 2 is a Plotted project by KALEIDOSCOPE DEVELOPERS PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100053834 on 1 Dec 2023. Possession is promised by 1 Oct 2028. 58 of the 77 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKaleidoscope R3 Misty Greens Phase 2
  • TypePlotted
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100053834
  • ReraGenie IDRG-MH-60632

Builder

  • NameKALEIDOSCOPE DEVELOPERS PVT. LTD.
  • Entity typeCompany
  • CINU45202MH2010PTC204617
  • GSTIN27AAECK0069L1ZC
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsPushkar Pramod Apte, Sarang Sudhakar Kale, Shrikant Puroshottam Paranjape
  • Other registrations3 more →

Key dates

this monthRegisteredDec 2023PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2023
  • Promised completion1 Oct 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed61 files

Current status

75%58 of 77 units booked

Figures as on 8 Apr 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area27,268 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority Pune
Permissible FSI17795.44
Proposed, not sanctioned17,795 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor ,Industry House ,Road No 3 Opposite HDFC Roman House ,Churchgate Branch

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchland Architect Pvt Ltd
EngineerDeepali Desai
Chartered AccountantKapure and Kapure Chartered Accountant
PartnerRole in project
KALEIDOSCOPE DEVELOPERS PVT. LTD.-

Litigation declared4

CaseCourtStatus
256/2012/2013Civil Judge Senior DivisionHearing in process
1263/2013/2013Civil Judge Senior DivisionCompromise talks are in RCS on Hearing in process
6801/2022/2022Civil Judge Senior DivisionPlaintiff to pay proper stamp duty
1324/2007/2007Civil Judge Senior DivisionPromoter is on negotiation talks with parties

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Oct 2028

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2 KDPL R3 Misty greens II March25 sign off-uploaded.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera form2 KDPL R3 Misty greens DEC 24 Signoff-compressed-uploaded.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - KDPL R3 Misty Greens-23-24-uploaded.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-R-3 KDPL-Sept'24-uploaded.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure-Sold-Unsold-KDPL-R-3-Misty Greens-June'24-uploaded.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17 Form 2-KDPL R3-June'24-uploaded.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 KDPL-R3-FORM 1-JUNE'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Report-KDPL R3-Mar'24-uploaded.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Kdpl-R3 Misty Greens Phase 2-Mar'24-uploaded.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-KDPL R3 MISTY GREENS II-compressed-Mar'24-uploaded.pdf10 Apr 2024
Proforma of Allotment letterFile: Final AFS R3 KDPL-12Mar'24 for uploaded.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-KDPL-R3 Phase II-Dec'23-uploaded.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-R3 Misty Greens Phase 2-Dec'23-uploaded.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A -R3-Phase II-Dec'23-uploaded.pdf3 Jan 2024
Layout approvalFile: Plan 1.pdf5 Dec 2023
Layout approvalFile: Plan 2.pdf5 Dec 2023
Layout approvalFile: Plan 3.pdf5 Dec 2023
Building plan approval or NA orderFile: Plan 1.pdf5 Dec 2023
Building plan approval or NA orderFile: Plan 2.pdf5 Dec 2023
Building plan approval or NA orderFile: Plan 3.pdf5 Dec 2023
Copy of Layout Approval (in case of layout)File: Plan 1.pdf5 Dec 2023
Copy of Layout Approval (in case of layout)File: Plan 2.pdf5 Dec 2023
Copy of Layout Approval (in case of layout)File: Plan 3.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf5 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Revised.PDF5 Dec 2023
Declaration about Commencement CertificateFile: 3FORMAT D-Declaration for Commencement-R3 -Misty greens.pdf5 Dec 2023
CERSAI detailsFile: CERSAI Declaration-R3-KDPL-asset based query.pdf28 Nov 2023
Proforma of Agreement for saleFile: AFS.pdf9 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report-KDPL_ R3 Misty Greens-8Nov23.pdf9 Nov 2023
Copy of the legal title reportFile: Legal Title Report _071123.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3.pdf23 Oct 2023
Layout approvalFile: Plan-1.pdf13 Oct 2023
Layout approvalFile: Plan 2.pdf13 Oct 2023
Layout approvalFile: Plan 3.pdf13 Oct 2023
Building plan approval or NA orderFile: Plan-1.pdf13 Oct 2023
Building plan approval or NA orderFile: Plan 2.pdf13 Oct 2023
Building plan approval or NA orderFile: Plan 3.pdf13 Oct 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrances-R3-KDPL.pdf13 Oct 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbarances-R3-KDPL.pdf13 Oct 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrances-R3-KDPL.pdf13 Oct 2023
Details of encumbrances concerned to LegalFile: Legal Encumbarances-R3-KDPL.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan-1.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan 2.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan 3.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan-1.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf13 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Declartion of Bank Account.pdf12 Oct 2023
Other - LegalFile: Non-Negotiable clauses-R3-KDPL.pdf12 Oct 2023
PAN CardFile: PAN Card.pdf11 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Oct 2023
Declaration about Commencement CertificateFile: Format D-Declaration of Commencement-R3 KDPL.pdf11 Oct 2023
Declaration in FORM BFile: FORM B-Affidavit-R3 KDPL.pdf11 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Annexure A -Pushkar Apte-KDPL-R3.pdf11 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2-Annexure A -Shrikant Paranjape-KDPL R3.pdf11 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Annexure A-Kaleidoscope -Sarang KALE-Director Disclosure1.pdf11 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Annexure A-Kaleidoscope -Chetana KALE-Director Disclosure.pdf11 Oct 2023
Proforma of Allotment letterFile: Proforma Allotment Letter-R3-KDPL.pdf11 Oct 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter -Deviation Report-R3-KDPL.pdf11 Oct 2023

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kaleidoscope R3 Misty Greens Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

Builder: KALEIDOSCOPE DEVELOPERS PVT. LTD.

KALEIDOSCOPE DEVELOPERS PVT. LTD. has 4 registrations on MahaRERA, including Kaleidoscope-R4-MISTY GREENS and Kaleidoscope R3 Misty Greens Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kaleidoscope R3 Misty Greens Phase 2 is delayed beyond 1 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kaleidoscope R3 Misty Greens Phase 2?

The registered promoter entity is KALEIDOSCOPE DEVELOPERS PVT. LTD., a company as per the filing. Its CIN U45202MH2010PTC204617 and GSTIN 27AAECK0069L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kaleidoscope R3 Misty Greens Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kaleidoscope R3 Misty Greens Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kaleidoscope R3 Misty Greens Phase 2?

The professionals named in the filing: Architect: Archland Architect Pvt Ltd; Engineer: Deepali Desai; Chartered Accountant: Kapure and Kapure Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kaleidoscope R3 Misty Greens Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kaleidoscope R3 Misty Greens Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kaleidoscope R3 Misty Greens Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.